100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

PJM Transmission Exam Study 2025 Questions and Answers

Rating
-
Sold
-
Pages
45
Grade
A+
Uploaded on
04-08-2025
Written in
2025/2026

PJM Transmission Exam Study 2025 Questions and Answers

Institution
PJM
Course
PJM











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PJM
Course
PJM

Document information

Uploaded on
August 4, 2025
Number of pages
45
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PJM Transmission Exam Study 2025
Questions and Answers


During System Restoration, what is the optimal Frequency Range? - --CORRECT

ANSWER--59.75 - 61 Hz

The 500 kV system has normal bus voltages between? - --CORRECT ANSWER--

500 to 550 kV

When Connecting 2 islands, the operator must match? - --CORRECT ANSWER--

Voltage, Phase Angle and Frequency

What are the Minimum Source Requirements for a 500kV line? (Gen/mile and

load/mile) - --CORRECT ANSWER--30 MW Gen/mile of energized 500 kV and

20 MW Load/mile of energized 500 kV

When will PJM issue a Minimum Generation Alert? (how many MW under normal

operating limits) - --CORRECT ANSWER--When expected generation levels fall

within 2500 MW of normal operating limits

When a thunderstorm is nearing the BES should auto-reclosing be turned on? - --

CORRECT ANSWER--Yes




....COPYRIGHT ©️ 2025 ALL RIGHTS RESERVED...TRUSTED & VERIFIED 1

,What does SCADA stand for? - --CORRECT ANSWER--Supervisory Control &

Data Acquisition

What does IROL stand for? - --CORRECT ANSWER--Interconnection Reliability

Operating Limit

What does eDART stand for? - --CORRECT ANSWER--Dispatcher Application

and Reporting Tool

What is eDART used for? (Electronic Disp Reporting Tool) - --CORRECT

ANSWER--It is used for: Generation Outage Scheduling, Instantaneous Reserve

Checks, Generator Reactive Capabilities and to enter and submit switching

What direction do VARS flow? - --CORRECT ANSWER--From HIGH Voltage

to LOW Voltage

What direction do MW flow? - --CORRECT ANSWER--From HIGH Phase

Angle to LOW Phase Angle

Which of the following factors are NOT used in forecasting load?




1) Weather Forecast

2) Historical Load Forecast

3) Historical Weather Data

4) Locational Marginal Pricing (LMP) Data - --CORRECT ANSWER--4


....COPYRIGHT ©️ 2025 ALL RIGHTS RESERVED...TRUSTED & VERIFIED 2

,What one-way communication system is used to disseminate info to local call

centers? - --CORRECT ANSWER--All-Call

The 3 categories of messages issued by PJM All-Call all EXCEPT:




1) Operational

2) Informational

3) Conflicting Interchange Values

4) Emergency Procedures - --CORRECT ANSWER--3

When should, transmission outages should be submitted to PJM to avoid

cancellation and to be considered "on time?' - --CORRECT ANSWER--First day

of Month Prior to the Outage

What report will be requested by PJM when a Max Generation Alert is issued? - --

CORRECT ANSWER--Supplementary Status Report (SSR)

The loss of a large generation unit on the PJM system can be detected by

monitoring: - --CORRECT ANSWER--Frequency and PJM Area Control Error

(ACE)

The PJM system is operated such that the contingency flow is less than the: - --

CORRECT ANSWER--Emergency Rating




....COPYRIGHT ©️ 2025 ALL RIGHTS RESERVED...TRUSTED & VERIFIED 3

, When ordered a 5% voltage reduction should be taken on: - --CORRECT

ANSWER--The Distribution System

TOs are required to report "Hot Line Work" on what voltage levels? - --

CORRECT ANSWER--345 kV and Above

Load dump rating of an EHV line is determined by? - --CORRECT ANSWER--

115% of the facility's 4 hour Emergency Rating

During System Restoration, will closing additional tie lines increase the strength &

stability of an interconnected area? - --CORRECT ANSWER--Yes

Which of the following factors influence load forecast (3)?




1) Weather

2) Temperature

3) Reactive Reserves

4) Day of the week - --CORRECT ANSWER--1, 2, 4

During system restoration, what is the voltage range the system should be kept

between? - --CORRECT ANSWER--90% and 105% maintain voltage profile

between for system restoration

PJM will coordinate and direct all restoration lines of what voltage levels? - --

CORRECT ANSWER--500kV and above


....COPYRIGHT ©️ 2025 ALL RIGHTS RESERVED...TRUSTED & VERIFIED 4

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KatelynWhitman West Virginia University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1106
Member since
2 year
Number of followers
482
Documents
34142
Last sold
2 days ago
Golden Quill Emporium Store

Get Yourself Well-Researched Study Materials to Ace Your Online& Actual Exam Tests with Confidence. STUDY LIKE A PRO WITH A WELL FORMATTED Q&A MATERIALS.

3.6

241 reviews

5
96
4
39
3
54
2
20
1
32

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions