WASTEWATER CLASS C EXAM 2025 QUESTIONS AND ANSWERS

Beoordeling
-
Verkocht
-
Pagina's
14
Cijfer
A+
Geüpload op
27-05-2025
Geschreven in
2024/2025

Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 1 The Activated Sludge Process: A. requires preaeration B. requires Activated Carbon C. is an aerobic biological process. D. Usually precedes primary sedimentation. E. Requires 50% by volume old sludge to work effectively. - ANS C. Is an Aerobic biological process A complete mix activated sludge plant has a fast settling sludge and high amounts of pin floc leaving the clarifier. One way to correct this problem is to : A. Increase the RAS Flow B. Reduce Wasting Rates C. Increase dissolved oxygen levels. D. Increase the F/M ratio by wasting more E. Increase the sludge age by wasting less. - ANS D. Increase the F/M Ratio by Wasting More Which of the following flow rates should be measured if the operator is to control plant properly? WASTEWATER CLASS C EXAM 2025 QUESTIONS AND ANSWERS Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 2 A. Aeration rate or resulting dissolved oxygen level. B. Influent or effluent. C. return sludge D. waste sludge E. all the above - ANS E. all the above During start up your aeration tank produces excessive amounts of billowing white foam. This can be corrected by: A. Doing nothing, it will go away in a few hours B. Increasing the sludge wasting rate C. Seeding the process with sufficient good quality sludge D. Spraying water on the foam until it is gone E. Taking a weeks vacation - ANS C. Seeding the process with sufficient good quality sludge In solving an operational problem at a treatment plant: A. there is almost always a good technical solution. It may require considerable experience and time to learn whaat it is. B. Human errors have to be corrected since the operator is at fault. C. don't let the laboratory personnel influence you're judgement as to what the best solution is. D. standard textbooks in sanitary engineering are the best source of information. E. It is best to do nothing until the TNRCCC sends a violation notice. - ANS A. there is almost always a good technical solution. It may require considerable experience and time to learn whaat it is. When the return slu

Meer zien Lees minder
Instelling
WASTEWATER
Vak
WASTEWATER









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
WASTEWATER
Vak
WASTEWATER

Documentinformatie

Geüpload op
27 mei 2025
Aantal pagina's
14
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

WASTEWATER CLASS C EXAM 2025
QUESTIONS AND ANSWERS



The Activated Sludge Process:


A. requires preaeration
B. requires Activated Carbon
C. is an aerobic biological process.
D. Usually precedes primary sedimentation.

E. Requires 50% by volume old sludge to work effectively. - ANS C. Is an Aerobic biological
process


A complete mix activated sludge plant has a fast settling sludge and high amounts of pin floc
leaving the clarifier. One way to correct this problem is to :


A. Increase the RAS Flow
B. Reduce Wasting Rates
C. Increase dissolved oxygen levels.
D. Increase the F/M ratio by wasting more

E. Increase the sludge age by wasting less. - ANS D. Increase the F/M Ratio by Wasting More


Which of the following flow rates should be measured if the operator is to control plant
properly?


Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 1

, A. Aeration rate or resulting dissolved oxygen level.
B. Influent or effluent.
C. return sludge
D. waste sludge

E. all the above - ANS E. all the above


During start up your aeration tank produces excessive amounts of billowing white foam. This
can be corrected by:


A. Doing nothing, it will go away in a few hours
B. Increasing the sludge wasting rate
C. Seeding the process with sufficient good quality sludge
D. Spraying water on the foam until it is gone

E. Taking a weeks vacation - ANS C. Seeding the process with sufficient good quality sludge


In solving an operational problem at a treatment plant:


A. there is almost always a good technical solution. It may require considerable experience and
time to learn whaat it is.
B. Human errors have to be corrected since the operator is at fault.
C. don't let the laboratory personnel influence you're judgement as to what the best solution is.
D. standard textbooks in sanitary engineering are the best source of information.

E. It is best to do nothing until the TNRCCC sends a violation notice. - ANS A. there is almost
always a good technical solution. It may require considerable experience and time to learn
whaat it is.


When the return sludge rate is too low, what happens?

Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 2

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Brightstars Havard School
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
193
Lid sinds
1 jaar
Aantal volgers
7
Documenten
12191
Laatst verkocht
5 dagen geleden
VERIFIED EXAMS AND STUDY GUIDES.

Here, you will find Study Notes, Exam answer packs 100% Guarenteed success.

3.3

31 beoordelingen

5
10
4
4
3
8
2
3
1
6

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen