100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

GCSS ARMY UNIT SUPPLY TEST 1 (GTRAC) Exam Questions And Answers Verified 100% Correct

Rating
-
Sold
-
Pages
2
Grade
A+
Uploaded on
17-06-2025
Written in
2024/2025

GCSS ARMY UNIT SUPPLY TEST 1 (GTRAC) Exam Questions And Answers Verified 100% Correct You want to designate a storage bin for a material in your Provisions SLoc. How often must this be done for a material number? - ANSWER d. ONCE When the MRP process runs, what kind of document will the system create when the demand quantity is greater than the on-hand quantity for the same material in the Provisions SLoc? - ANSWER b. PR Performing a PGR for an expendable or durable item will ________ - ANSWER c. Increase the Provisions SLoc A material is found on installation and does not have a corresponding STO/PO. How will you bring the material onto the Provisional SLoc? - ANSWER a. Transaction code MIGO with movement type 501 The Order Status Report (ZPROSTAT) allows you to display which of the following document types? - ANSWER d. All of the above Which of the following component replacements is available for issue to the PB01 work order? - ANSWER a. . The three-digit Supply Type Unit Code business-area identifier assigned to a DoDAAC/FEs Unit Supply - ANSWER d. 950 You are using transaction code MD04 to view the effects of Material Requirements Planning (MRP). How much stock is available for issue in the below image - ANSWER a. 0 The available quantities in the MD04 report are according to which unit of measure? - ANSWER a. Ordering A "start transaction" is set to be the system's first screen displayed once you log in to GCSS-Army. Setting up a start transaction is ________ - ANSWER c. Performed on a daily basis Core GCSS-Army transaction for Unit Supply are accessed from which of the following transaction codes? - ANSWER b. ZUSMENU Execution Management for ________ occurs at the Brigade SPO or equivalent while Materiel Management for ________ at the Sustainment Brigade or equivalent. - ANSWER c. Plant 2000, Plant 2001

Show more Read less
Institution
GCSS ARMY UNIT SUPPLY
Course
GCSS ARMY UNIT SUPPLY








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
GCSS ARMY UNIT SUPPLY
Course
GCSS ARMY UNIT SUPPLY

Document information

Uploaded on
June 17, 2025
Number of pages
2
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

GCSS ARMY UNIT SUPPLY TEST 1 (GTRAC)
Exam Questions And Answers Verified 100% Correct


You want to designate a storage bin for a material in your Provisions SLoc. How
often must this be done for a material number? - ANSWER d. ONCE

When the MRP process runs, what kind of document will the system create when the
demand quantity is greater than the on-hand quantity for the same material in the
Provisions SLoc? - ANSWER b. PR

Performing a PGR for an expendable or durable item will ________ - ANSWER c.
Increase the Provisions SLoc

A material is found on installation and does not have a corresponding STO/PO. How
will you bring the material onto the Provisional SLoc? - ANSWER a. Transaction code
MIGO with movement type 501

The Order Status Report (ZPROSTAT) allows you to display which of the following
document types? - ANSWER d. All of the above

Which of the following component replacements is available for issue to the PB01
work order? - ANSWER a. 002277356

. The three-digit Supply Type Unit Code business-area identifier assigned to a
DoDAAC/FEs Unit Supply - ANSWER d. 950

You are using transaction code MD04 to view the effects of Material Requirements
Planning (MRP). How much stock is available for issue in the below image -
ANSWER a. 0

The available quantities in the MD04 report are according to which unit of measure?
- ANSWER a. Ordering

A "start transaction" is set to be the system's first screen displayed once you log in to
GCSS-Army. Setting up a start transaction is ________ - ANSWER c. Performed on a
daily basis

Core GCSS-Army transaction for Unit Supply are accessed from which of the
following transaction codes? - ANSWER b. ZUSMENU
$6.39
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
TopGradeGuru
1.5
(2)

Get to know the seller

Seller avatar
TopGradeGuru Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
10
Member since
11 months
Number of followers
0
Documents
2307
Last sold
2 days ago
GRADEHUB

We provide access to a wide range of professionally curated exams for students and educators. It offers high-quality, up-to-date assessment materials tailored to various subjects and academic levels. With instant downloads and affordable pricing, it's the go-to resource for exam preparation and academic success.

1.5

2 reviews

5
0
4
0
3
0
2
1
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions