Enterprise Asset Management (EAM)
Master data plays an important role in the SAP ERP Plant Maintenance Process. You
are creating master data for equipment that you keep in one of your work centers. While
creating this master data, you can create data for which of the following views? - answer
Structure
Organization
You are reviewing a Plant Maintenance Order and want to display expected costs for
this. In what ways can you display these expected costs? - answer Cost element level
Value category level
During the plant maintenance process, the job ticket is printed before the release of the
maintenance order. - answer False
A client is implementing SAP ERP Enterprise Asset Management. You are asked to
explain the organizational units associated with SAP ERP Enterprise Asset
Management. What all would you include? - answerLocation
Maintenance planning plant
Maintenance plant
Planner group
To assign a BOM to an equipment master record you assign a material number to the
______________ field. - answerConstruction type
If a material piece of equipment is to be uniquely identifiable in terms of inventory
management, what entry is required in the material master? - answerSerial number
profile
You are about to close a service notification. All activities must be closed before a
notification can be closed. - answerFalse
What are valid options for linking the material, serial number, and equipment? -
answer*A material and serial number can manually be assigned to an existing
equipment.
*The system creates the equipment and serial number automatically during the creation
of the equipment master record.
*The system creates the equipment and serial number automatically during a posting.
You are assigning a material to a maintenance order. When are availability checks
performed? - answer*An availability check can be performed when the material is
assigned.
*An automatic availability check is performed when the order is released.
Master data plays an important role in the SAP ERP Plant Maintenance Process. You
are creating master data for equipment that you keep in one of your work centers. While
creating this master data, you can create data for which of the following views? - answer
Structure
Organization
You are reviewing a Plant Maintenance Order and want to display expected costs for
this. In what ways can you display these expected costs? - answer Cost element level
Value category level
During the plant maintenance process, the job ticket is printed before the release of the
maintenance order. - answer False
A client is implementing SAP ERP Enterprise Asset Management. You are asked to
explain the organizational units associated with SAP ERP Enterprise Asset
Management. What all would you include? - answerLocation
Maintenance planning plant
Maintenance plant
Planner group
To assign a BOM to an equipment master record you assign a material number to the
______________ field. - answerConstruction type
If a material piece of equipment is to be uniquely identifiable in terms of inventory
management, what entry is required in the material master? - answerSerial number
profile
You are about to close a service notification. All activities must be closed before a
notification can be closed. - answerFalse
What are valid options for linking the material, serial number, and equipment? -
answer*A material and serial number can manually be assigned to an existing
equipment.
*The system creates the equipment and serial number automatically during the creation
of the equipment master record.
*The system creates the equipment and serial number automatically during a posting.
You are assigning a material to a maintenance order. When are availability checks
performed? - answer*An availability check can be performed when the material is
assigned.
*An automatic availability check is performed when the order is released.