Owner Builder Exam UPDATED ACTUAL Exam Questions and CORRECT Answers At what depth of trench is shoring require / At what depth of an excavation is shoring required? - CORRECT ANSWER - 1.2 M or 4 Feet How can shoring be done past 4 feet? - CORRECT ANSWER purpose-built shoring, or, it is acceptable to use plywood if it is properly constructed. - This can be done with Which of the following is not an acceptable method for determining the correct grading for a trench? - CORRECT ANSWER - experienced contractor says it's ok

Show more Read less
Institution
BC Owner Builder
Course
BC Owner Builder











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
BC Owner Builder
Course
BC Owner Builder

Document information

Uploaded on
May 28, 2025
Number of pages
33
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Owner Builder Exam UPDATED ACTUAL
Exam Questions and CORRECT Answers
At what depth of trench is shoring require / At what depth of an excavation is shoring required? -
CORRECT ANSWER - 1.2 M or 4 Feet



How can shoring be done past 4 feet? - CORRECT ANSWER - This can be done with
purpose-built shoring, or, it is acceptable to
use plywood if it is properly constructed.


Which of the following is not an acceptable method for determining the correct grading for a
trench? - CORRECT ANSWER - experienced contractor says it's ok


Before a worker enters any excavation over 1.2 m (4 ft) in depth or, while in the excavation,
approaches closer to the side or bank than a distance equal to the depth of the excavation, the
employer must ensure that the

sides of the excavation are - CORRECT ANSWER - (a) sloped as specified in writing by a
qualified registered professional,
(b) sloped at angles, dependent on soil conditions, which will ensure stable faces, but in no case,
may the slope or combination
of vertical cut and slope exceed that shown in Figure 20-1,
(c) benched as shown in Figure 20-2,
(d) supported as specified in writing by a professional engineer,
(e) supported in accordance with the minimum requirements of section 20.85, or
(f) supported by manufactured or prefabricated trench boxes or shoring cages, or other effective
means.


Which best describes the design principle of rain water deflection? - CORRECT
ANSWER - Design and construction which stops water from ever entering

,What lighting certifications are required in Canada? - CORRECT ANSWER - CSA safety
certification


What grit of sandpaper would get smoothest result? 150-180 etc. - CORRECT ANSWER -
The higher the grade, the smoother the finish. When finishing a surface, you typically start with a
low grit and
work up to a high grit.


What is the maximum rise in a flight of stairs?

a. The vertical height any flight stairs - CORRECT ANSWER - The vertical height shall
not exceed 3.7 M


What is the minimum distance that a ladder must extend above a parapet wall or landing? -
CORRECT ANSWER - 3 feet


If you have a 4m ladder, how far from the wall does the base of the ladder have to be? -
CORRECT ANSWER - 74 degrees or 4:1 ratio. So 4 m ladder, needs to be 1 m away.



What heights are end dams to be on window and door flashings? - CORRECT ANSWER -
25 mm / 1 inch (from BCBC)


When to call for inspections and how to make them efficient as possible? - CORRECT
ANSWER - Group together when possible and call when work is complete



When is an HRV required? - CORRECT ANSWER - Almost always:
"Effective December ϭε, ϮϬϭκ residential dwelling units, such as houses, apartments and
secondary suites will be required to have
a principal ventilation system that exhausts air from bathrooms and kitchens and supplies fresh
air to bedrooms and living areas
[ε.ϯϮ.ϯ.ϯ."

,"Some small dwelling units in mild climates are permitted to supply fresh air through passive
vents [9.32.3.4.(6)], but for most
dwelling units exhaust and supply will require a mechanical fan"


What can you build under the owner-builder HPO process? - CORRECT ANSWER -
Single detached home under a single title. One single dwelling unit in or attached to a pre-
existing building older than 10 years (includes
the addition of a unit to convert a detached home to a duplex, or conversion of a duplex to
triplex, or conversion of non -residential space
to a dwelling unit). One single dwelling unit in or attached to a new non-residential building (one
only per building, such as a caretaker suite
or home built above a family-run store).
12. Who issues permits for a gas fireplace?


Which of the following is not allowed under the HPO owner-builder program? - CORRECT
ANSWER - A new dwelling unit attached to building *newer*
than 10 years old


Who issues permits for a gas fireplace? - CORRECT ANSWER - The Safety Authority -
Now called Technical Safety BC


Can an owner builder take out his or her own electrical permit? - CORRECT ANSWER -
Yes -work up to 200A is allowed.


What types of Buildings that Can be Wired by Homeowners? - CORRECT ANSWER -
You are entitled to do electrical work in a fully detached residential dwelling that you occupy or
intend to occupy. Your
dwelling may not contain a suite. Fully detached dwellings are buildings that are designed for
single family use only.
You are not allowed to do electrical work in or on any buildings if:
ͻ you do not live in or intend to live in the dwelling,

, ͻ any part of the building includes a separate self-contained suite or occupancy,
ͻ the building, or any part of the building is being used to provide rental income, or
ͻ the building, or any part of the building is used for commercial purposes.


What is the best practice to apply asphalt waterproofing on a foundation? - CORRECT
ANSWER - Spray-on or roll on dry foundation with 2inch (max) below grade



What is best practice for waterproofing on foundation? - CORRECT ANSWER - Spray or
roll 12 inch above grade on dry surface


When is the appropriate time to backfill a foundation? - CORRECT ANSWER - After
Damp-proofing


Where does one apply Damp-proofing Material - CORRECT ANSWER - Exterior damp-
proofing shall be applied from finished ground level to the top of the exterior of the footing.


What do you need to do when applying a peel and stick waterproof membrane foundation? -
CORRECT ANSWER - Use an approved primer before installing



The distance from the gas vent to the roof must be... - CORRECT ANSWER - ...greater
than the overhang of the roof. Nothing (no gas appliance exhaust vents) within
1m either side and 4.5 meters above. Any powered air intake must not be within 3 meters.


When do you need to install a handrail, or have worker wear fall protection? - CORRECT
ANSWER - 10 feet above grade


If a worker has no fall protection, at what height must a handrail be provided? - CORRECT
ANSWER - 4 feet

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES Stanford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1094
Member since
1 year
Number of followers
102
Documents
68972
Last sold
7 hours ago
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

175 reviews

5
75
4
31
3
46
2
8
1
15

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions