SAFE 6 POPM Practice Test
Questions and Correct Detailed
Answers
What is a pattern for splitting Features into Stories? - Answer: Use case scenarios
Which SAFe principle emphasize reducing delays, improving product development flow and enabling
faster feedback? - Answer: Decentralize decision-making
What practices can be used to implement decentralized decision making? - Answer: Create self-
organizing teams, Foster a culture of trust, and Provide the right tools and resources
What is the unit of time on PI roadmaps - Answer: PIs
During which of the following Agile Team events do team members estimate relative story size? -
Answer: Iteration Planning
To calculate WSJF, what teams need to estimate? - Answer: Cost of delay and duration
What is a proxy for duration in WSJF calculation? - Answer: job size
What can Product managers use to quickly estimate the size of Features in Story points? - Answer:
Historical data
What methods can be used to estimate the size of features in long term situations - Answer: Ideal
days and T-shirt sizing
What is one strategy in SAFe 6 for managing unbalanced teams challenge? - Answer: Adjust work
between teams based on forecasted capacity
What is one strategy in SAFe 6 for managing bottlenecks? - Answer: Distribute work to other teams
, What is one strategy in SAFe 6 for managing iteration dependencies? - Answer: Adjust work
sequencing to eliminate same Iteration dependencies
What is one strategy in SAFe 6 for managing complex critical paths - Answer: Adjust work between
teams or split Features and Stories
According to SAFe, what metrics are reported at the Inspect and Adapt event? - Answer: ART
predictability measure
Team Tigers has decided to use the IP Iteration to continue the finalizing Feature delivery work they
have been working on for the past two Iterations. What is one effect Team Tigers might experience
by continuing to stay heads-down rather than using the IP Iteration as intended? - Answer:
Individual team members could lose an opportunity to keep their technical skills current
What is the last activity in Continuous Integration of SAFe's Continuous Delivery Pipeline? - Answer:
Stage
What are the 4 activities in order for continuous Integration in SAFE - Answer: Develop, Build, Test
end to end, Stage
Which role does Product Owner work with to prioritize Enablers for the Team Backlog? - Answer:
System Architect
Which role has design authority for the ART Backlog? - Answer: System Architect
Which role has content authority for the ART Backlog? - Answer: Product Management
What are the questions that help Product Management create a Vision? - Answer: - Where are we
headed with this product or Solution?
- What problem does it solve?
- What Features and benefit hypotheses do we think it provides?
- For whom does it provide benefit?
- What nonfunctional requirements (NFRs), such as performance, reliability, platforms, and so on,
does the Solution deliver?
Questions and Correct Detailed
Answers
What is a pattern for splitting Features into Stories? - Answer: Use case scenarios
Which SAFe principle emphasize reducing delays, improving product development flow and enabling
faster feedback? - Answer: Decentralize decision-making
What practices can be used to implement decentralized decision making? - Answer: Create self-
organizing teams, Foster a culture of trust, and Provide the right tools and resources
What is the unit of time on PI roadmaps - Answer: PIs
During which of the following Agile Team events do team members estimate relative story size? -
Answer: Iteration Planning
To calculate WSJF, what teams need to estimate? - Answer: Cost of delay and duration
What is a proxy for duration in WSJF calculation? - Answer: job size
What can Product managers use to quickly estimate the size of Features in Story points? - Answer:
Historical data
What methods can be used to estimate the size of features in long term situations - Answer: Ideal
days and T-shirt sizing
What is one strategy in SAFe 6 for managing unbalanced teams challenge? - Answer: Adjust work
between teams based on forecasted capacity
What is one strategy in SAFe 6 for managing bottlenecks? - Answer: Distribute work to other teams
, What is one strategy in SAFe 6 for managing iteration dependencies? - Answer: Adjust work
sequencing to eliminate same Iteration dependencies
What is one strategy in SAFe 6 for managing complex critical paths - Answer: Adjust work between
teams or split Features and Stories
According to SAFe, what metrics are reported at the Inspect and Adapt event? - Answer: ART
predictability measure
Team Tigers has decided to use the IP Iteration to continue the finalizing Feature delivery work they
have been working on for the past two Iterations. What is one effect Team Tigers might experience
by continuing to stay heads-down rather than using the IP Iteration as intended? - Answer:
Individual team members could lose an opportunity to keep their technical skills current
What is the last activity in Continuous Integration of SAFe's Continuous Delivery Pipeline? - Answer:
Stage
What are the 4 activities in order for continuous Integration in SAFE - Answer: Develop, Build, Test
end to end, Stage
Which role does Product Owner work with to prioritize Enablers for the Team Backlog? - Answer:
System Architect
Which role has design authority for the ART Backlog? - Answer: System Architect
Which role has content authority for the ART Backlog? - Answer: Product Management
What are the questions that help Product Management create a Vision? - Answer: - Where are we
headed with this product or Solution?
- What problem does it solve?
- What Features and benefit hypotheses do we think it provides?
- For whom does it provide benefit?
- What nonfunctional requirements (NFRs), such as performance, reliability, platforms, and so on,
does the Solution deliver?