Antwoorden
New working
- Vak
- Instelling
Question 1: On slide 23 of the PowerPoint assigned Session 2 and 3, there is a list of risk analysis tools and techniques (see a) Drawing from the worldwide standards PMBOK Guide scale, Figure 11-1 (PMI, 2013, p.318), how could risks to scope be rated by “impact” to the project using quantit...
[Meer zien]