100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

JAKES UNION PACIFIC TEST QUESTIONS & ANSWERS(RATED A+)

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
26-05-2025
Written in
2024/2025

On the engineer's previous start, the total trip time was 13 hours and 20 minutes. How much rest was required prior to this start? - ANSWER11 hours 20 minutes Once the crew receives their paperwork, what documents must be reviewed as part of the job briefing? - ANSWERSystem general orders, subdivision general orders, track warrants for bullitens and supt. Bullitens The 2 unit locomotive consist is shutdown and blue flagged. Can the crew start the locomotives while they are blue flagged? - ANSWERNo The conductor is on the leading end of the rear locomotive and instructs the engineer to back up 10 cars to clear the spring switch on the roundhouse lead. Do they need to communicate with the Roundhouse Supervisor before moving the locomotives and departing the facility? - ANSWERYes The Yardmaster tells the clears the lead, because there is a yard job that will pick up the car once the Local departs. How conductor to leave the car where it is located, as long as it physically should the conductor respond? - ANSWERShould respond with good faith Challenge, because it is Fouling the track What rules are covered by Good Faith Challenge? - ANSWERShoving movements , leaving equipment fouling at an adjacent track, and switches and derails The The Yardmaster instructs the crew to place the centerbeam flat car in track 3, but not to couple to the cut of cars in the track as they will be pulled from the west end later. What securement procedure should the crew use when leaving the single car in track 3?? - ANSWERApply hand break and observe movement for 1 minute What is required before the engineer can change direction to clear the roundhouse lead? - ANSWERMust switch by hand, and communicate with roundhouse supervisor Is any communication between the crew and the bedlam yardmaster required before they can occupy the east switching lead at bedlam for their movement towards the bowl tracks? - ANSWERDetermine if RCL Zone E is activated, contact yard master After departing the roundhouse, the crew heads east. After stopping, the conductor will be using hand signals while protecting the shoving movement (light power) westward towards the bowl lead. Is a radio job briefing required prior to initiating the movement? - ANSWERNo, after a clear understanding that hand signals will be used The Local crew will need to switch out their cars from bowl track 4. Is any protection required befo

Show more Read less
Institution
JAKES UNION PACIFIC
Course
JAKES UNION PACIFIC









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
JAKES UNION PACIFIC
Course
JAKES UNION PACIFIC

Document information

Uploaded on
May 26, 2025
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

JAKES UNION PACIFIC TEST
QUESTIONS & ANSWERS(RATED A+)
On the engineer's previous start, the total trip time was 13 hours and 20 minutes.
How much rest was required prior to this start? - ANSWER11 hours 20 minutes

Once the crew receives their paperwork, what documents must be reviewed as part
of the job briefing? - ANSWERSystem general orders, subdivision general orders,
track warrants for bullitens and supt. Bullitens

The 2 unit locomotive consist is shutdown and blue flagged. Can the crew start the
locomotives while they are blue flagged? - ANSWERNo

The conductor is on the leading end of the rear locomotive and instructs the engineer
to back up 10 cars to clear the spring switch on the roundhouse lead. Do they need
to communicate with the Roundhouse Supervisor before moving the locomotives and
departing the facility? - ANSWERYes

The Yardmaster tells the clears the lead, because there is a yard job that will pick up
the car once the Local departs. How conductor to leave the car where it is located,
as long as it physically should the conductor respond? - ANSWERShould respond
with good faith Challenge, because it is Fouling the track

What rules are covered by Good Faith Challenge? - ANSWERShoving movements ,
leaving equipment fouling at an adjacent track, and switches and derails

The The Yardmaster instructs the crew to place the centerbeam flat car in track 3,
but not to couple to the cut of cars in the track as they will be pulled from the west
end later. What securement procedure should the crew use when leaving the single
car in track 3?? - ANSWERApply hand break and observe movement for 1 minute


What is required before the engineer can change direction to clear the roundhouse
lead? - ANSWERMust switch by hand, and communicate with roundhouse
supervisor

Is any communication between the crew and the bedlam yardmaster required before
they can occupy the east switching lead at bedlam for their movement towards the
bowl tracks? - ANSWERDetermine if RCL Zone E is activated, contact yard master

After departing the roundhouse, the crew heads east. After stopping, the conductor
will be using hand signals while protecting the shoving movement (light power)
westward towards the bowl lead. Is a radio job briefing required prior to initiating the
movement? - ANSWERNo, after a clear understanding that hand signals will be used

The Local crew will need to switch out their cars from bowl track 4. Is any protection
required before fouling bowl track 4 during humping operations? - ANSWERThe

, crew must job brief the track being fouled, and request protection from the employee
controlling switches

The crew stops the movement on the switching lead to line the switch to bowl track
4. What is required before operating the switch? - ANSWERThe crew member
operating switch must use LISOPP

While coupling bowl track 4, the conductor discovers a misaligned drawbar. Will the
conductor need to establish "Red Zone Protection" to adjust the drawbar? -
ANSWERYes, must establish red zone protection

What other requirements, if any, need to be met before making the coupler
adjustment to the car? - ANSWERApply sufficent amount of hand breaks to prevent
moving, allow slack to adjust

After switching their cars, the crew pulls down for an air test. What air tests and
inspections, il any, will be required before departing Bedlam and proceeding to
Starkville and the Industrial Lead to complete their work? - ANSWERClass 1 air
brake test. Lsd and crack inspection

After completing a job briefing regarding the switching moves to be made, the
conductor requests "Red Zone Protection" through a face-to-face job briefing with
the engineer. What action is required by the engineer before the conductor can foul
the track? - ANSWERMust fully appy brakes and confirm red zone face to face, or
over radio

The conductor heads back to make the cut on the train. Before cutting away from the
rear portion, what securement proçedure should the crew use in the departure yard?
- ANSWERA minimum of 3 hand brakes followed by release test

The defective car that the crew will be setting out is a loaded centerbeam flat car that
is not equipped with horizontal handholds or two vertical handholds spaced shoulder
width apart. After clearing "Red Zone Protection" and cutting away, can the
conductor ride the rear platform of the centerbeam flat car while pulling out of the
track? - ANSWERYes

The conductor stops the pulling movement after clearing the switch for the lead
pocket. Can the conductor ride the side of the loaded centerbeam flat while
protecting the shoving movement into the lead pocket track? - ANSWERNO

After setting out the defective car and recoupling the train, what air tests, if any, will
be required? - ANSWERClass 3 air brake test

The crew notifies the Yardmaster that they are ready to depart. What authority will
they need to occupy the main track at the east end of Bedlam Yard and proceed
eastward? - ANSWERYard limits and track bulletins

The conductor asks the engineer if they can make a back up under Rule 6.6, instead
of walking up to the head end. How should the engineer respond? - ANSWERNot
permitted in yard limits

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
papersbyjol West Virginia
View profile
Follow You need to be logged in order to follow users or courses
Sold
421
Member since
2 year
Number of followers
253
Documents
13988
Last sold
3 weeks ago

3.8

72 reviews

5
27
4
18
3
17
2
2
1
8

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions