Gantt Chart - Answer 1917, Developed by Henry L. Gnatt, display production control technique simplified to bar chart Critical Path Method (CPM) - Answer Developed by Morgan Walker in 1956. Made for Dupont chemical plants, uses technology PERT - Answer Program Evaluation Research Task, 1957, developed by the navy with three time estimates for activities Precedence Network - Answer 1961 John Fondahl Why Planning, Scheduling and Control - Answer Complexity of construction projects, Control resource consumption, Communicate the construction plan, Establish production goals, Monitor and measure project progress, Manage changes Construction Planning - Answer The process of determining how a project will be carried out Construction Scheduling - Answer Process to determine when activities need to be started and completed Schedule - Answer time based arrangement of activities planned to take place in order to efficiently complete a project, may also convey the logical relationships between activities Project Control - Answer Project control is an active process to monitor and update the construction plan and the schedule Monitoring - Answer Collect feedback about the progress of a project from various sources (feild operations, accounting, equip management, etc) Updating - Answer Evaluate and forecast the actual progress of a project, then correct the target plan to economically the projects overall objectives Bar Charts - Answer Simple and time-scaled presentations that show how major work activities are scheduled

Montrer plus Lire moins
Établissement
CM 4101
Cours
CM 4101









Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
CM 4101
Cours
CM 4101

Infos sur le Document

Publié le
30 juillet 2025
Nombre de pages
5
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Aperçu du contenu

Construction Scheduling 4101 Study
Guide Exam and Actual Answers.
Gantt Chart - Answer 1917, Developed by Henry L. Gnatt, display production control technique
simplified to bar chart



Critical Path Method (CPM) - Answer Developed by Morgan Walker in 1956. Made for Dupont
chemical plants, uses technology



PERT - Answer Program Evaluation Research Task, 1957, developed by the navy with three
time estimates for activities



Precedence Network - Answer 1961 John Fondahl



Why Planning, Scheduling and Control - Answer Complexity of construction projects, Control
resource consumption, Communicate the construction plan, Establish production goals, Monitor
and measure project progress, Manage changes



Construction Planning - Answer The process of determining how a project will be carried out



Construction Scheduling - Answer Process to determine when activities need to be started and
completed



Schedule - Answer time based arrangement of activities planned to take place in order to
efficiently complete a project, may also convey the logical relationships between activities



Project Control - Answer Project control is an active process to monitor and update the
construction plan and the schedule



Monitoring - Answer Collect feedback about the progress of a project from various sources
(feild operations, accounting, equip management, etc)



Updating - Answer Evaluate and forecast the actual progress of a project, then correct the
target plan to economically the projects overall objectives

, Bar Chart Advantages - Answer Simple and Easy to use



Bar Chart Disadvantages - Answer Project status cannot be determined, Needs for schedule
adjustments cannot be determined, Activities for possible project acceleration cannot be
determined, Uses extra links to show relationships between activities



Time Scaled Network Model (Activity Length) - Answer Represented by the length of the open
bar, Stated in days



Time Scaled Network Model (Activity Restraint) - Answer Shown using a heavy vertical line
with an arrow head



Time Scaled Network Model (Activity Description) - Answer Placed on the top of each bar



Time Scaled Network Model (Duration) - Answer In Days, placed at the bottom left hand
portion of each activity, or inside the bar



Free Float (Bar Chart) - Answer Shown as a horizontal dotted line between each activity



Networks - Answer Graphic representations using nodes and links



Network Based Scheduling Techniques - Answer Graphic Representation + Mathematical
Theory



Activity - Answer Discrete part of a project that can be identified for planning, scheduling,
monitoring, and controlling the construction project. Activities consume time, recources
(usually), have a start/finish, are assignable and measurable



Event - Answer An event is the point in time or an instant at which status of completion of a
project or an activity can be defined



Duration - Answer The duration of an activity is the period of time that will be consumed in
completing a task
$12.49
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
TestSolver9 Webster University
Voir profil
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
764
Membre depuis
2 année
Nombre de followers
126
Documents
25317
Dernière vente
1 jours de cela
TESTSOLVER9 STORE

TOPNOTCH IN LEARNING MATERIALS,(EXAMS,STUDYGUIDES NOTES ,REVIEWS,FLASHCARDS ,ALL SOLVED AND PACKAGED.OUR STORE MAKE YOUR EDUCATION JOURNEY EFFICIENT AND EASY.WE ARE HERE FOR YOU FEEL FREE TO REACH US OUT .

3.6

136 revues

5
61
4
19
3
22
2
10
1
24

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions