Questions and Answers
1. What are the powers and duties of the Board as stated in Section 4 (p) of Article II of RA 7920? -
ANSWER To adopt an official seal, prosecute violators of the Act, supervise and regulate the
practice of electrical engineering, and issue subpoenas for investigations.
2. What does 'computed load' refer to in Section 2 (h) Article I of RA 7920? - ANSWER It refers to
the installed capacity of an alternating current electric plant or supply equipment, or the
connected load of industrial plants/commercial buildings.
3. What is required for an electrical engineer to maintain a good reputation? - ANSWER They must
uphold high moral values and avoid convictions involving moral turpitude.
4. What are the powers and duties of the Board as stated in Section 4 (p) of Article II of RA 7920? -
ANSWER To adopt an official seal, prosecute violators of the Act, supervise and regulate the
practice of electrical engineering, and issue subpoenas for investigations.
5. What is the importance of having a degree from an accredited institution for electrical
engineers? - ANSWER It ensures that the engineer has received recognized and quality
education necessary for professional practice.
6. In Article I of RA 7920, what does 'kVA' refer to? - ANSWER The installed capacity of an
alternating current (AC) electric plant supply equipment, or the connected load of industrial
plants, commercial establishments, institutional buildings expressed in kilovolt-amperes.
7. What are the qualifications for Registered Master Electricians according to Section 18 (4) of
Article III? - ANSWER 1. Graduated from a 2-year electrician course with 2 years of practice. 2.
Completed a 3-year BSEE program with 1 year of practice. 3. Completed high school with 5 years
of practice. 4. Completed a 1-year course with 3 years of practice.
, 8. What qualifications are required for Registered Master Electricians according to Section 18 (3) of
Article III? - ANSWER Graduation from a 2-year electrician course with at least 2 years of
electrical practice, or completion of a 3-year BSEE program with 1 year of practice, or a high
school education with 5 years of practice, or a 1-year electrician course with 3 years of practice.
9. What does Rule 5 of RA 7920 state about the official action of the Board? - ANSWER It shall be
valid, enforceable, and effective only after it has been approved by the Commission and
published in the Official Gazette or a newspaper of general circulation.
10. Who appoints the members of the Board of Electrical Engineering in the Philippines? - ANSWER
The President of the Philippines, the Professional Regulations Commission, and the Institute of
Integrated Electrical Engineers of the Philippines.
11. What is NOT a qualification for BEE board members? - ANSWER Being at least 36 years of age.
12. How many years must an RME wait after the revocation of their Certificate of Registration
before it can be reissued? - ANSWER After 2 years from the surrender.
13. Who is the executive officer of the Board of Electrical Engineering? - ANSWER The President of
the Philippines.
14. What does R.A. No. 7920 define as the installed capacity of an alternating current electric plant?
- ANSWER The connected load of industrial plants, commercial establishments, and institutional
buildings expressed in kilovolt-amperes (kVA).
15. What qualifications must an RME have to install electrical systems in excess of 500 kVA? -
ANSWER Must hold a BSEE degree, be under the supervision of a PEE or REE, and have more
than 5 years of electrical installation experience.
16. What is one of the powers and duties of the Board of Electrical Engineering as per Section 4 (r)?
- ANSWER Promulgate rules and regulations including code of ethics and administrative policies.