Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 18 pages
Exam (elaborations)

Apics CPIM Section A Exam 2025 Questions and Answers

Document preview thumbnail
Preview 3 out of 18 pages

Apics CPIM Section A Exam 2025 Questions and Answers

Content preview

Apics CPIM Section A Exam 2025
Questions and Answers


Electronic Data Interchange (EDI) - Correct Answer✔️✔️-Paperless (electronic) exchange

documents, such as purchase orders, shipment authorizations, advanced shipment notices, and

invoices, using standardized formats


Lean production - Correct Answer✔️✔️-A philosophy of production that emphasizes the

minimization of the amount of all the resources (including time) used in the various activities of the

enterprise. It involves identifying and eliminating non-value-adding activities in design, production,

supply chain management, and dealing with customers.


U-lines - Correct Answer✔️✔️-Production lines shaped like the letter "U." The shape allows

workers to easily perform several non-sequential tasks without much walk time. The number of

workstations in a u-line is usually determined by line balancing.


MURI - Correct Answer✔️✔️-A Japanese word meaning strain or overburden.


Materials Management - Correct Answer✔️✔️-Grouping of management functions supporting the

complete cycle of material flow from the purchase and internal control of production materials to

the planning and control of work in process to the warehousing, shipping, distribution of the

finished product.


FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 1

,Postponement - Correct Answer✔️✔️-A product design or supply chain strategy that deliberately

delays final differentiation (assembly, production, packaging, tagging, etc.) until the latest possible

time in the process.


Genchi Genbutsu - Correct Answer✔️✔️-A Japanese phrase meaning to visit the shop floor to

observe what is occurring.


Make to Order - Correct Answer✔️✔️-A production environment where a good or service can be

made after receipt of a customers order. The final product is usually a combination of standard

items, and items custom-designed to meet the special needs of the customer.


Participative design/engineering - Correct Answer✔️✔️-A concept that refers to the simultaneous

participation of all the functional areas of the firm in the product design activity. Suppliers and

customers are often also included.


Order Winners - Correct Answer✔️✔️-Those competitive characteristics that cause a firms

customers to choose that firms goods and services over those of its competitors.


Purchasing Lead Time - Correct Answer✔️✔️-Total lead time required to obtain a purchased item.

Included here are order preparation and release time; supplier lead time; transportation time; and

receiving, inspection, and put-away time.


Component - Correct Answer✔️✔️-The raw material, part, or sub-assembly that goes into a

higher-level assembly, compound, or other item. May also include packaging materials for finished

items.




FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 2

, Delivery Lead Time - Correct Answer✔️✔️-The time from the receipt of a customer order to the

delivery of the product.


Gantt Chart - Correct Answer✔️✔️-The earliest and best-known type of planning and control

chart, especially designed to show graphically the relationship between planned performance and

actual performance over time.


Closed-loop MRP - Correct Answer✔️✔️-A system built around material requirements planning

that includes the additional planning processes of production planning (sales and operations

planning), master production scheduling, and capacity requirements planning. Once this planning

phase is complete and the plans have been accepted as realistic and attainable, the execution

processes come into play. These processes include the manufacturing control processes of input-

output (capacity) measurement, detailed scheduling and dispatching, as well as anticipated delay

reports from both the plant and suppliers, supplier scheduling, and so on. The term closed loop

implies not only that each of these processes is included in the overall system, but also that feedback

is provided by the execution processes so that the planning can be kept valid at all times.


Cellular Manufacturing - Correct Answer✔️✔️-A manufacturing process that produces families of

parts within a single line or cell of machines controlled by operators who work only within the line

or cell.


supply chain - Correct Answer✔️✔️-The global network used to deliver products and services

from raw materials to end customers through an engineered flow of information, physical

distribution, and cash.




FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 3

Document information

Uploaded on
May 30, 2025
Number of pages
18
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EmilyCharlene
3.7
(114)
Sold
507
Followers
139
Items
22946
Last sold
2 weeks ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions