Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

NERC EXAM QUESTIONS with complete solutions 2025

Document preview thumbnail
Preview 2 out of 13 pages

NERC EXAM QUESTIONS with complete solutions 2025A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS - ANS-b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? a) A net under-generation in Balancing Area A b) A net under-generation in the Interconnection c) A loss of load in Balancing Area A d) A loss of load in the Interconnection - ANS-b) A net under-generation in the Interconnection What is the penalty for a Balancing Authority violating the Disturbance Control Standard? a) Must carry additional Contingency Reserve b) Must develop a correction action plan c) Must re-evaluate and change its Frequency Bias Setting d) Must increase its Regulating Reserve - ANS-a) Must carry additional Contingency Reserve Your ACE is a large negative value and system frequency is 59.80 Hz. Your AGC system is pulsing your units down. What should you do? a) Place AGC in flat frequency control b) Place AGC in flat tie line control c) Suspend AGC and investigate d) Do nothing as this is normal - ANS-c) Suspend AGC and investigate When two identical generating units are operated in parallel on governor Page 2 of 13 control, and on machine has a 5% droop and the other has a 10% droop, the unit with the greater (10%) governor droop will: Page 3 of 13 a) Respond less to frequency deviations b) Respond more to frequency deviations c) Respond the same to frequency deviations d) Not adjust for frequency changes - ANS-a) Respond less to frequency deviations On a radial transmission system a generator has a capacity of 600 MWs. The Droop characteristic is at 5% and the generator is currently loaded at 300 MWs. If frequency suddenly drops to 59.3 Hz, what would be the total generator output? a) 350 b) 400 c) 440 d) 600 - ANS-c) 440 What is the main purpose of the Frequency Bias Setting in the ACE equation? a) Control frequency to 60 Hz for the entire Interconnection b) Assist with arresting frequency deviations c) Restore frequency to 60 Hz after a disturbance d) maintains frequency between 59.95 and 60.05 Hz - ANS-b) Assist with arresting frequency deviations A Balancing Authority has a Frequency Bias Setting of -200 MW/.1Hz. What is the Balancing Authority's Frequency Response for a frequency of 59.95 Hz? a) 10 MWs b) 50 MWs c) 100 MWs d) 200 MWs - ANS-c) 100 MWs Scheduled Interchange is 250 MWs and Actual Interchange is 285 MWs. The Bias Setting is 35 MW/.1Hz and frequency is 60.00 Hz with no time error correction in effect. Frequency suddenly drops to 59.80 Hz. What does ACE indicate after the disturbance? a) 70 MW under-generating b) 70 MW over-generating c) 35 MW under-generating d) 35 MW over-generating - ANS-d) 35 MW over-generating Inadvertent energy accumulation occurs due to a difference in Net Actual Interchange and Net Interchange Schedule over time. This energy accumulation can be paid back unilaterally by adjusting delivery of power: Page 4 of 13 a) During off-peak periods b) During periods corresponding to those in which the inadvertent energy was accumulated

Content preview

NERC EXAM QUESTIONS with complete
solutions 2025



A Balancing Authority notices that Operating Reserve has steadily declined
throughout the hour. What is the most likely cause?

a) Loss of a large generator in the area
b) An inaccurate load forecast
c) Loss of a major transmission line
d) A malfunction of EMS - ANS✓✓-b) An inaccurate load forecast

Balancing Area A notices that the Interconnection frequency is 59.94 Hz and
their ACE is 0. Which of the following could be the cause of this reading?

a) A net under-generation in Balancing Area A
b) A net under-generation in the Interconnection
c) A loss of load in Balancing Area A
d) A loss of load in the Interconnection - ANS✓✓-b) A net under-generation in
the Interconnection

What is the penalty for a Balancing Authority violating the Disturbance Control
Standard?

a) Must carry additional Contingency Reserve
b) Must develop a correction action plan
c) Must re-evaluate and change its Frequency Bias Setting
d) Must increase its Regulating Reserve - ANS✓✓-a) Must carry additional
Contingency Reserve

Your ACE is a large negative value and system frequency is 59.80 Hz. Your
AGC system is pulsing your units down. What should you do?

a) Place AGC in flat frequency control
b) Place AGC in flat tie line control
c) Suspend AGC and investigate
d) Do nothing as this is normal - ANS✓✓-c) Suspend AGC and investigate

When two identical generating units are operated in parallel on governor
Page 1 of 13

, control, and on machine has a 5% droop and the other has a 10% droop, the
unit with the greater (10%) governor droop will:




Page 2 of 13

Document information

Uploaded on
June 24, 2025
Number of pages
13
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$18.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Onlystudents
3.9
(19)
Sold
111
Followers
86
Items
1355
Last sold
2 months ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions