100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Asphalt Paving GC Exam UPDATED ACTUAL Exam Questions and CORRECT Answers

Rating
-
Sold
-
Pages
20
Grade
A+
Uploaded on
24-06-2025
Written in
2024/2025

Asphalt Paving GC Exam UPDATED ACTUAL Exam Questions and CORRECT AnswersAsphalt Paving GC Exam UPDATED ACTUAL Exam Questions and CORRECT Answers

Institution
Asphalt
Course
Asphalt










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Asphalt
Course
Asphalt

Document information

Uploaded on
June 24, 2025
Number of pages
20
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Asphalt Paving GC Exam UPDATED ACTUAL Exam Questions
and CORRECT Answers


Ensure finished surface of base varies neither than 3/8" from a straight edge 10' long when
applied parallel to the CL of the rd, no more than ______ inch from the typical cross-section on
the plans - 1/2"


Thickness of completed modified base is measured at staggered intervals not to exceed _____
feet in length for two-lane roads - 250'



Use _______ in all base courses as an anti-stripping additive - hydrated lime



Where plans required uniform thickness of base course and the contract provides for pavement
on sq yd bases, thickness of base course is determined from measurements taken of the
completed base course at intervals not exceeding _____ feet for two-lane roads - 500'



For HMA, use aggregates with a combined specific gravity of _____ or less - 2.90



ON HMA use pneumo-rollers that are self propelled and have an effective rolling width of not
less than _______ - 60"


Ensure intermediate rolling of HMA is completed before mat temp drops below _____ - 175
degrees



First step in applying asphalt surface treatment (single) - Clean surface


Last step in applying asphalt surface treatment (single) - Remove excess aggregate


Spread aggregate for HMA within _____ feet of the application of the emulsion - 200'

,Place asphalt surface treatment (double) within ____ days of the base course being primed - 7



When rolling aggregate applications for asphalt surface treatment (double) on each trip of the
roller, overlap prior by _____ the width of the roller - 1/2



On portland cement pavement, position lower surface of preformed joint filler on or below
surface of base while upper surface is _____ inches below surface of the slab - 1/2"


When using surface vibrators on portland concrete, ensure frequency is not less than ______
impulses per minute - 3500


Construct subbase and base beneath concrete pavement to include area _____ inches in width
extending beyond edges to provide stability for paver tracks - 18"


Min. width of any reinforced concrete slab is ______ feet - 16'



Max. length of any reinforced concrete slab is ______ feet - 20'



Exclude all vehicle traffic from newly constructed concrete pavement for a period of not less
than ______ days - 14


Finish joints should not deviate more than ____ inch in the horizontal alignment from a straight
line - 1/4"



Make transverse construction joints whenever placing of concrete is suspended longer than
_____ minutes - 30 minutes


Ensure final sealed surface width of newly constructed longitudinal and transverse contraction
joints is _____ inch - 3/8"

, If calcium is used in non-reinforced concrete during cold weather, do not exceed ______ % - 2%



Water reducer may be used to increase slump of concrete - True


Use procedures for mass concrete placement for a pour that has dimensions of _____ feet or
greater in _____ different directions - 5, 3


In hot weather, do not allow mass concrete mix temperature measured at discharge into the forms
to exceed ______ degrees - 80 degrees



Wet-cure surface of bridge decks for minimum of - 7 days



Wet-cure structural concrete other than bridge decks for period of ____ days and cover with
curing blankets - 4 days



Do not remove forms in less than ______ hours, nor more than 48 hours - 5 hours



Wait a minimum of ____ hours between placing footing or driller pier concrete and erecting
column forms - 12 hours


Wait a minimum of ___ hours between placing footing or drilled pier concrete and placing
column forms - 24 hours


Allow concrete to cure for _____ days before application of final finishing coat - 28 days



When grinding and texturing bridge decks do not allow depth or grinding to exceed ______ inch
- 1/2"
$12.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
GradeVaultAcademy

Also available in package deal

Thumbnail
Package deal
Asphalt Bundled Exam Questions WITH CORRECT Answers
-
15 2025
$ 195.25 More info

Get to know the seller

Seller avatar
GradeVaultAcademy Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
2
Member since
6 months
Number of followers
0
Documents
841
Last sold
4 months ago
GradeVault Academy.

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions