Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 3 van de 21 pagina's
Tentamen (uitwerkingen)

CDT exam Questions with Correct Answers (solved)

Document preview thumbnail
Voorbeeld 3 van de 21 pagina's

CDT exam Questions with Correct Answers (solved) CDT exam Questions with Correct Answers (solved) CDT exam Questions with Correct Answers (solved) CDT exam Questions with Correct Answers (solved) CDT exam Questions with Correct Answers (solved) CDT exam Questions with Correct Answers (solved) CDT exam Questions with Correct Answers (solved)

Voorbeeld van de inhoud

CDT exam Questions with Correct
ii ii ii ii ii




Answers (solved) ii ii

ii
ii

1. iiThe iimethod iiof iicomputation iiof iiContractor's iioverhead iiand iiprofits iifor iiChange
iiOrder ii
ii
prices, iiwhere iiboth iiadditions iiand iideletions iiare iiinvolved, iiis iifound iiin
iithe:
ii
a)
iiAgreement.
ii
b) iiConditions iiof iithe

iiContract.
ii
c) iiDivision

ii01.
ii
d) iiInstructions iito iiBidders. ii- iiCORRECT iiANSWER-b) iiConditions iiof iithe
iiContract.
ii
ii
2. iiGeneral iiRequirements iiare iipart
iiof:
ii
a) iiSupplementary

iiConditions.
ii
b) iiBidding


iiRequirements.
ii
c)
iiSpecifications.


d) iiSummary iiof iiWork. ii- iiCORRECT ii ANSWER-c)
iiSpecifications.
ii

3. iiThe iithree iiessential iiconsiderations iiin iithe iievaluation iiof iia iiproduct iiare: ii
a) Requirements, iiCriteria, iiand iiTests. ii
b) Costs, iiMaintenance, iiand iiInstallation. ii
c) Life iiCycle iiCost, iiInstallation iiCost, iiand iiMaintenance iiCost. ii
d) Case iistudies, iiFailures, iiand iiProblems. ii- iiCORRECT iiANSWER-a) iiRequirements,
iiCriteria, iiand iiTests. ii
ii
ii
4. iiWhose iiresponsibility iiis iiit iito iifurnish iithe iiShop
iiDrawings?
ii
a) iiThe

iiArchitect/Engineer
ii
b) iiThe

iiContractor
ii
c) iiThe

iiOwner

,d) iiThe iiSubcontractor ii - ii CORRECT ii ANSWER-b) ii The
iiContractor
ii

5. iiThe iidivision iiof iithe iiWork iiamong iimultiple iiprime iiContracts iiis iidescribed
iiin:
ii
a) iiInstructions iito

iiBidders.
ii
b) iiSupplementary

iiConditions.
ii
c) iiDivision

ii01.
ii
d) iiSpecial iiConditions. ii- iiCORRECT iiANSWER-c) iiDivision
ii01.
ii

6. iiDuring iithe iiProject iiConception iiStage, iithe iiA/E iimay iibe iiretained iito: ii
a) Develop iioutline iispecifications ii
b) Describe iithe iicharacter iiof iithe iimechanical iisystem ii
c) Prepare iirenderings ii
d) Assist iiin iifinancial iifeasibility iistudies ii- iiCORRECT iiANSWER-d) iiAssist iiin iifinancial
iifeasibility iistudies ii
ii

7. iiWhat iiis iithe iimain iipurpose iiof iiMasterFormat? ii
a) for iischeduling, iivalue iimanagement, iirecording iiof iidesign iidata iiand iimanaging iicosts.
ii

b) used iiduring iithe iiplanning iistage iiof iia iiproject. ii
c) to iiorganize iithe iiProject iiManual, iireference iikeynotes iiand iidetailed iicost iiestimates. ii
d) when iithere iiis iia iistandardized iineed iifor iiinformation iito iiappear iiupon iieach iipage iiof iia
iiproject iimanual. ii- iiCORRECT iiANSWER-c) iito iiorganize iithe iiProject iiManual,

iireference iikeynotes iiand iidetailed iicost iiestimates. ii
ii

8. iiThe iiperson iiwho iibecomes iisecondarily iiliable iifor iianother's iidebt iior iiperformance iiis
iicalled iithe: ii

a) Guarantee ii
b) Warrantor ii
c) Guarantor ii
d) Warrantee ii- iiCORRECT iiANSWER-c) iiGuarantor ii
ii

9. iiIntegrated iiprojects iiare iidistinguished iiby iiall iiof iithe iifollowing iicharacteristics iiexcept: ii
a) Development iiof iivirtual iiproject iimodel iithrough iiinput iifrom iia iicollaborative iiteam ii
b) Trust-based iicollaboration iibetween iiproject iiteam iimembers ii
c) Maximized iiefficiency iithrough iidesign, iifabrication, iiand iiconstruction ii
d) "Just iias iineeded" iiteam iiinvolvement iito iireduce iiowner's iipre-construction iiexpenses ii-
iiCORRECT iiANSWER-d) ii"Just iias iineeded" iiteam iiinvolvement iito iireduce iiowner's

iipreconstruction iiexpenses ii
ii
ii
10. iiOutline iiSpecifications iiare iiwritten
iifor

, ii
a) iionly iiDivisions ii02-14 iiwhere iiactual iiproducts iiare
iidiscussed
ii

ii
b) iiDivisions ii01-
49
c) iionly iiDivisions ii01-14 ii(excluding iimechanical iiand
iielectrical)


d) iithe iiexclusive iiuse iiof iithe iiA/E ii- iiCORRECT iiANSWER-b) iiDivisions ii01-
49
ii

11. iiAn iiexample iiof iia iiMasterFormat iiLevel ii3 iispecification iiSection iiis: ii
a) 05 ii00 ii00 iiMetals. ii
b) 05 ii20 ii00 iiMetal iiJoists. ii
c) 05 ii21 ii00 iiSteel iiJoist iiFraming. ii
d) 05 ii21 ii19 iiOpen iiWeb iiSteel iiJoist iiFraming. ii- iiCORRECT iiANSWER-d) ii05 ii21 ii19
iiOpen iiWeb iiSteel iiJoist iiFraming. ii
ii

12. iiWhat iiactivities iitake iiplace iiin iithe iiProject iiConception iiStage? ii
a) The iiengineers iidevelop iithe iimechanical iiand iielectrical iisystems. ii
b) The iisite iiis iiselected iiand iithe iidemolition iiis iidone. ii
c) Feasibility iistudies iiand iibudget iiis iiset. ii
d) The iiprogram iiis iievaluated iiand iithe iiengineers iiare iiselected. ii- iiCORRECT
iiANSWER-c) iiFeasibility iistudies iiand iibudget iiis iiset. ii
ii

13. iiThe iidocument iirecommended iito iiorganize iipreliminary iiconstruction iiinformation iiinto
iia ii
ii
standard iiorder iion iithe iibasis iiof iisystems iiand iiassemblies
iiis:
ii
a)
iiMasterFormat
ii
b)
iiUniformat
ii
c) iiOutline

iiSpecifications


d) iiProject iiManual ii- iiCORRECT iiANSWER-b)
iiUniformat
ii

14. iiAll iidesign iiand iiconstruction iidrawings iican iibe iiclassified iias iione iiof iitwo iitypes iiof
iiviews: iia) iiNumeric iiand iigraphic. ii

b) Vertical iiand iihorizontal. ii
c) Scaled iiand iinonscaled. ii ii
d) Exterior iiand iiinterior. ii- iiCORRECT iiANSWER-c) iiScaled iiand iinonscaled. ii
ii

15. iiSubstitution iirequirements iiand iiprocedures iiduring iibidding ii
a) Are iinot iiallowed iiunder iimost iipublic iibidding iistatutes. ii
b) Are iimodified iiby iithe iiSupplementary iiConditions. ii

Documentinformatie

Geüpload op
29 juli 2025
Aantal pagina's
21
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
$13.99

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Edunursepro
4.0
(45)
Verkocht
179
Volgers
10
Items
10385
Laatst verkocht
2 dagen geleden



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen