API 570 Pre-course Study Guide Questions and Answers correct API 570 covers inspection, repair, alteration, and re-rating procedures for what type of piping systems? Metallic and fiberglass reinforced plastic piping systems that have been in service Is the use of API 570 limited only to piping systems used in the petroleum and chemical process industries? No Which of the following is an optional fluid service to which API 570 may be applied? Category D fluid services Are all fluid services and classes of piping systems, located within the boundaries of a refinery or chemical plant, subject to the requirements of API 570? No, certain fluid services are optional such as hazardous fluids below the threshold limits, water, steam, condensate, boiler feed water, and Category D fluid services. Which of the following applications is optional for inclusion in API 570? Firewater piping The owner user organization must develop a quality assurance manual or written procedure which shall contain all but which of the following? External auditing requirements for the Quality Control system for pressure relieving devices Who has overall responsibility for compliance with API 570? The owner user of the piping system Who is responsible to the owner for activities involving design, engineering review, rating, analysis, and evaluation of piping systems? The piping engineer The repair organization is responsible for providing materials, equipment, quality control, and workmanship to meet the requirements of ASME B 31.3 False- API 570 not B 31.3 The API 570 inspector is responsible to the owner user for determining that all but which of the following requirements are met? Operation Personnel not designated as inspectors, piping engineers, or repair organizations are responsible for notifying the inspector or piping engineer of any unusual conditions and providing other assistance where appropriate. True In developing an inspection plan, a corrosion specialist should be consulted when piping systems operate at elevated temperatures and for systems that operate below; The ductile to brittle transition temperature The inspection plan shall be developed by: The inspector and or engineer The inspection plan is developed from the analysis of several sources of data. Systems shall be evaluated based on present or possible types of damage mechanisms. The methods and extent of NDE shall be evaluated to assure they can Identify the damage mechanism and the severity of damage Inspection plans shall be reviewed and amended As needed Which of the following is not listed as a minimum content of an inspection plan? The length of time the system will be out of service Identifying the evaluating potential damage mechanisms, current equipment condition, and the effectiveness of past inspections are; Important steps in assessing the probability of piping failure The RBI probability assessment shall be in accordance with: API 580 The consequence of a release is dependent upon: The type and amount of process fluid contained in the equipment Documentation of RBI assessments is essential to clearly define all of the factors contributing to: The probability and consequence of failure When RBI assessments are used to set equipment inspection intervals, the assessment shall be updated After each inspection as defined in API 580 The owner user is preparing a piping system for internal and some external inspections, which of the following is not listed as part of the safety practices? Identifying the remaining piping systems Before starting an inspection what should inspection personnel do? Obtain permission to work in the vicinity from operating personnel You are preparing to conduct an inspection of an in-service piping system. What specific function should you perform? You should familiarize yourself with the previous inspection results Chloride stress corrosion cracking, fatigue, caustic stress corrosion cracking, and sulfide stress cracking are examples of which of the following typical piping damage types and mechanisms? Surface connected cracking Why are injection points of particular concern with regard to inspection activity? Injection points are sometimes subject to accelerated or localized corrosion from normal or abnormal operating conditions What is the recommended minimum upstream limit of an injection point circuit? Twelve inches or three pipe diameters, whichever is greater What is the recommended downstream limit of an injection point circuit? Second change in flow direction past the injection point or 25 feet beyond the first change in flow direction, whichever is less Which of the following is not one of the recommended guidelines used in establishing thickness measurement locations (TMLs) within an injection point circuit? Appropriate locations on the connected vessels When taking thickness measurements, at injection points, what are the preferred methods of obtaining these measurements? Radiography and or ultrasonic Periodically, inspections of an injection point circuit should include more extensive inspection. What are the recommended limits of this extended inspection? Beginning 12 inches upstream of the injection nozzle and continuing for at least ten pipe diameters downstream of the injection point During the external inspection of a piping system, you notice corrosion build up at a pipe support contact point. What action may be necessary? Lifting the pipe off the support may be necessary for thorough inspection Bellows expansion joints should be inspected visually for? Unusual deformations, misalignment, excessive angular rotation, and displacements that may exceed design. During piping and line movement surveillance inspections, branch connections should receive special attention. True Condition Monitoring Locations (CMLs) should be selected based on what two main considerations? The potential for localized corrosion and service specific corrosion May CMLs be reduced or eliminated once they have been established? Yes substantial reductions should include consultation with a corrosion specialist The thinnest reading or an average of several readings in the test point shall be recorded and used to calculate corrosion rates, remaining life, and inspections schedules. True When taking thickness readings on pipe, where should they be taken? Thickness measurements should include each of the four quadrants on the pipe and fittings, with special attention to the inside and outside radius of elbows and tees CMLs should be marked on inspection drawings but not on the piping system. False A complex piping system containing fittings, branches, deadlegs, injection points, and other similar items would cause you to do which of the following? Assign more CMLs Piping systems may require fewer CMLs provided that all but which of the following characteristics are present? Higher potential for CUI CMLs may be eliminated entirely for piping systems when what condition(s) exist? Environmental emergency is extremely low, Non corrosive systems, as demonstrated by history or similar service; and systems not subject to changes that could cause corrosion as demonstrated by history and or periodic reviews What nondestructive method is the most accurate means for obtaining thickness measurements on installed pipe larger than NPS 1? Ultrasonic What technique is preferred for determining areas to be measured for pipe diameters smaller than NPS 1? Radiographic profile When corrosion in a piping system is non uniform or the remaining thickness is approaching retirement thickness, what are the preferred thickness measurements methods to be employed in this case? Radiography or Ultrasonic scanning Ultrasonic measurements taken above_____ °F require the use of instruments, couplants, and procedures that will result in accurate measurements at the higher temperature. 150°F The accuracy of ultrasonic measurements can be influenced by many factors. Which of the following factors should not affect the accuracy of ultrasonic measurements? Thickness between 1/8 and 1/4" Pressure test are not normally conducted as part of a routine inspection. Exceptions to this include: Requirements of the coast guard for over water piping and requirements of local jurisdictions, after welded alterations, buried piping or when specified by the inspector or piping engineer. If a pressure test is called for, by the inspector, piping engineer, jurisdictional authority, or for over-water piping, what requirements must be adhered to? The requirements of ASME B31.3 The test fluid should be water unless: There is the possibility of damage due to freezing or other adverse effects of water on the piping system or the process(e.g process incompatibility with water) or unless the test water will become contaminated and its disposal will present environmental problems. Flammable liquid may be used to conduct the pressure test provided the flash point of the liquid is at least _____°F (____°C) or greater/ 120°F (49°C) Piping fabricated of 300 series stainless steel, or containing components of this material, should be hydro tested with a solution made up of potable water, de-ionized-mineralized water, or steam condensate. If potable water is not available, or drying is not possible, then water having a very low chloride level and which of the following may be considered to reduce the risk of pitting and microbiologically induced corrosion? Water with a pH greater than 10 and inhibitor When the pressure test requires the test pressure to be held for any length of time, what precautions should be taken? If the test fluid is subject to thermal expansion, overpressure preventative precautions must be taken. What precautions are required when a pneumatic pressure test is applied as an alternative to liquid pressure testing? The inspection precautions contained in ASME B31.3 shall be applied When the test pressure will exceed the setting of the pressure relieving device, the set pressure adjusting screw can be used to increase the set pressure of the pressure relieving device to prevent it lifting during the pressure test. False- The pressure relieving device should be removed or blanked for the duration of the test. A number of brittle fracture failures have occurred to materials exposed to temperatures below their transition temperatures and to pressures greater than: 25% or the required hydrostatic test pressure or 8ksi of stress which ever is less. Special attention should be given to low-alloy steels, especially ________ because they may be prone to temper embrittlement. 2-1/4CR - 1Mo The metal temperature, during pressure testing, should be maintained at least ____°F (____°C) above the MDMT for piping that is more than 2 inches (5cm) thick. 30°F (17°C) The metal temperature, during pressure testing, should be maintained at least ____°F (____°C) above the MDMT for piping that is 2 inches (5cm) or less thick. 10°F (6°C) How can the inspector verify the installation of the proper material during repairs or alterations of low to high alloy piping systems? At the discretion of the owner-user or the inspector, verification can be accomplished by 100% checking or PMI testing in certain critical situations or by sampling a percentage or the material. you are responsible for verifying the material specifications of replacement piping components. Of the following, which API Recommended Practice would be used by you or the examiner as a guide to verify material specifications? API 578 Material Verification Program for New and Existing Piping Systems What should valves that are subjected to steep temperature cycling be examined for? Thermal fatigue cracking Where should thickness readings be taken on gate valves that are suspected of being exposed to corrosion/erosion? Between the seats since this is an area of high turbulence and stress Control valves or other throttling valves, in high pressure drop and slurry services, can be susceptible to what type of deteriorations? Localized corrosion/erosion of the body downstream or the orifice. Welds are often inspected for corrosion as part of a radiographic profile inspection or as part of internal inspection True When preferential weld corrosion is noted: Additional weld in the same circuit or system should be examined for corrosion. If in service weld inspection reveals imperfections in the weld, such as a crack like flaws and environmental cracking, what should be done? They shall be assessed by an engineer in accordance with API 579 FFS and or corrosion specialist. Preferential weld corrosion shall be assessed by ____ and may use ___ for guidance on weld inspection. The inspector API 577 Environmental cracking shall be assessed by: Piping engineer Some in service piping weldments may not meet the B31.3acceptance criteria; what should be done with these weldments? Nothing, they may perform satisfactorily after being hydrostatically tested. The owner user is required to specify which of the following when detection of certain planar defects is required? UT shear wave examiners that are industry qualified Fasteners, for flanged joints, should extend completely through their nuts. What is the minimum acceptable thread engagement of these fasteners? Fasteners are considered acceptably engaged if the lack of complete engagement is not more than one thread Markings, on samplings of newly installed flange fasteners and gaskets, should be examined to determine that they meet the material specification. Where the specifications would be found in which of the following? In the applicable ASME and ASTM standard The frequency and extent of inspection on piping circuits is dependent up on what two main considerations? Forms of degradation that can affect the piping and consequences of piping failure. Risk-based inspection RBI is described as which of the following? An inspection strategy based on the likelihood and consequence of failure. In performing a consequence assessment, which of the following types of potentials that should be considered listed in API 570 The potential for explosion, fire, toxicity, environmental impact, and other potential effects associated with a failure. A RBI assessment can assist in establishing an inspection strategy by defining all but which of the following? The inspector to be assigned to the inspection activity RBI assessments shall be conducted at what intervals? The assessment shall be conducted at intervals not to exceed the limits specified in API 570for piping service classes If RBI is not being used, the interval between piping inspections shall be established and maintained by using the following criteria: The corrosion rate and remaining life calculations The piping service classification The applicable jurisdictional requirements The judgment of the inspector, the piping engineer, (Read API 570 6.3.3) Thickness measurements should be based on what criteria? For class 1, 2, and 3 piping, the period between thickness measurements for CMLs or circuits should not exceed one-half the remaining life or the maximum intervals recommended in Table 1, whichever is less. When must the inspection interval be reviewed and adjusted? After each inspection or significant change in operating conditions and or inspection results

Show more Read less
Institution
API 570
Course
API 570

Content preview

API 570 Pre-course Study Guide Questions
and Answers correct
API 570 covers inspection, repair, alteration, and re-rating procedures for what type of
piping systems? - answerMetallic and fiberglass reinforced plastic piping systems that
have been in service

Is the use of API 570 limited only to piping systems used in the petroleum and chemical
process industries? - answerNo

Which of the following is an optional fluid service to which API 570 may be applied? -
answerCategory D fluid services

Are all fluid services and classes of piping systems, located within the boundaries of a
refinery or chemical plant, subject to the requirements of API 570? - answerNo, certain
fluid services are optional such as hazardous fluids below the threshold limits, water,
steam, condensate, boiler feed water, and Category D fluid services.

Which of the following applications is optional for inclusion in API 570? -
answerFirewater piping

The owner user organization must develop a quality assurance manual or written
procedure which shall contain all but which of the following? - answerExternal auditing
requirements for the Quality Control system for pressure relieving devices

Who has overall responsibility for compliance with API 570? - answerThe owner user of
the piping system

Who is responsible to the owner for activities involving design, engineering review,
rating, analysis, and evaluation of piping systems? - answerThe piping engineer

The repair organization is responsible for providing materials, equipment, quality
control, and workmanship to meet the requirements of ASME B 31.3 - answerFalse- API
570 not B 31.3

The API 570 inspector is responsible to the owner user for determining that all but which
of the following requirements are met? - answerOperation

Personnel not designated as inspectors, piping engineers, or repair organizations are
responsible for notifying the inspector or piping engineer of any unusual conditions and
providing other assistance where appropriate. - answerTrue

,In developing an inspection plan, a corrosion specialist should be consulted when piping
systems operate at elevated temperatures and for systems that operate below; -
answerThe ductile to brittle transition temperature

The inspection plan shall be developed by: - answerThe inspector and or engineer

The inspection plan is developed from the analysis of several sources of data. Systems
shall be evaluated based on present or possible types of damage mechanisms. The
methods and extent of NDE shall be evaluated to assure they can - answerIdentify the
damage mechanism and the severity of damage

Inspection plans shall be reviewed and amended - answerAs needed

Which of the following is not listed as a minimum content of an inspection plan? -
answerThe length of time the system will be out of service

Identifying the evaluating potential damage mechanisms, current equipment condition,
and the effectiveness of past inspections are; - answerImportant steps in assessing the
probability of piping failure

The RBI probability assessment shall be in accordance with: - answerAPI 580

The consequence of a release is dependent upon: - answerThe type and amount of
process fluid contained in the equipment

Documentation of RBI assessments is essential to clearly define all of the factors
contributing to: - answerThe probability and consequence of failure

When RBI assessments are used to set equipment inspection intervals, the assessment
shall be updated - answerAfter each inspection as defined in API 580

The owner user is preparing a piping system for internal and some external inspections,
which of the following is not listed as part of the safety practices? - answerIdentifying
the remaining piping systems

Before starting an inspection what should inspection personnel do? - answerObtain
permission to work in the vicinity from operating personnel

You are preparing to conduct an inspection of an in-service piping system. What
specific function should you perform? - answerYou should familiarize yourself with the
previous inspection results

Chloride stress corrosion cracking, fatigue, caustic stress corrosion cracking, and
sulfide stress cracking are examples of which of the following typical piping damage
types and mechanisms? - answerSurface connected cracking

,Why are injection points of particular concern with regard to inspection activity? -
answerInjection points are sometimes subject to accelerated or localized corrosion from
normal or abnormal operating conditions

What is the recommended minimum upstream limit of an injection point circuit? -
answerTwelve inches or three pipe diameters, whichever is greater

What is the recommended downstream limit of an injection point circuit? -
answerSecond change in flow direction past the injection point or 25 feet beyond the
first change in flow direction, whichever is less

Which of the following is not one of the recommended guidelines used in establishing
thickness measurement locations (TMLs) within an injection point circuit? -
answerAppropriate locations on the connected vessels

When taking thickness measurements, at injection points, what are the preferred
methods of obtaining these measurements? - answerRadiography and or ultrasonic

Periodically, inspections of an injection point circuit should include more extensive
inspection. What are the recommended limits of this extended inspection? -
answerBeginning 12 inches upstream of the injection nozzle and continuing for at least
ten pipe diameters downstream of the injection point

During the external inspection of a piping system, you notice corrosion build up at a pipe
support contact point. What action may be necessary? - answerLifting the pipe off the
support may be necessary for thorough inspection

Bellows expansion joints should be inspected visually for? - answerUnusual
deformations, misalignment, excessive angular rotation, and displacements that may
exceed design.

During piping and line movement surveillance inspections, branch connections should
receive special attention. - answerTrue

Condition Monitoring Locations (CMLs) should be selected based on what two main
considerations? - answerThe potential for localized corrosion and service specific
corrosion

May CMLs be reduced or eliminated once they have been established? - answerYes
substantial reductions should include consultation with a corrosion specialist

The thinnest reading or an average of several readings in the test point shall be
recorded and used to calculate corrosion rates, remaining life, and inspections
schedules. - answerTrue

, When taking thickness readings on pipe, where should they be taken? -
answerThickness measurements should include each of the four quadrants on the pipe
and fittings, with special attention to the inside and outside radius of elbows and tees

CMLs should be marked on inspection drawings but not on the piping system. -
answerFalse

A complex piping system containing fittings, branches, deadlegs, injection points, and
other similar items would cause you to do which of the following? - answerAssign more
CMLs

Piping systems may require fewer CMLs provided that all but which of the following
characteristics are present? - answerHigher potential for CUI

CMLs may be eliminated entirely for piping systems when what condition(s) exist? -
answerEnvironmental emergency is extremely low, Non corrosive systems, as
demonstrated by history or similar service; and systems not subject to changes that
could cause corrosion as demonstrated by history and or periodic reviews

What nondestructive method is the most accurate means for obtaining thickness
measurements on installed pipe larger than NPS 1? - answerUltrasonic

What technique is preferred for determining areas to be measured for pipe diameters
smaller than NPS 1? - answerRadiographic profile

When corrosion in a piping system is non uniform or the remaining thickness is
approaching retirement thickness, what are the preferred thickness measurements
methods to be employed in this case? - answerRadiography or Ultrasonic scanning

Ultrasonic measurements taken above_____ °F require the use of instruments,
couplants, and procedures that will result in accurate measurements at the higher
temperature. - answer150°F

The accuracy of ultrasonic measurements can be influenced by many factors. Which of
the following factors should not affect the accuracy of ultrasonic measurements? -
answerThickness between 1/8 and 1/4"

Pressure test are not normally conducted as part of a routine inspection. Exceptions to
this include: - answerRequirements of the coast guard for over water piping and
requirements of local jurisdictions, after welded alterations, buried piping or when
specified by the inspector or piping engineer.

If a pressure test is called for, by the inspector, piping engineer, jurisdictional authority,
or for over-water piping, what requirements must be adhered to? - answerThe
requirements of ASME B31.3

Written for

Institution
API 570
Course
API 570

Document information

Uploaded on
June 22, 2025
Number of pages
41
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$16.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Thumbnail
Package deal
API 570 EXAM BUNDLE
-
13 2025
$ 217.37 More info

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Pogba119 Harvard University
View profile
Follow You need to be logged in order to follow users or courses
Sold
53
Member since
1 year
Number of followers
2
Documents
5116
Last sold
3 days ago
NURSING TEST

BEST EDUCATIONAL RESOURCES FOR STUDENTS

3.8

11 reviews

5
4
4
3
3
3
2
0
1
1

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions