Most emergency work orders should be written by production/operations. (T/F) True
It should be common practice for operators to perform PMs. (T/F) True
The P-F interval can be applied to visual inspections. (T/F) True
The best method of measuring the reliability of an asset is by counting downtime events. (T/F)
True
The primary purpose of scheduling is to coordinate maintenance jobs for greatest utilization of
maintenance resources. (T/F) True
What percentage of your assets should be ranked critical based on the risk to business? Less
than 20%
Vibration monitoring can detect uniform impeller wear. (T/F) False
Understanding the known and likely causes of failures can help design a maintenance strategy
for an asset to prevent or predict failure. (T/F) True
Reliability can be improved easily after a maintenance plan has been put into operation. (T/F)
False
What percentage of maintenance work should be proactive? 85% or more
MTBF is measured by operating time divided by the number of failures of an asset. (T/F)
True
,Maintenance cost will decrease as reliability increases. (T/F) True
The "F" on the P-F interval indicates that equipment is still functioning. (T/F) False
A rule of thumb is that, on average, an experienced planner can plan work for how many craft
people? 15
Which of the following is not a primary objective for implementing a planning process?
Mesh the production schedule and the maintenance schedule.
The best method of measuring the reliability of an asset is by? MTBF
With the exception of emergency work orders, planning and scheduling will benefit all
maintenance work. (T/F) True
Leading KPIs predict results. (T/F) True
The 6th S in 6S (also called 5S plus) stands for safety. (T/F) True
RCM stands for: Reliability Centered Maintenance
The objective of RCM is to preserve functions. (T/F) True
An MRO storeroom shouldn't be stocking parts for emergencies. (T/F) False
The inventory turnover ratio for MRO store should be: Less than 2
, PM compliance is a ________ KPI. Lagging and Leading
Quality is one key component of OEE. (T/F) True
Reliability and Maintainability can only be designed in. (T/F) True
Creating a reliability culture from a reactive mode can be accomplished in a short period of time
if enough resources are made available. (T/F) False
Karl Fischer's Coulometric Titration Method is an effective technique to determine the metallic
content (in PPM) in an oil sample. (T/F) False
An IR thermography window is an effective method to satisfy NFPA 70E arc flash requirements.
(T/F) True
FMEA is applicable only to assets currently in use. (T/F) False
RCM Methodology can't be used effectively on new systems being designed. (t/F) False
Properly training the M&R workforce can increase asset and plant availability. (T/F) True
TPM is a type of maintenance performed by the operators. (T/F) True
Lagging KPIs are the results of a process. (T/F) True
EOQ improves the inventory turn ratio. (T/F) False