after preliminary tasks what will the HACCP team need to work on the initial plan? - Answer:
follow the HACCP principles
which of the following is not included in the corrective action principle?
-record the corrective actions that have been taken
-create a sampling protocol
-determine and correct the cause of non-compliance
-determine the disposition of non compliant product - Answer: create a sampling protocol
using the first principle the team conducts a hazard analysis and identifies
appropriate__________________measures. - Answer: preventive
succesful implementation of HACCp plan depends upon the commitment of _____________? -
Answer: top management
people working on the HACCP plan are responsible for - Answer: developing, implementing, and
maintaining the HACCP plan
thermal processing & chilling are examples of - Answer: critical control points
visual observations, PH, moisture level are some examples of - Answer: monitoring activities