A slab directly supported by a column without beams, dropped panels, or capitals is
referred to as - Answers - Flat plate

One of the following statements is not correct about the construction procedures of the
cast-in-place concrete framing system. - Answers - The beams and the slab on the
same floor are usually cast at different times.

One of the following is not a cast-in-place concrete element. - Answers - Precast
concrete column

Which statement is not correct about precast concrete wall panels?
a. Solid panels are typically from 4 to 10 in. thick.
b.Most panels are designed with an 8 ft width
c.The panels can be pre-stressed, reinforced, load-bearing or non-load-bearing, or
hollow or solid.
d.Panels can be cast with a haunch to support floors.
e.None - Answers - none

Select all possible connections used in connecting precast concrete elements.
a.Bolting
b.Welding
c.Nailing
d.Doweling
e.Pre-tensioning
f.Post-tensioning - Answers - a.Bolting
b.Welding
d.Doweling
f.Post-tensioning

A method where the dry grout material has only enough water added to produce a stiff
granular mix, which is packed into an opening. - Answers - Drypack

Masonry structures are made up of the following materials except
a.Stone
b.Structural tile
c.CMU
d.Timber
e.Brick - Answers - Timber

One of the statements is true about masonry structures.
a.Load-bearing walls are not capable of supporting floor loads.
b.Veneer is a load-bearing wall.
c.Composite walls can be constructed using two wythes of different masonry units.

, d.Stud is part of masonry wall construction. - Answers - Composite walls can be
constructed using two wythes of different masonry units.

Which statements are true about masonry unit position?
a. Wythe is a continuous vertical wall of one unit in thickness.
b. Stretcher refers to a unit positioned with its bottom side bedded in mortar and its face
in the plane of the wall.
c. Header refers to a unit positioned with its bottom bedded in mortar and its end placed
in the plane of the wall.
d. Soldier refers to a unit positioned with its end bedded in mortar and its face placed
vertically in the plane of the wall
e. Rowlock refers to a unit positioned with its end in the face of the wall and its back
side bedded in mortar
f.All are true
g.a & c - Answers - All are true

One of the following statements is not in the construction procedures of brick or CMU.
a. Blocks without mortar are spaced along a footing to establish spacing and determine
if blocks need cutting.
b.A chalk line is run the length of the wall to establish the level height of the first course
c. The height of the courses is checked with a story pole.
d.Begins laying the units at the center and proceed towards the corner on each side.
e.Begins laying a full mortar bed on the footing and building up each corner to several
courses high. - Answers - Begins laying the units at the center and proceed towards
the corner on each side.

The element used to bridge over small openings such as windows or doors is referred
to as
a.Lintel
b.Beam
c.Pilaster
d.Shelf - Answers - Lintel

Which of the following statements is true about masonry wall joints?
a. Bond breakers of asphalt felt or pre-formed rubber gaskets between units are used to
make Joints
b. Joints are generally located where there are changes in wall height or wall thickness
and at openings, wall intersections, building corners, and junctions between walls and
columns
c. Horizontal joints are placed above masonry walls that butt structural frames or on the
bottom of floor or roof structures.
d.Vertical joints are built into the wall as units are laid
e.All are true - Answers - All are true

Which statement is true about precast concrete?
a.The elements are fabricated by skilled workers under well controlled environment.

Document information

Uploaded on
July 20, 2025
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(360)
Sold
2133
Followers
1447
Items
58259
Last sold
1 week ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions