Solutions Manual for Electrical Wiring Commercial18th ssss ssss ssss ssss ssss s
ssss Edition byPhilSimmonsA+ ssss ss s ss
Solution s s s s and Answer Guide ssss ssss
SIMMONS/ODE, S S S S ELECTRICAL S S S S WIRING S S S S COMMERCIAL, S S S S 18E S S S S © S S S S 2024,
SSSS9780357767115; CHAPTER SSSS S S S S 1:COMMERCIAL S S S S BUILDING PLANS SSSS SSSS AND SSSS SPECIFICATIONS
TABLE S S S S OF S S S S CONTENTS
Review ................................................................................................................................... 1
Note to instructor: It is recommended that students
ssss ssss ssss ssss ssss ssss ssss s s s s be required to
ssss ssss
ssss respond, where ssss s s s s appropriate, s s s s with s s s s answers s s s s that s s s s are
s s s s complete sentences. ssss
REVIEW
Referto the National ElectricalCodeorthe workingdrawings whennecessary.Where
s ss ss ss s s s ss s ss ss s
ssss applicable, responses should be written in complete sentences.
ssss ssss ssss ssss ssss ssss ssss
1. Whatsectionofacommercialbuilding’sspecificationcontainsalist ofcontract
s s s s s s s s s ss s
ssss documents?
Answer: A list of the contract documents is contained in General Clauses and
ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss
Conditions. A listing of the Commercial Building contract documents is presented in
ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss
this chapter under the heading“Commercial BuildingPlans.”Theinstructor maywish tohave
ssss ssss ssss ssss ssss s ss s s s s s ss ss
A+ Page 1 ssss
,Created By: A Solution
ssss ssss ssss
the students check over this listing and compare it with the plans provided.
s ss ss ss ssss ssss ssss ssss ssss ssss ssss ssss ssss
2. Therequirement fortemporary light and power at thejob site will befound in what
s ss s ssss ss ss ss ssss s ss ss ss s ss sss
ssss portion of a commercial building’s specification?
ssss ssss ssss ssss ssss
Answer: The Supplementary General Conditions specifies the job site requirements for
ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss
ssss temporarylight and power. In some contracts, this electrical system becomes the responsibility
ss ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss
of the general contractor; in other contracts, it is the electrical contractor’s responsibility
ss ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss
ssss to install and maintain the temporaryelectrical system. The instructor may wish to refer the
ssss ssss ssss ssss ssss s ssss ssss ss ssss ssss ssss ssss ssss
ssssstudent to NEC Article 590 and discuss the requirements in detail.
ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss
A+ Page 2 ssss
,Created By: A Solution
ssss ssss ssss
3. The electrician uses the Schedule of Working Drawings for what purpose?
ss ssss ssss ssss ssss ssss ssss ssss ssss ssss
Answer: The electrician uses the Schedule of Working Drawings to determine whether all
ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss
ssss of the drawings are at hand. The information on “the other sheets” may be very
ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss
important, especially in coordinating with other contractors.
ssss ssss ssss ssss ssss ssss ssss
4. Complete the following items by indicating the letter(s) designating the correct
ssss ssss ssss ssss ssss ssss ssss ssss ssss ssss
ssss source(s) of information: ssss ssss
No. Answer Item Information
4. Sections Ceiling height ssss Sections, Sheet A6 ssss ssss
5. Electrical Electricalreceptacle s Electrical symbol schedule, ssss ssss
ssss symbol style
ssss ssss Chapter 2, Figure 2–6 ssss ssss ssss
ssss schedul
e
6. Electrical Electrical Electrical layout drawings, Sheets ssss ssss ssss
ssss layout outlet
ssss ssss El,E2, and E3 ssss ssss
ssss drawin location
ssss
g s ssss
7. Elevations Exterior wall finishes ss ss Elevations, Sheets A4 and A5 ssss ssss ssss ssss
8. Site plan ssss Grading elevations ssss Site plan, Sheet A4 ssss ssss ssss
9. Electrical g sssss
ssss layout
ssss drawin
A+ Page 3 ssss
, Created By: A Solution
ssss ssss ssss
Panelboard schedules
ssss Electrical layout drawings, Sheet E4
ssss ssss ss ssss
10. Architectural Room width
ssss Architectural floor plan, Sheets ssss ssss ssss
ssss floor plan
ssss Al, A2,and A3
ssss ssss ssss
11. Architectural Swing of door
ssss ssss Architectural floor plan, Sheets Al,
ssss ssss ssss ssss
ssss floor plan
ssss
A2,and A3 ssss
12. Sections Viewfof finterior f wall Sections,fSheetfA6
ssss ss ss ssss s
A+ Page 4 ssss