Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 2 van de 14 pagina's
Tentamen (uitwerkingen)

PJM EXAM QUESTIONS WITH COMPLETE SOLUTIONS

Document preview thumbnail
Voorbeeld 2 van de 14 pagina's

PJM EXAM QUESTIONS WITH COMPLETE SOLUTIONSDuring reactive testing, which entity must give approval to change an approved voltage schedule? PJM, TOP, MOC, GO - ANSWER-TO Generation available within 10 minutes for offline reserve units: Quick-start (hydro), manual, operating, supplemental - ANSWER-Quick-start (hydro) Minimum MVARs for an individual generator that is required to do reactive testing? - ANSWER-20 MVA Minimum MVARs for an aggregate of generators that is required to do reactive testing? - ANSWER-75 MVA Power transformer is connected to the generator with which line? - ANSWER-Primary In a balancing authority region, If a site trips offline, what increases? - ANSWER-positive time error How many hours before NERCs 24hour deadline ends must you report disturbance to PJM? - ANSWER-6 hrs How does PJM avoid dealing with economic issues during transmission related constraints - ANSWERcost (offer) capping generation If a generator doesn't have ICCP, what does it have to be linked through so data is available? - ANSWERSCADA (through EMS) Which balancing control mode is used by PJM under normal operations? - ANSWER-Tie line bias Page 2 of 14 the purpose for balancing area to have AR (area regulator) is to correct for: - ANSWER-small deviations in load what esuite tool is used to maintain individual generator regulation data that is submitted by PJM members? - ANSWER-eMarket cold weather alert is for what temp? - ANSWER-10F what are the three types of transmission constraint that PJM monitors? - ANSWER-Reactive, Stability, Thermal (transfer limits) which would be the last step PJM would take in attempting to relieve a transmission constraint? - ANSWER-shed load Load in PJM is generally served using ___ transmission service. - ANSWER-Network Integration If you were going to import, export, or wheel power through PJM, you would use ____ transmission services? - ANSWER-point-to-point? what is an example of a quick start reserve? - ANSWER-Hydroelectric In order to lower system voltage, ___ must decrease to decrease _____ - ANSWER-MW, MVAR what is PJM's reg requirement during a system restoration? - ANSWER-2% of current load During restoration conditions, what amount of load must be shed in order to increase frequency by 1.0Hz - ANSWER-6-10% During restoration conditions, what percentage of load must be shed in order to alter frequency by 1% Hz? - ANSWER-1-2% of load to alter frequency by 1% Page 3 of 14 What is the approx. MVAR per mile of 500kV transmission that should be anticipated? - ANSWER-1.70 MVAR per mile Frequency during restoration process should be: - ANSWER-59.75-61Hz A system will blackout at what frequency? - ANSWER-57.5 Hz or lower What is the criteria for PJM to issue a Min Gen Alert? - ANSWER-Within 2500 MW of normal eco min limits Based on a generator capability curve, in order to maximize the MVAR output of the generator, it may be necessary to: - ANSWER-decrease MW output It would be an acceptable action for PJM to request of a generator during periods of heavy flows (load) and low voltages to lower real-time power output to ... - ANSWER-increase reactive power lowering the generator's current and increasing the voltage will also increase: - ANSWER-MVARs (reactive power)

Voorbeeld van de inhoud

PJM EXAM QUESTIONS WITH
COMPLETE SOLUTIONS
During reactive testing, which entity must give approval to change an approved voltage schedule?

PJM, TOP, MOC, GO - ANSWER-TO



Generation available within 10 minutes for offline reserve units:

Quick-start (hydro), manual, operating, supplemental - ANSWER-Quick-start (hydro)



Minimum MVARs for an individual generator that is required to do reactive testing? - ANSWER-20 MVA



Minimum MVARs for an aggregate of generators that is required to do reactive testing? - ANSWER-75
MVA



Power transformer is connected to the generator with which line? - ANSWER-Primary



In a balancing authority region, If a site trips offline, what increases? - ANSWER-positive time error



How many hours before NERCs 24hour deadline ends must you report disturbance to PJM? - ANSWER-6
hrs



How does PJM avoid dealing with economic issues during transmission related constraints - ANSWER-
cost (offer) capping generation



If a generator doesn't have ICCP, what does it have to be linked through so data is available? - ANSWER-
SCADA (through EMS)



Which balancing control mode is used by PJM under normal operations? - ANSWER-Tie line bias




Page 1 of 14

, the purpose for balancing area to have AR (area regulator) is to correct for: - ANSWER-small deviations
in load



what esuite tool is used to maintain individual generator regulation data that is submitted by PJM
members? - ANSWER-eMarket



cold weather alert is for what temp? - ANSWER-10F



what are the three types of transmission constraint that PJM monitors? - ANSWER-Reactive, Stability,
Thermal (transfer limits)



which would be the last step PJM would take in attempting to relieve a transmission constraint? -
ANSWER-shed load



Load in PJM is generally served using ___ transmission service. - ANSWER-Network Integration



If you were going to import, export, or wheel power through PJM, you would use ____ transmission
services? - ANSWER-point-to-point?



what is an example of a quick start reserve? - ANSWER-Hydroelectric



In order to lower system voltage, ___ must decrease to decrease _____ - ANSWER-MW, MVAR



what is PJM's reg requirement during a system restoration? - ANSWER-2% of current load



During restoration conditions, what amount of load must be shed in order to increase frequency by
1.0Hz - ANSWER-6-10%



During restoration conditions, what percentage of load must be shed in order to alter frequency by 1%
Hz? - ANSWER-1-2% of load to alter frequency by 1%




Page 2 of 14

Documentinformatie

Geüpload op
24 juni 2025
Aantal pagina's
14
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
$19.79

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kan je een ander document kiezen. Je kan het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Onlystudents
3.9
(19)
Verkocht
111
Volgers
86
Items
1356
Laatst verkocht
2 maanden geleden


Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen