Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 4 pages
Exam (elaborations)

AIC Chapter 10 Exam Questions with correct Answers 2025/2026 A+ Graded 100% Verified

Document preview thumbnail
Preview 1 out of 4 pages

AIC Chapter 10 Exam Questions with correct Answers 2025/2026 A+ Graded 100% Verified

Content preview

AIC Chapter 10 Exam Questions with
correct Answers 2025/2026 A+ Graded
100% Verified
The order of priority for material - ANS-Driven by which material is needed first or by how long it
takes to procure the material

bid shopping/bid peddling - ANS-The act of showing subcontractors their competitors' prices in
the hope that they will lower their bid

What is the process of screening subcontractors before they bid a project to ensure they are
capable of completing the work called - ANS-prequalifying

procurement process includes: - ANS-bid scope of work, award, contract, submittals, order
material and equipment, and installation and invoicing

Bid scope of work - ANS-Once the design is complete, contract documents should be sent to
several contractors (three or more is generally acceptable) to price a specific scope of work

Award - ANS-The successful contractor is notified that their bid was accepted with a letter of
intent or notice of award. The receipt of this notification authorizes the contractor to start
precontract administrative activities, such as generating submittals, acquiring insurance, and
obtaining bonding

contract - ANS-After the bids are evaluated, a formal contract with the scope of work is
negotiated and agreed to by the parties

submittals - ANS-include product/material data, shop drawings, and samples, are provided by
the subcontractor and reviewed by the prime contractor and the design team

order material and equipment - ANS-Only after the submittals have been reviewed can material
be ordered. The document used with freight companies, which are commonly referred to as
common carriers, is called a bill of lading

installation and invoicing - ANS-Typically, the contractor can bill for the material even if it isn't
installed in their next billing cycle.

FOB - ANS-Freight on Board refers to when ownership of the material is transferred

Document information

Uploaded on
June 4, 2025
Number of pages
4
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
annlinsey
3.0
(4)
Sold
26
Followers
0
Items
699
Last sold
4 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions