2025/2026 COMPLETE QUESTIONS WITH
CORRECT DETAILED SOLUTIONS
||ALREADY GRADED!!! 100%
GUARANTEED PASS <BRAND NEW
VERSION>
1. A storm that produces ½ inch or more of precipitation, with a 48
hour or greater period between rain events is a/an...
a. Qualifying rain event
b. Extended storm event
c. Inactive storm event
d. Unsafe monitoring event - ANSWER ✓ A
2. Upload photos to SMARTS that are taken during daily inspections
of the LUP site before, during, and after every ___ storm event
a. First
b. Second
c. Third
d. Fourth - ANSWER ✓ C
3. Which statement is false? Monitoring is not required when:
a. the site/sampling locations are unsafe to access due to the
storm event
b. it is outside of scheduled site operation hours
c. the contractor elects not to work and the site is "shut down"
for a rainy day - ANSWER ✓ C
4. What is the Numeric Action Level (NAL) for pH?
a. 3.5-5.5
, b. 6.0-9.0
c. 6.5-8.5
d. 9.0-12.0 - ANSWER ✓ C
5. What is the exceedance trigger for Receiving Water Monitoring?
a. 100 NTU
b. 250 NTU
c. 500 NTU
d. 1,000 NTU - ANSWER ✓ C
6. What system that uses chemical coagulation, chemical
flocculation, or electro-coagulation to reduce turbidity?
a. ATS
b. CGP
c. CWA
d. NAL - ANSWER ✓ A
7. If the R Factor is ____, you can apply for the Erosivity Waiver.
a. 1
b. Less than 1
c. 5
d. Less than 5 - ANSWER ✓ D
8. The R factor accounts for:
a. Project location, length of construction period, and time of
year
b. Project schedule
c. Historical rain events
d. Potential pollutants on site - ANSWER ✓ A
9. Which risk level must electronically submit all storm event
sampling results to State Water Board no later than 5 days after the
conclusion of the storm event?
a. Risk Level 1