___________________ is a key document that will be used for cost estimates, time estimates, risk identification, and resource assignment correct answer Work Breakdown Structure (WBS) ______________is an amount added to the overall project budget to cover unknown risks. correct answer management reserve Correct! A management reserve is an amount added to the overall project budget to cover unknown risks A ______________________________ is a characteristic, function, or capability that must be present in the project final outcome. project scope statement project requirement project deliverable correct answer Correct! A project requirement is a characteristic, function, or capability that must be present in the project final outcome. A ___________is a characteristic, function, or capability that must be present in the project final outcome. correct answer A project requirement

Meer zien Lees minder
Instelling
Project Managememt
Vak
Project Managememt











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Project Managememt
Vak
Project Managememt

Documentinformatie

Geüpload op
2 juli 2025
Aantal pagina's
41
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

Project Management - C722 (UNIT
6) Questions with Accurate
Answers
___________________ is a key document that will be used for cost
estimates, time estimates, risk identification, and resource assignment
correct answer Work Breakdown Structure (WBS)


______________is an amount added to the overall project budget to
cover unknown risks. correct answer management reserve


Correct! A management reserve is an amount added to the overall
project budget to cover unknown risks


A ______________________________ is a characteristic, function, or
capability that must be present in the project final outcome.


project scope statement
project requirement
project deliverable correct answer Correct! A project requirement is a
characteristic, function, or capability that must be present in the
project final outcome.

,A ___________is a characteristic, function, or capability that must be
present in the project final outcome. correct answer A project
requirement


A successful project begins with what? correct answer a clear
understanding between the customer, or sponsor, and the project team
regarding what the project will accomplish


Analyzing risks is part of risk control or assessment? correct answer
Correct! Analyzing risks is part of risk assessment.


As a project manager, when you come to a cliff and decide to mitigate
the risk, you ________.


use a parachute or a hang glider for a soft landing.
take all the responsibility and jump off the cliff yourself.
walk away from the cliff.
let someone on your team jump off the cliff. correct answer use a
parachute or a hang glider for a soft landing.


Correct! When you mitigate a problem, you want to help the team
survive the risk by deferring or reducing the impact.

,As a project manager, which strategy for responding to risks should be
your first consideration, keeping in mind it is usually also the most
expensive?




Mitigate the problem.
Avoid risk.
Transfer the responsibility.
Accept risk. correct answer Avoid the Risk


Correct! Avoiding risk in the first place should be your first choice if you
can afford it.


Creating the project scope statement is a(n) __________________
between the project team and the customer


informal agreement
iterative process
linear process correct answer iterative process


Correct! Creating the project scope statement is an iterative process
between the project team and the customer.

, During detailed planning, situations may be identified that require that
the project scope statement be modified.


True or False correct answer True


Correct! During detailed planning, situations may be identified which
require that the project scope statement be modified. However, at the
conclusion of the planning phase, the project scope statement and
project plan are approved and will not be changed without the
agreement of both the customer and the project manager.


During which phase does scope verification occur?




Planning
Closing
Defining
Executing correct answer Closing


Correct! Scope verification occurs in the closing phase.


Examples of objectives that the WBS is used to achieve include
organizing a project's resources, showing milestones for communicating
progress, and ______________

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
starwid Yale University
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
13
Lid sinds
6 maanden
Aantal volgers
1
Documenten
8058
Laatst verkocht
4 dagen geleden

3.3

4 beoordelingen

5
1
4
0
3
2
2
1
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen