100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Solution Manual and Answer Guide Electrical Wiring Commercial 18th Edition by Phil Simmons, Ray C. Mullin, Mark Ode| All Chapters 1-21 Verified, Complete Latest Solutions

Rating
-
Sold
-
Pages
192
Grade
A+
Uploaded on
04-08-2025
Written in
2025/2026

Solution Manual and Answer Guide Electrical Wiring Commercial 18th Edition by Phil Simmons, Ray C. Mullin, Mark Ode| All Chapters 1-21 Verified, Complete Latest Solutions

Institution
Solution Manual
Course
Solution Manual











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Solution Manual
Course
Solution Manual

Document information

Uploaded on
August 4, 2025
Number of pages
192
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • 18th edition

Content preview

Solution Manual

Electrical Wiring Commercial,
By Phil Simmons 18th Edition


18th Edition




1|Page

,Solution And Answer Guide

CHAPTER 1: COMMERCIAL BUILDING PLANS AND SPECIFICATIONS


TABLE OF CONTENTS

Review .......................................................................................................................................................... 1



Note To Instructor: It Is Recommended That Students Be Required To Respond, Where
Appropriate, With Answers That Are Complete Sentences.


REVIEW

Refer To The National Electrical Code Or The Working Drawings When Necessary. Where
Applicable, Responses Should Be Written In Complete Sentences.

1. What Section Of A Commercial Building’s Specification Contains A List Of
Contract Documents?

Answer: A List Of The Contract Documents Is Contained In General Clauses And
Conditions. A Listing Of The Commercial Building Contract Documents Is Presented
In This Chapter Under The Heading ―Commercial Building Plans.‖ The Instructor May
Wish To Have The Students Check Over This Listing And Compare It With The Plans
Provided.
2. The Requirement For Temporary Light And Power At The Job Site Will Be Found In What
Portion Of A Commercial Building’s Specification?

Answer: The Supplementary General Conditions Specifies The Job Site Requirements
For Temporary Light And Power. In Some Contracts, This Electrical System Becomes
The Responsibility Of The General Contractor; In Other Contracts, It Is The Electrical
Contractor’s Responsibility To Install And Maintain The Temporary Electrical System.
The Instructor May Wish To Refer The Student To Nec Article 590 And Discuss The
Requirements In Detail.




2|Page

,3. The Electrician Uses The Schedule Of Working Drawings For What Purpose?

Answer: The Electrician Uses The Schedule Of Working Drawings To Determine
Whether All Of The Drawings Are At Hand. The Information On ―The Other Sheets‖
May Be Very Important, Especially In Coordinating With Other Contractors.

4. Complete The Following Items By Indicating The Letter(S) Designating The
Correct Source(S) Of Information:


No. Answer Item Information

4. Sections Ceiling Height Sections, Sheet A6

5. Electrical Electrical Electrical Symbol Schedule, Chapter 2,
Symbol Receptacle Style Figure 2–6
Schedule

6. Electrical Electrical Electrical Layout Drawings, Sheets
Layout Outlet Location El, E2, And E3
Drawing
s

7. Elevations Exterior Wall Finishes Elevations, Sheets A4 And A5

8. Site Plan Grading Elevations Site Plan, Sheet A4

9. Electrical Panelboard Schedules Electrical Layout Drawings, Sheet E4
Layout
Drawing
s

10. Architectural Room Width Architectural Floor Plan, Sheets Al,
Floor Plan A2, And A3

11. Architectural Swing Of Door Architectural Floor Plan, Sheets Al, A2,
Floor Plan And A3




3|Page

, 12. Sections View Of Interior Wall Sections, Sheet A6

Match The Items On The Left With Those On The Right By Writing The Letter Designation
Of The Appropriate Organization From The List On The Right.


13. Nec Electrical Code National Electrical Code (Nec)

14. Iaei Electrical Inspectors International Association Of Electrical
Inspectors (Iaei)

15. Nfpa Fire Codes National Fire Protection Association
(Nfpa)

16. Iesna Lighting Information Illuminating Engineering Society Of
North America (Iesna)

17. Ul Listing Service Underwriters Laboratories, Inc. (Ul)

18. Nema Manufacturers’ National Electrical Manufacturers
Standards Association (Nema)

19. Pe Seal Professional Engineer (Pe)


Match The Items On The Left With Those On The Right By Writing The Letter Designation
Of The Proper Level Of Nec Interpretation From The List On The Right.

20. With Allowed By The Code Shall Be Permitted, Or Shall Not Be
Special Required, Nec
Permission

21. With May Be Done Shall Be Permitted, Or Shall Not
Special Be Required, Nec
Permission




4|Page

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
geniuspro West Virgina University
View profile
Follow You need to be logged in order to follow users or courses
Sold
473
Member since
1 year
Number of followers
23
Documents
649
Last sold
6 hours ago
GENIUSPRO

Are you looking for expertly crafted study guides, notes, and assignments to help you excel in your courses? Look no further! Geniuspro offer a wide range of high-quality academic resources on Stuvia, designed to give you a competitive edge and make your study sessions more effective. Whether you're prepping for finals, looking to stay ahead in class, or needing help with assignments, email me and i'll get you covered

4.0

62 reviews

5
34
4
11
3
6
2
2
1
9

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions