AIPM Exam 1 questions with accurate answers
____ is "bottom up method" and works within Work Breakdown
Structure (WBS) Ans✓✓✓ Engineering
____ states that as the quantity of a product produced doubles, the
recurring cost per unit decreases a a fixed rate or constatn percentage
Ans✓✓✓ learning curve
_____ explains how interfaces are developed during the design solution
process (non-proprietary) Ans✓✓✓ Open systems
_____ is to establish and maintain management plans that direct the
technical effort of a program and against which technical progreass can
be assessed in terms of cost, scheulde and risk Ans✓✓✓ CAIV
At what level are advanced technology demonstrations (ATD) managed
and conducted? Ans✓✓✓ Service level
Critical Acquisitin Positions (CAP) are designated at what level
Ans✓✓✓ LTC and above
How is a risk statement structured Ans✓✓✓ if, then
Maintains the traceability of all requirements through design and test,
documents all changes and records ratationale are key functions of what
Ans✓✓✓ Requirements Management
, Product Design, manufacturing, business processes and sustainment
process are optimized by utilization of what? Ans✓✓✓ Mulitfuinctional
teams
Reduce risk to government and contract office Ans✓✓✓ IPPD
Tech processes for realizing systems? Upside down "V" Ans✓✓✓ the
right side of the "V"
What 3 things fall under procurement costs Ans✓✓✓ o Weapon system
costs
o support items
o cost of the systems initial spares
What ACAT level is reviewed by ASARC? Who is the Chair Ans✓✓✓
ACAT 1C & II; ATL/AAE
What ACAT level is reviewed by DAB? Who is the Chair Ans✓✓✓
ACAT 1D-MDAP; Under Secretary for AT&L/DAE
What ACAT level is reviewed by IPR? Who is the Chair Ans✓✓✓
ACAT III, IPR Chair/PEO
____ is "bottom up method" and works within Work Breakdown
Structure (WBS) Ans✓✓✓ Engineering
____ states that as the quantity of a product produced doubles, the
recurring cost per unit decreases a a fixed rate or constatn percentage
Ans✓✓✓ learning curve
_____ explains how interfaces are developed during the design solution
process (non-proprietary) Ans✓✓✓ Open systems
_____ is to establish and maintain management plans that direct the
technical effort of a program and against which technical progreass can
be assessed in terms of cost, scheulde and risk Ans✓✓✓ CAIV
At what level are advanced technology demonstrations (ATD) managed
and conducted? Ans✓✓✓ Service level
Critical Acquisitin Positions (CAP) are designated at what level
Ans✓✓✓ LTC and above
How is a risk statement structured Ans✓✓✓ if, then
Maintains the traceability of all requirements through design and test,
documents all changes and records ratationale are key functions of what
Ans✓✓✓ Requirements Management
, Product Design, manufacturing, business processes and sustainment
process are optimized by utilization of what? Ans✓✓✓ Mulitfuinctional
teams
Reduce risk to government and contract office Ans✓✓✓ IPPD
Tech processes for realizing systems? Upside down "V" Ans✓✓✓ the
right side of the "V"
What 3 things fall under procurement costs Ans✓✓✓ o Weapon system
costs
o support items
o cost of the systems initial spares
What ACAT level is reviewed by ASARC? Who is the Chair Ans✓✓✓
ACAT 1C & II; ATL/AAE
What ACAT level is reviewed by DAB? Who is the Chair Ans✓✓✓
ACAT 1D-MDAP; Under Secretary for AT&L/DAE
What ACAT level is reviewed by IPR? Who is the Chair Ans✓✓✓
ACAT III, IPR Chair/PEO