Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

NERC PRACTICE QUESTIONS AND ANSWERS LATEST UPDATED 2025

Rating
-
Sold
-
Pages
140
Grade
A
Uploaded on
29-06-2025
Written in
2024/2025

Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. Combustion turbine generators C. Geothermal generators D. Hydroelectric generators - ANSWERC. Geothermal generators If a reliability coordinator identifies that there is a potential transmission related problem in the area, who should they notify? A. Marketers in the area B. Other reliability coordinators in the interconnection C. All purchasing selling entities D. Generation operators in the area of the potential problem - ANSWERB. Other reliability coordinators in the interconnection Restoration services on critical telecommunications channels should be available _____. A. 24 hours per day B. Within 12 hours of a telecommunication channel failure C. By the end of the next business day D. Within 72 hours of the contingency occurring - ANSWERA. 24 hours per day

Show more Read less
Institution
NERC
Course
NERC

Content preview

NERC PRACTICE QUESTIONS AND
ANSWERS LATEST UPDATED 2025

,Dry steam plants, flash steam plants, and binary cycle power plants are the three main
types of what kind of generating plant?
A. Nuclear generators
B. Combustion turbine generators
C. Geothermal generators
D. Hydroelectric generators - ANSWERC. Geothermal generators

If a reliability coordinator identifies that there is a potential transmission related problem
in the area, who should they notify?
A. Marketers in the area
B. Other reliability coordinators in the interconnection
C. All purchasing selling entities
D. Generation operators in the area of the potential problem - ANSWERB. Other
reliability coordinators in the interconnection

Restoration services on critical telecommunications channels should be available
_____.
A. 24 hours per day
B. Within 12 hours of a telecommunication channel failure
C. By the end of the next business day
D. Within 72 hours of the contingency occurring - ANSWERA. 24 hours per day

According to NERC, A balancing authority may elect to fulfill its contingency reserve
obligations by participating as a member of a _____
A. ISO
B. Reserve sharing group
C. RTO
D. Regional reliability organization - ANSWERB. Reserve sharing group

If you were to experience the northern lights what would be your concern with the
operation of the power system?
A. System harmonics causing oscillations
B. A reduction of MVAR consumption
C. Generator output reduction
D. Transformer overheating - ANSWERD. Transformer overheating

Your BA has a net scheduled interchange of 650 MW and your actual interchange is
800 MW. The frequency bias setting for your BA is 65 MW/0.1 Hz. There is a
disturbance on the system and the actual frequency is 60.02 Hz. What is your ACE?
A. -163 MW
B. -137 MW
C. 137 MW

,D. 163 MW - ANSWERD. 163 MW

Generators have the ability to be used as voltage control devices. If a generator raises
its VAR output the system operator should expect the system voltage to
A. Decrease
B. Increase
C. Not change
D. Collapse - ANSWERB. Increase

if a BA has 500 MW of spinning reserves and of that 300 are regulating reserves, by
definition, NERC requires the regulating reserves must be ____?
A. Online and AGC responsive
B. Able to ramp to full load within 10 minutes
C. Able to be online within 10 minutes
D. Able to be online within 5 minutes - ANSWERA. Online and AGC responsive

There is a shunt capacitor on your system that has a rating of 50 MVAR @ 138 KV. The
voltage at the time of switching the capacitor in service is 124 KV. What would be the
expected output of the capacitor?
A. 45 MVAR
B. 43.5 MVAR
C. 50 MVAR
D. 40.5 MVAR - ANSWERD. 40.5 MVAR

Which mode of AGC operation is the one that NERC states will be used unless such
operation is adverse to the system or interconnection Reliability?
A. Constant interchange
B. Tie-line Bias
C. Constant frequency
D. Load-frequency bias - ANSWERB. Tie-line Bias

You have a 600 MW unit that is currently loaded at 300 MW and frequency drops .2 Hz.
What will the new output of the generator be as a result of the drop in frequency due to
droop characteristic?
A. 300 MW
B. 340 MW
C. 260 MW
D. 380 MW - ANSWERB. 340 MW

If a BA is unable to calculate its ACE for more than ____ it shall notify its RC.
A. 15 minutes
B. 60 minutes
C. 30 minutes
D. 20 minutes - ANSWERC. 30 minutes

, The system frequency is currently 60.03 Hz. The Synchronized generating capacity is
3200 MW. The system load is currently 2200 MW. What is the maximum amount of load
block that should be restored?
A. 160 MW
B. 220 MW
C. 110 MW
D. 320 MW - ANSWERA. 160 MW

A balancing authority has a bias setting of -150 MW. The frequency falls .05 Hz due to
an external disturbance. How many MW would you expect this balancing authority area
to provide to the disturbance?
A. +150 MW
B. +75 MW
C. -150 MW
D. -75 MW - ANSWERB. +75 MW

When a RC must curtail or hold an interchange transaction to respect transmission
service reservation priorities or to mitigate potential or actual SOL violation, the RC shall
inform the _____ listed on the interchange transaction tag of the greatest reliable level
at which the affected interchange transaction may flow.
A. Transmission service provider
B. Transmission operator
C. Source balancing authority
D. Sink balancing authority - ANSWERD. Sink balancing authority

Each generator operator shall provide generator outage information daily for scheduled
generator outages planned for the next day. Why is this important?
A. So the RC & TOP can do their studies
B. So marketing knows how much gas to buy
C. So the BA knows how much power to buy
D. So the plant can determine staffing requirements - ANSWERA. So the RC & TOP
can do their studies

You are a TOP and you have changed relay settings for your UVLS scheme in the
northern part of your system. Your neighbor just to the north of you has a major
generating facility rated @ 1000 MW and they supply most of the MVAR for the area.
They also monitor the MVAR flows on most of the lines in the area due to an NRC
requirement regarding MVAR for a nuclear plant. Of the parties listed below, who does
not need to be notified of the changes made to the relay settings
A. Transmission service providers
B. Balancing authorities
C. Transmission operators
D. Generation operators - ANSWERA. Transmission service providers

Areas of North America with igneous rock formations would be subject to which of the
following due to the igneous rock formations?

Written for

Institution
NERC
Course
NERC

Document information

Uploaded on
June 29, 2025
Number of pages
140
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$28.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Thumbnail
Package deal
NERC CERTIFICATION PRACTICE EXAM BUNDLE 2025/2026
-
9 2025
$ 41.65 More info

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
papersmaster01 Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
301
Member since
2 year
Number of followers
106
Documents
14704
Last sold
1 month ago
PAPERSMASTER01

On this page you will find documents , package deals, flashcards offered by seller PAPERSMASTER01.With our documents on your side you"ll be well equipped to tackle you exams and achieve the grades you need.

3.9

73 reviews

5
22
4
34
3
10
2
3
1
4

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions