Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Jakes UNION PACIFIC test questions and verified correct answers

Beoordeling
-
Verkocht
-
Pagina's
11
Cijfer
A+
Geüpload op
02-08-2025
Geschreven in
2025/2026

On the engineer's previous start, the total trip time was 13 hours and 20 minutes. How much rest was required prior to this start? - correct answer 11 hours 20 minutes Once the crew receives their paperwork, what documents must be reviewed as part of the job briefing? - correct answer System general orders, subdivision general orders, track warrants for bullitens and supt. Bullitens The 2 unit locomotive consist is shutdown and blue flagged. Can the crew start the locomotives while they are blue flagged? - correct answer No The conductor is on the leading end of the rear locomotive and instructs the engineer to back up 10 cars to clear the spring switch on the roundhouse lead. Do they need to communicate with the Roundhouse Supervisor before moving the locomotives and departing the facility? - correct answer Yes What is required before the engineer can change direction to clear the roundhouse lead? - correct answer Must switch by hand, and communicate with roundhouse supervisor Is any communication between the crew and the bedlam yardmaster required before they can occupy the east switching lead at bedlam for their movement towards the bowl tracks? - correct answer Determine if RCL Zone E is activated, contact yard master After departing the roundhouse, the crew heads east. After stopping, the conductor will be using hand signals while protecting the shoving movement (light power) westward towards the bowl lead. Is a radio job briefing required prior to initiating the movement? - correct answer No, after a clear understanding that hand signals will be used The Local crew will need to switch out their cars from bowl track 4. Is any protection required before fouling bowl track 4 during humping operations? - correct answer The crew must job brief the track being fouled, and request protection from the employee controlling switches

Meer zien Lees minder
Instelling
UNION PACIFIC
Vak
UNION PACIFIC

Voorbeeld van de inhoud

Jakes UNION PACIFIC test
On the engineer's previous start, the total trip time was 13 hours and 20 minutes. How much
rest was required prior to this start? - correct answer 11 hours 20 minutes



Once the crew receives their paperwork, what documents must be reviewed as part of the job
briefing? - correct answer System general orders, subdivision general orders, track warrants for
bullitens and supt. Bullitens



The 2 unit locomotive consist is shutdown and blue flagged. Can the crew start the locomotives
while they are blue flagged? - correct answer No



The conductor is on the leading end of the rear locomotive and instructs the engineer to back
up 10 cars to clear the spring switch on the roundhouse lead. Do they need to communicate
with the Roundhouse Supervisor before moving the locomotives and departing the facility? -
correct answer Yes



What is required before the engineer can change direction to clear the roundhouse lead? -
correct answer Must switch by hand, and communicate with roundhouse supervisor



Is any communication between the crew and the bedlam yardmaster required before they can
occupy the east switching lead at bedlam for their movement towards the bowl tracks? - correct
answer Determine if RCL Zone E is activated, contact yard master



After departing the roundhouse, the crew heads east. After stopping, the conductor will be
using hand signals while protecting the shoving movement (light power) westward towards the
bowl lead. Is a radio job briefing required prior to initiating the movement? - correct answer No,
after a clear understanding that hand signals will be used



The Local crew will need to switch out their cars from bowl track 4. Is any protection required
before fouling bowl track 4 during humping operations? - correct answer The crew must job
brief the track being fouled, and request protection from the employee controlling switches

, Jakes UNION PACIFIC test
The crew stops the movement on the switching lead to line the switch to bowl track 4. What is
required before operating the switch? - correct answer The crew member operating switch
must use LISOPP



While coupling bowl track 4, the conductor discovers a misaligned drawbar. Will the conductor
need to establish "Red Zone Protection" to adjust the drawbar? - correct answer Yes, must
establish red zone protection



What other requirements, if any, need to be met before making the coupler adjustment to the
car? - correct answer Apply sufficent amount of hand breaks to prevent moving, allow slack to
adjust



After switching their cars, the crew pulls down for an air test. What air tests and inspections, il
any, will be required before departing Bedlam and proceeding to Starkville and the Industrial
Lead to complete their work? - correct answer Class 1 air brake test. Lsd and crack inspection



After completing a job briefing regarding the switching moves to be made, the conductor
requests "Red Zone Protection" through a face-to-face job briefing with the engineer. What
action is required by the engineer before the conductor can foul the track? - correct answer
Must fully appy brakes and confirm red zone face to face, or over radio



The conductor heads back to make the cut on the train. Before cutting away from the rear
portion, what securement proçedure should the crew use in the departure yard? - correct
answer A minimum of 3 hand brakes followed by release test



The defective car that the crew will be setting out is a loaded centerbeam flat car that is not
equipped with horizontal handholds or two vertical handholds spaced shoulder width apart.
After clearing "Red Zone Protection" and cutting away, can the conductor ride the rear platform
of the centerbeam flat car while pulling out of the track? - correct answer Yes

Geschreven voor

Instelling
UNION PACIFIC
Vak
UNION PACIFIC

Documentinformatie

Geüpload op
2 augustus 2025
Aantal pagina's
11
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$12.29
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
Beckham

Maak kennis met de verkoper

Seller avatar
Beckham Teachme2-tutor
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2
Lid sinds
2 jaar
Aantal volgers
0
Documenten
199
Laatst verkocht
9 maanden geleden

0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen