Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

C51- STRUCTURAL STEEL CONTRACTOR TEST 1 EXAM 2025 QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
11
Grade
A+
Uploaded on
01-06-2025
Written in
2024/2025

C51- STRUCTURAL STEEL CONTRACTOR TEST 1 EXAM 2025 QUESTIONS AND ANSWERS What is a sorting yard used for? - ANS Sorting steel members Tie-downs are generally used for cranes: - ANS To hold the crane body in place during shipment How do you prepare hot-rolled mill-finish steel for spray painting? - ANS It should be sandblasted first to remove rust from mill Which of the following is correct regarding air compressors? - ANS Don't use one that turns on and off What are four basic types of steel stairs? - ANS Straight, angle, curved, spiral Wire rope on equipment that has been idle for a period of _____________ or more should be inspected completely. - ANS 2 days What type of steel is designated for rivets? - ANS A502 2 | P a g e C o p y r i g h t © 2 0 2 5 T H E B R I G H T A L L R I G H T S R E S E R V E D According to the Building Code, if a demolition of a building higher than 8 ft is taking place, what sort of protection is required within 6 ft of the building? - ANS A fence and a canopy The total of the following numbers 8 5/8", 6 1/4", 7 3/16", and 5 1/4" is ___________. - ANS 27 5/16" End columns anchored to foundations are exactly plumb only when the steel is at ___________ temperature. - ANS Normal On a crane with a relatively heavy capacity, the boom falls is secured to a ________ fastened to the back end of the crane-body frame. - ANS Gantry Who supplies the anchor bolts for a job? - ANS Structural Steel Fabricator According to the Building Code, if a structure is 8 ft or less in height, which of the following is not required when the structure is demolished? - ANS Fence and Canopy When a building is being designed, and a crane or guy derrick will have to be used, how is the building modified to accommodate the extra weight of the crane or derrick? - ANS Columns are made stronger The cost of making shop or working drawings for steel structures is usually figured by the: - ANS Number of sheets required for layout, details, erection diagrams, etc. What is commonly used as a pre-treatment for steel to improve the bond for the finish coat of paint? - ANS Zinc-based primer Referring to the drawings seen here, what is the approximate weight of the column along Grid Line E at Section CC? (No

Show more Read less
Institution
STRUCTURAL STEEL CONTRACTOR
Course
STRUCTURAL STEEL CONTRACTOR

Content preview

C51- STRUCTURAL STEEL
CONTRACTOR TEST 1 EXAM 2025
QUESTIONS AND ANSWERS




What is a sorting yard used for? - ANS Sorting steel members



Tie-downs are generally used for cranes: - ANS To hold the crane body in place during
shipment



How do you prepare hot-rolled mill-finish steel for spray painting? - ANS It should be
sandblasted first to remove rust from mill



Which of the following is correct regarding air compressors? - ANS Don't use one that turns
on and off



What are four basic types of steel stairs? - ANS Straight, angle, curved, spiral


Wire rope on equipment that has been idle for a period of _____________ or more should be
inspected completely. - ANS 2 days



What type of steel is designated for rivets? - ANS A502




1|P a g e C o p y r i g h t © 2 0 2 5 T H E B R I G H T A L L R I G H T S R E S E R V E D

, According to the Building Code, if a demolition of a building higher than 8 ft is taking place,
what sort of protection is required within 6 ft of the building? - ANS A fence and a canopy


The total of the following numbers 8 5/8", 6 1/4", 7 3/16", and 5 1/4" is ___________. -
ANS 27 5/16"


End columns anchored to foundations are exactly plumb only when the steel is at ___________
temperature. - ANS Normal


On a crane with a relatively heavy capacity, the boom falls is secured to a ________ fastened to
the back end of the crane-body frame. - ANS Gantry



Who supplies the anchor bolts for a job? - ANS Structural Steel Fabricator


According to the Building Code, if a structure is 8 ft or less in height, which of the following is
not required when the structure is demolished? - ANS Fence and Canopy


When a building is being designed, and a crane or guy derrick will have to be used, how is the
building modified to accommodate the extra weight of the crane or derrick? - ANS Columns
are made stronger


The cost of making shop or working drawings for steel structures is usually figured by the: -
ANS Number of sheets required for layout, details, erection diagrams, etc.


What is commonly used as a pre-treatment for steel to improve the bond for the finish coat of
paint? - ANS Zinc-based primer


Referring to the drawings seen here, what is the approximate weight of the column along Grid
Line E at Section CC? (No diagram)(Find height of beam, drawings should have lb/ft) -
ANS 1072 lbs

2|P a g e C o p y r i g h t © 2 0 2 5 T H E B R I G H T A L L R I G H T S R E S E R V E D

Written for

Institution
STRUCTURAL STEEL CONTRACTOR
Course
STRUCTURAL STEEL CONTRACTOR

Document information

Uploaded on
June 1, 2025
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Thebright Florida State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
228
Member since
1 year
Number of followers
6
Documents
13784
Last sold
1 week ago
Topscore Emporium.

On this page, you find verified, updated and accurate documents and package deals.

3.6

42 reviews

5
15
4
10
3
9
2
3
1
5

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions