100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

FDOT EARTHWORK LEVEL 1 EXAM 2025 QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
27-05-2025
Written in
2024/2025

Basics covered in Level 1 - ANS Nuclear Testing Speedy Moisture Report Forms Earthwork has to do with the roadway in what way? - ANS Earthwork is the excavation and placement of soils and materials supporting the proposed roadway. In Earthwork what is a lift? - ANS 6" of compacted depth at full width In Earthwork what is a Lot? - ANS A lot is 1 lift at 500 ft or within compacted area. Isolated compaction operations are separate lots. Sampling at the roadway is done for - ANS Done for base, sub grade, and embankment. Sampling is determined how - ANS generated with random numbers usually by a Verification Inspector What is important about sampling at the roadway - ANS Minimum of three representative sample combined. FDOT EARTHWORK LEVEL 1 EXAM 2025 QUESTIONS AND ANSWERS Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 2 What is LIMS? - ANS Laboratory Info Management System The proctor theory is when compaction is achieved how - ANS by inputting energy to expel air and water in the soil voids Compaction causes - ANS An increase in unit weight, decrease in compressibility and permeability. The proctor is determined where and creates what - ANS In a laboratory and establishes a density standard to be used on the roadway Lab proctors are created how - ANS Material is gathered from the road and prepared with different amounts of water then placed in molds and hammered What is a modified proctor used in - ANS It is used in base, sub grade, MSE wall back fill materials Modified proctors are created how - ANS With a 10lb hammer(rammer) on a 18" drop with 56 blows per layers with 5 layers in total. What is a standard proctor used in - ANS It is used in embankment and structure back fill materials Standard proctors are created how - ANS With a 5.5lb hammer(rammer) on a 12" drop with 25 blows per layer with 3 layers in total Comparison between VT and QC density test tolerance - ANS 2 lbs/pcf What is the STRG - AN

Show more Read less
Institution
FDOT EARTHWORK
Course
FDOT EARTHWORK









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
FDOT EARTHWORK
Course
FDOT EARTHWORK

Document information

Uploaded on
May 27, 2025
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

FDOT EARTHWORK LEVEL 1 EXAM
2025 QUESTIONS AND ANSWERS




Basics covered in Level 1 - ANS Nuclear Testing
Speedy Moisture
Report Forms



Earthwork has to do with the roadway in what way? - ANS Earthwork is the excavation and
placement of soils and materials supporting the proposed roadway.



In Earthwork what is a lift? - ANS 6" of compacted depth at full width



In Earthwork what is a Lot? - ANS A lot is 1 lift at 500 ft or within compacted area. Isolated
compaction operations are separate lots.



Sampling at the roadway is done for - ANS Done for base, sub grade, and embankment.



Sampling is determined how - ANS generated with random numbers usually by a Verification
Inspector



What is important about sampling at the roadway - ANS Minimum of three representative
sample combined.




Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 1

, What is LIMS? - ANS Laboratory Info Management System



The proctor theory is when compaction is achieved how - ANS by inputting energy to expel
air and water in the soil voids



Compaction causes - ANS An increase in unit weight, decrease in compressibility and
permeability.



The proctor is determined where and creates what - ANS In a laboratory and establishes a
density standard to be used on the roadway



Lab proctors are created how - ANS Material is gathered from the road and prepared with
different amounts of water then placed in molds and hammered



What is a modified proctor used in - ANS It is used in base, sub grade, MSE wall back fill
materials



Modified proctors are created how - ANS With a 10lb hammer(rammer) on a 18" drop with
56 blows per layers with 5 layers in total.



What is a standard proctor used in - ANS It is used in embankment and structure back fill
materials



Standard proctors are created how - ANS With a 5.5lb hammer(rammer) on a 12" drop with
25 blows per layer with 3 layers in total



Comparison between VT and QC density test tolerance - ANS 2 lbs/pcf



What is the STRG - ANS Sampling, Testing, and Reporting Guide (state wide)

Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 2

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brightstars Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
192
Member since
1 year
Number of followers
7
Documents
12191
Last sold
2 days ago
VERIFIED EXAMS AND STUDY GUIDES.

Here, you will find Study Notes, Exam answer packs 100% Guarenteed success.

3.3

31 reviews

5
10
4
4
3
8
2
3
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions