During reactive testing, which entity must give approval to change an approved voltage schedule?
PJM, TOP, MOC, GO - ANSWER-TO
Generation available within 10 minutes for offline reserve units:
Quick-start (hydro), manual, operating, supplemental - ANSWER-Quick-start (hydro)
Minimum MVARs for an individual generator that is required to do reactive testing? - ANSWER-20 MVA
Minimum MVARs for an aggregate of generators that is required to do reactive testing? - ANSWER-75
MVA
Power transformer is connected to the generator with which line? - ANSWER-Primary
In a balancing authority region, If a site trips offline, what increases? - ANSWER-positive time error
How many hours before NERCs 24hour deadline ends must you report disturbance to PJM? - ANSWER-6
hrs
How does PJM avoid dealing with economic issues during transmission related constraints - ANSWER-
cost (offer) capping generation
If a generator doesn't have ICCP, what does it have to be linked through so data is available? - ANSWER-
SCADA (through EMS)
Which balancing control mode is used by PJM under normal operations? - ANSWER-Tie line bias
Page 1 of 14
, the purpose for balancing area to have AR (area regulator) is to correct for: - ANSWER-small deviations
in load
what esuite tool is used to maintain individual generator regulation data that is submitted by PJM
members? - ANSWER-eMarket
cold weather alert is for what temp? - ANSWER-10F
what are the three types of transmission constraint that PJM monitors? - ANSWER-Reactive, Stability,
Thermal (transfer limits)
which would be the last step PJM would take in attempting to relieve a transmission constraint? -
ANSWER-shed load
Load in PJM is generally served using ___ transmission service. - ANSWER-Network Integration
If you were going to import, export, or wheel power through PJM, you would use ____ transmission
services? - ANSWER-point-to-point?
what is an example of a quick start reserve? - ANSWER-Hydroelectric
In order to lower system voltage, ___ must decrease to decrease _____ - ANSWER-MW, MVAR
what is PJM's reg requirement during a system restoration? - ANSWER-2% of current load
During restoration conditions, what amount of load must be shed in order to increase frequency by
1.0Hz - ANSWER-6-10%
During restoration conditions, what percentage of load must be shed in order to alter frequency by 1%
Hz? - ANSWER-1-2% of load to alter frequency by 1%