Terms in this set (276)
What are the four teams Owner, Design, Installation, and Management
that comprise the overall
Project Team?
Who would belong to the Anyone with Consultant in their title except the
Design team? moving consultant
Which groups make up Developer, Construction Manager, and Building
the Management Team? Management Agency
The End-User, Facility Owner
Manager and Building
Committee comprise
which team within the
Project Team?
Which group represent Project Managers, Designers and Installers
the generic roles that are
important to the Project
process?
Which project Schedule, Size, Type, Complexity, and Procurement
characteristics must be Requirements
considered in order to
determine which method
is best suited for a
particular project?
, What is an important Technical Support Funding
aspect of funding that has
a direct impact on the
project process and
design/installation?
Whether a construction Programming, Building Design, AV Bid, and Move-In
project is large or small,
which milestones must be
achieved in a typical
schedule?
What type of project is a Long term projects with extended project cycles
typical Consultant-Led
Design-Bid-Build contract
structure good for?
What is the risk in using an System and infrastructure design and facility
OFE/Integrator Installed functionality may suffer
contract structure?
What are some of the Financial Stability, Current Workload, and Company
important project scope Credentials
and size considerations in
selecting an AV provider?
What type of document RFQ
typically includes Project
Size Requirements,
Corporate Profile, Team
Personnel, and Warranty
Response Time?
a significant difference Negotiate with the highest ranking firm to finalize the
between the Two- contract
Envelope Bid
Method and the
Qualifications- Based
Selection Method?