100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CDT PRACTICE EXAM FINAL QUESTIONS AND ANSWERS A-GRADED

Rating
-
Sold
-
Pages
34
Grade
A+
Uploaded on
29-05-2025
Written in
2024/2025

CDT PRACTICE EXAM FINAL QUESTIONS AND ANSWERS A-GRADED CDT PRACTICE EXAM FINAL QUESTIONS AND ANSWERS A-GRADED CDT PRACTICE EXAM FINAL QUESTIONS AND ANSWERS A-GRADED CDT PRACTICE EXAM FINAL QUESTIONS AND ANSWERS A-GRADED CDT PRACTICE EXAM FINAL QUESTIONS AND ANSWERS A-GRADED CDT PRACTICE EXAM FINAL QUESTIONS AND ANSWERS A-GRADED CDT PRACTICE EXAM FINAL QUESTIONS AND ANSWERS A-GRADED

Show more Read less
Institution
CDT PRACTICE
Course
CDT PRACTICE











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CDT PRACTICE
Course
CDT PRACTICE

Document information

Uploaded on
May 29, 2025
Number of pages
34
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CDT PRACTICE EXAM FINAL QUESTIONS AND
x x x x x x



ANSWERS A-GRADED x x

x
x
x
x
Which xof xthese xdocuments, xmight xwe xfind xin
xthe


Project xManual xbut xthey xare xnot xcontract
xdocuments?
x
x
(A) xThe

xAgreement
x
(B) xProcurement

xDocuments
x
(C)
xAddendum


(D) xSupplemental xConditions x- xCORRECT xANSWER-Answer:
xB
x

Reference: xPDPG x11.1.6 x
x

Explanation: xProcurement xrequirements xare
xaddressed xto xprospective xbidders xor xproposers

xinterested xin xthe xproject. xAlthough xnot xnecessarily

xpart xof xa xcontract, xthe xprocurement xrequirements

xare xusually xbound xwith xother xwritten xconstruction

xdocuments xinto xa xproject xmanual. x
x

Before xa xmodel xbuilding xcode xcan xbecome xthe
xbuilding xcode xfor xa xjurisdiction, xit xhas xto xbe

xadopted xby? x
x

(A) Authority xHaving xJurisdiction x
(B) State xGovernment x
(C) Building xInspector x
(D) International xOrganization xfor x
Standardization x- xCORRECT xANSWER-Answer: xA x
x

Reference: xPDPG x4.3 x
x

Explanation: xBefore xa xmodel xbuilding xcode xcan
xbecome xthe xbuilding xcode xfor xa xjurisdiction, xit xhas

xto xbe xadopted xby xthat xAHJ. xOnce xadopted, xthey

xthen xare xresponsible xfor xenforcing xthat xbuilding

xcode xwithin xtheir xjurisdiction. x
x

The xConstruction xManager xis xhired xby xthis xentity? x
x

,(A) xThe

xGeneral

xcontractor
x
(B)
xOwner
x
(C)
xA/E


(D) xContract xAdministrator
x- xCORRECT xANSWER-

Answer: xB
x

Reference: xPDPG x2.6.4 x
x

Explanation: xThe xowner xusually xengages xthe
xservices xof xa xconstruction xmanager, xan xentity xthat

xtypically xcontracts xwith xthe xowner xto xprovide

xconstruction xmanagement xservices. x
x

The xparties xto xthe xConstruction xAgreement xare? x
x

(A) General xContractor, xSub xContractor, xand x
Construction xManager x
(B) A/E, xGeneral xContractor, xand xContract x
Administrator x
(C) Building xOfficial, xand xGeneral xcontractor x
(D) Owner, xContractor, xand xA/E x- xCORRECT xANSWER-Answer: xD x
x

Reference: xPDPG x7.2.3.1 x
x

Explanation: x(PDPG xFigure x5.1) xThe xtripartite xrelationship xamong xthe xowner,
xcontractor, xand xA/E xis xcreated xby xobligations xto xthird xparties xto xthe xcontract. xFor

xexample, xthe xowner-A/E xagreement xmay xrequire xcertain xduties xof xthe xA/E xacting xon

xbehalf xof xthe xowner x

during xconstruction. xThe xcontractor xhas xa xright xto xrely xon xthe xproper xperformance
xof xthese xduties. xThe xA/E, xsimilarly, xrelies xon xthe xcontractor xto xperform xcertain

xduties xidentified xin xthe xowner-contractor xagreement, xeven xthough xthe xA/E xis xnot xa

xparty xto xthat xcontract. x

The x
A/E xrelationship xto xthe xcontractor xin xthe xowner-contractor xagreement xis xa xthird-
party xrelationship. xThese xthird-party xrelationships xcreate xthe xthird xside xof xthe
xtriangle xin xthe xconstruction xprocess.(PDPG x7.2.3.1) xThe xowner xcontracts xfirst

xwith xthe xA/E xto xdesign xthe xproject xand xto xprepare xbidding xdocuments. xThe

xowner xthen xobtains xbids xthrough xthe xcompetitive xbidding xprocess xfrom xbidding

xcontractors. xWhen xone xof xhe xbidders xis xselected x

,by xthe xowner, xthe xowner xwill xeither xdirectly xenter xinto xthe xcontract x(such xas xfor xa
xproject xto xbe xconstructed xwith xpublic xfunds), xor xnegotiate xthe xfinal xcost xand xthen

xenter xinto xthe xcontract x(such xas xfor xa xprivately xfunded xproject). x
x

The xorganization x responsible for
x x the
xGeneral
x
Conditions xknown x as x 201
xare?
x

(A) DBIA x
(B) AGC x
(C) AIA x
(D) CSI x- xCORRECT xANSWER-Answer: xC x
x

Reference: xPDPG x11.5.4.2 x
x

Explanation: xEach xdocument xdeals xwith xproject
xconditions xand xissues xin xa xsimilar xmanner xbut xwith

xlanguage xdetermined xto xbe xin xaccord xwith xthe

xneeds xof xeach xorganization. x
x

When xthere xis xa xdispute xbetween xthe xspecifications
xand xthe xdrawings, xwhat xis xthe xproper xway xto xsettle

xthe xdispute? x
x
x
(A) xThe xdrawings xhave
xpriority
x
(B) xThe xA/E xshould
xinterpret
x
(C) xThe

xspecifications


(D) xArbitration x- xCORRECT xANSWER-Answer:
xB
x

Reference: xPDPG x11.2.9.4, x13.9.1.1, xAIA xA201 x1.2.1 x
x

Explanation: xThe xdrawings xand xspecification xare xcomplementary xdocuments xin
xthe xAIA xand xEJCDC xgeneral xconditions. x(PDPG x11.2.9.4) xPrecedence:

xQuestions xof xprecedence xoften xarise xamong xlarge xscale xdrawings, xsmall-scale

xdrawings, xand xspecifications. xHowever, xthe xuse xof xstatements xin xthe xproject

xmanual xto xestablish xthe xprecedence xof xthe xvarious xcontract xdocuments xis xnot

xrecommended xbecause xthe xdocuments xare xcomplementary. xThe xgeneral

xconditions xof xthe xcontract xshould xindicate xonly xthat xin xa xcase xof xconflict

xbetween xdrawings xand xspecifications, xthe xA/E xwill xmake xa xdocumented

xinterpretation. x(PDPG x13.9.1.1) xWhen xthe xcontract xdocuments xare xbeing

xinterpreted, xthe xcontents xof xthe xdrawings xand xthe xspecifications xmust xbe

xconsidered xtogether. xIf xan xitem xis xnot xaddressed xin xboth xthe xdrawings xand xthe

, xspecifications, xit xdoes xnot xmean xthat xit xis xnot xrequired xfor xthe xproject. x(AIA
xA201 x1.2.1) xThe xContract xDocuments xare xcomplementary, xand xwhat xis

xrequired xby xone xshall xbe xas xbinding xas xif xrequired xby xall x
x

A xsubcontractor xis xobligated xto xthe xprime
xcontractor
x
in xthe xsame xmanner xas xthe xprime xcontractor
xis
x
obligated xto

xthe:
x

(A) Architect x
(B) Owner x
(C) Material xSupplier x
(D) Principal xin xCharge x- xCORRECT xANSWER-Answer: xB x
x

Reference: xPDPG x2.4.2 x, x2.5 x
x

Explanation: xA xsubcontractor xgenerally xprovides xlabor xat xthe xsite. xA xmaterial xsupplier
xfurnishes xthe xmaterials xfor xothers xto xinstall. x(PDPG x2.4.2)Subcontractor: xAn xentity

xthat xhas xa xdirect xcontract xwith xthe xcontractor xto xperform xa xportion xof xthe xwork xof

xthe xproject xat xthe xsite. x(PDPG x2.5) x

Supplier: xFurnishes xor xsupplies xproducts xor xservices xfor xthe xproject, xbut xdoes xnot
xperform xlabor xat xthe xsite. x
x

The xrequirements xof xthe xgeneral xconditions xcan xbe x
modified xor xexpanded xto xaccommodate xspecific xproject xconditions, xowner's
xrequirements, xor xunusual xaspects xrelating xto xthe xroles, xrights, xduties, xand

xresponsibilities xof xthe xparties xto xthe xcontract xfor xconstruction, xin xthis xdocument: x
x
x
(A) xContract

xModifications
x
(B) xSupplemental

xConditions
x
(C)
xAddendum


(D) xConsensus xDocuments x- xCORRECT xANSWER-Answer:
xB
x

Reference: xPDPG x11.5.4.3 x
x

Explanation: xThe xrequirements xof xthe xgeneral xconditions xcan xbe xmodified xor
xexpanded xin xthe xsupplementary xconditions xto xaccommodate xspecific xproject

xconditions, xowner's xrequirements, xor xunusual xaspects xrelating xto xthe xroles, xrights,

xduties, xand xresponsibilities xof xthe xparties xto xthe xcontract xfor xconstruction.

xSupplementary xconditions xare xnot xstandard xfor xevery xproject xand xmust xbe xprepared

xbased xon xrequirements xof xthe xspecific xproject. x
x

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ACADEMICSUCCESS stuvia
View profile
Follow You need to be logged in order to follow users or courses
Sold
44
Member since
9 months
Number of followers
3
Documents
5076
Last sold
1 week ago
STUDY HUB

WELCOME TO MY STUDY HUB ! I CREAT CLEAR CONCISE, AND EXAM-FOCUSED NOTES DESIGNED TO SAVE YOUR TIME AND BOOST YOUR GRADES .EVERY DOCUMENT IS CRAFTED FROM VERIFIED COURSE MATERIALS , STRUCTURED FOR EASY UNDERSTANDING, AND OPTIMIZED FOR QUICK REVISION . IF YOU WANT RELIABLE ,HIGH QUALITY RESOURCES THAT ACTUALLY HELP YOU SCORE HIGHER , YOU'RE IN THE RIGHT PLACE !"

4.3

24 reviews

5
18
4
2
3
0
2
1
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions