Asphalt Paving Level 1 EXAM QUESTIONS AND CORRECT {VERIFIED} ANSWERS NEWEST UPDATE|ALREADY GRADED A+.

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
06-08-2025
Written in
2025/2026

Asphalt Paving Level 1 EXAM QUESTIONS AND CORRECT {VERIFIED} ANSWERS NEWEST UPDATE|ALREADY GRADED A+.

Institution
Asphalt Paving Level 1
Course
Asphalt Paving Level 1









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Asphalt Paving Level 1
Course
Asphalt Paving Level 1

Document information

Uploaded on
August 6, 2025
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

Asphalt Paving Level 1 EXAM QUESTIONS AND CORRECT {VERIFIED} ANSWERS NEWEST
UPDATE|ALREADY GRADED A+.






A full lot of super pave asphalt is what size?

1,000 tons

1,000 to 2000 tons

2000 to 4000 tons

1 days production - (answer)2000 to 4000 tons



Which is not typically used as an asphalt binder in fdot mix designs?

PG 52-28

PG 58-22

PG 62-22

PG 76-22(PMA)

PG 82-22 (PMA) - (answer)PG 62-22



Who cuts the density cores used for verification testing?

The verification technician

The contractor

The independent verification testing technician

None of the above - (answer)The contractor



A full lot is composed of 5 sublots and 4 cores per lot T/F - (answer)False



What is the most important for consistent compaction of asphalt mix?

The mix is hotter in temperature

The mix is colder in temperature

The mix is uniform in temperature

, Asphalt Paving Level 1 EXAM QUESTIONS AND CORRECT {VERIFIED} ANSWERS NEWEST
UPDATE|ALREADY GRADED A+.






Temperature of the mix does not affect compaction - (answer)The mix is uniform in temperature



Referring to general stationing guidelines, R1 would be ____ than R2

Closer to centerline

Closer to outside shoulder

Closure to the inside shoulder

Both A and C - (answer)Both A and C



While using the rolling straightedge, if the needle goes in the red zone indicating an unacceptable high
spot in the section, you then - (answer)Mark the pavement where the needle first goes into the red zone
and place another mark where the needle leaves the red zone and continue



For bridge approach slabs, the 15 foot manual straightedge should be set so ____ is on the bridge deck.

1 inch

Exactly 1/2 of the straightedge

The entire straightedge

None of the above - (answer)1 inch



For the first transverse joint on a project place the ___ on the new pavement while overlapping the
transverse joint by one inch.

4 foot level

15 foot manual straight edge

Rolling straightedge

All the above - (answer)15 foot manual straight edge



When calibrating to check the low side of the rolling straight edge:
Free
Get access to the full document:
Download

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
GeeCAst

Get to know the seller

Seller avatar
GeeCAst Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
126
Member since
11 months
Number of followers
0
Documents
3001
Last sold
1 day ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions