Question: One of these is not an effective way to prepare the walls in
advance of a deep foundation excavation in silty clay soil
Question 1 options:
© 2025 Assignment Expert
A)
Exampromax - Stuvia US
Reinforced and tied-back walls using a diaphragm wall technique
B)
Caisson construction with an auger drill
C)
Using a large hammer to drive sheet piles into the ground
D)
Driving untensioned anchors from surface into the ground and excavating
through them ⼀Answer: D
, 2 Exampromax - Stuvia US 2025/2026
Question: The main failure mode of concern for high retaining walls is
Question 2 options:
A)
Leakage
© 2025 Assignment Expert
B)
Exampromax - Stuvia US
Overturning
C)
Basal Sliding
D)
Foundation punch through ⼀Answer: B
Question: Risks of tunnelling at great depth do not normally include
Question 3 options:
A)
APSC 151 WEEK 11 Questions and Answers
(100% Correct Answers) Already Graded A+
Question: One of these is not an effective way to prepare the walls in
advance of a deep foundation excavation in silty clay soil
Question 1 options:
© 2025 Assignment Expert
A)
Exampromax - Stuvia US
Reinforced and tied-back walls using a diaphragm wall technique
B)
Caisson construction with an auger drill
C)
Using a large hammer to drive sheet piles into the ground
D)
Driving untensioned anchors from surface into the ground and excavating
through them ⼀Answer: D
, 2 Exampromax - Stuvia US 2025/2026
Question: The main failure mode of concern for high retaining walls is
Question 2 options:
A)
Leakage
© 2025 Assignment Expert
B)
Exampromax - Stuvia US
Overturning
C)
Basal Sliding
D)
Foundation punch through ⼀Answer: B
Question: Risks of tunnelling at great depth do not normally include
Question 3 options:
A)