What is the purpose of the swing gear on an excavator - ANSWER It connects the car body to the tracks Who is responsible for inspecting a trench before anyone goes in it - ANSWER The equipment operator What is the preferred sling angle of these angles? 60 degrees 45 degrees 30 degrees - ANSWER 60 degrees

Content preview

MASS HOISTING TEST QUESTIONS &
ANSWERS
What is the purpose of the swing gear on an excavator - ANSWER It connects the car
body to the tracks

Who is responsible for inspecting a trench before anyone goes in it - ANSWER The
equipment operator

What is the preferred sling angle of these angles?
60 degrees
45 degrees
30 degrees - ANSWER 60 degrees

The top of the spoil pile is called - ANSWER Crown

A four foot deep trench requires an additional ladder for every _______of open trench -
ANSWER 25 feet

Materials must be kept back from the edge of the trench a minimum of - ANSWER Two
feet

When can an inspector revoke a hoisting license - ANSWER For failure to pay excise
tax

Who developed the massachusets crane hand signals - ANSWER American National
standards instatute /American society mechanical engineers

DOT stands for - ANSWER Department of transportation

When do you do your walk around of the equipment - ANSWER Before you start it

In the one to 1 sloping ratio what does the second one represent - ANSWER Depth or
vertical rise

On a track machine the gears should be where - ANSWER In the rear

When load leveling when do you deploy your stabilizes or load levelers before or after
you make the lift - ANSWER Before you make your lift

When backfilling an excavation you should use a - ANSWER Small lift shade the ditch

, In the state of Massachusetts what criteria require a hoisting license - ANSWER The
weight of the load exceeds 500 pounds the height of the load exceeds 10 feet the
capacity of the bucket exceeds 1/4 cubic yard

What type of safety system is used on de energized circuits - ANSWER Lockout tagout
total de energization system

In what time frame must the department of Public Safety be notified of a death involving
hoisting equipment - ANSWER Within 1 hour

The boom of the unit you are operating comes in contact with and energized power line
there's no sign of any other dangers such as fire what should you do - ANSWER Stay in
the cab until the lines are de-energized

Can you prohibit the Department of Public Safety from your premises - ANSWER No

Before digging anywhere who do you call and how much notice must you give -
ANSWER Dig safe 72 hours 3 days minimum 30 days maximum

How is the fuel in a diesel engine ignited - ANSWER Heat generated by compression
fuel under pressure

What do you do if your machine comes in contact with an overhead or underground
power lines - ANSWER Stay on the machine warn people to stay away from the
machine try to break the contact call the power company notify the Department of Public
Safety within 1 hour

What do you do if you dig up a gas line - ANSWER Extinguish all open flames and lights
keep people away evacuate the building in the area do not bury the leak call utility
company call police and fire departments notify the Department of Public Safety within 1
hour of accident

Unless the operator takes account of boom deflection when lifted off the ground a
properly rigged load May do what - ANSWER Swing away from the crane

How many cubic feet in a cubic yard - ANSWER 27 cubic feet

How much does a cubic foot of concrete weigh - ANSWER 150 pounds

How much does a cubic foot of steel weigh - ANSWER 490 pounds

How many cubic yards in a block that measures 5 foot by 5 foot by 3 foot - ANSWER 5
times 5 times 3 equals 75 cubic feet / 27 equals 2.77 cubic yards

What does a class 1c license cover in the state of Massachusetts - ANSWER Any type
of hoisting equipment that has a hydraulic boom without wire rope

Document information

Uploaded on
June 19, 2025
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
shantelleG
4.0
(118)
Sold
649
Followers
369
Items
18317
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions