100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

SECOND CLASS BOILER LICENSES MINNESOTA QUESTIONS & ANSWERS 100% CORRECT!!

Beoordeling
-
Verkocht
-
Pagina's
4
Cijfer
A+
Geüpload op
26-05-2025
Geschreven in
2024/2025

Certificate of inspection - ANSWERmeans a sticker attached to the boiler or pressure vessel which documents the month and year of the inspection and the employer of the inspector performing the inspection. High-pressure boiler - ANSWERmeans a boiler operating at a steam or other vapor pressure in excess of 15 psig, or a water or other liquid boiler in which the pressure exceeds 160 psig or the temperature exceeds 250 degrees Fahrenheit. Inspection due date - ANSWERmeans the last possible date that the inspection can be completed within the time limits in this chapter Insurance company boiler inspector - ANSWERmeans a national board-commissioned inspector who holds a current certificate of competency issued by the state. Certificate of registration - ANSWERmeans a document that has been made available on the department's Web site that lists all registered boilers and pressure vessels at a location, including the last inspection date, the certificate expiration date, and the maximum allowable working pressure for each boiler or pressure vessel. Low-pressure boiler - ANSWERmeans a boiler operating at a steam or other vapor pressure of 15 psig or less, or a water or other liquid boiler in which the pressure does not exceed 160 psig and the temperature does not exceed 250 degrees Fahrenheit. National board - ANSWERmeans the National Board of Boiler and Pressure Vessel Inspectors, which is an organization comprised of chief Inspectors for the states, cities, and territories of the United States and provinces and territories of Canada National Board Inspection Code; NBIC - ANSWERmeans a three-part technical document that is written and published by the national board detailing the installation, inspection, and repair of boilers and pressure vessels. Operation - ANSWERmeans the on-site act of manipulating, monitoring, and testing of boilers and their appurtenances by a properly licensed engineer or an apprentice under the direct supervision of the properly licensed engineer. Psig - ANSWERpounds per square inch gauge

Meer zien Lees minder
Instelling
SECOND CLASS BOILER LICENSES MINNESOTA
Vak
SECOND CLASS BOILER LICENSES MINNESOTA








Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
SECOND CLASS BOILER LICENSES MINNESOTA
Vak
SECOND CLASS BOILER LICENSES MINNESOTA

Documentinformatie

Geüpload op
26 mei 2025
Aantal pagina's
4
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

SECOND CLASS BOILER LICENSES
MINNESOTA QUESTIONS & ANSWERS
100% CORRECT!!
Certificate of inspection - ANSWERmeans a sticker attached to the boiler or
pressure vessel which documents the month and year of the inspection and the
employer of the inspector performing the inspection.

High-pressure boiler - ANSWERmeans a boiler operating at a steam or other vapor
pressure in excess of 15 psig, or a water or other liquid boiler in which the pressure
exceeds 160 psig or the temperature exceeds 250 degrees Fahrenheit.

Inspection due date - ANSWERmeans the last possible date that the inspection can
be completed within the time limits in this chapter

Insurance company boiler inspector - ANSWERmeans a national board-
commissioned inspector who holds a current certificate of competency issued by the
state.

Certificate of registration - ANSWERmeans a document that has been made
available on the department's Web site that lists all registered boilers and pressure
vessels at a location, including the last inspection date, the certificate expiration
date, and the maximum allowable working pressure for each boiler or pressure
vessel.


Low-pressure boiler - ANSWERmeans a boiler operating at a steam or other vapor
pressure of 15 psig or less, or a water or other liquid boiler in which the pressure
does not exceed 160 psig and the temperature does not exceed 250 degrees
Fahrenheit.

National board - ANSWERmeans the National Board of Boiler and Pressure Vessel
Inspectors, which is an organization comprised of chief Inspectors for the states,
cities, and territories of the United States and provinces and territories of Canada

National Board Inspection Code; NBIC - ANSWERmeans a three-part technical
document that is written and published by the national board detailing the
installation, inspection, and repair of boilers and pressure vessels.

Operation - ANSWERmeans the on-site act of manipulating, monitoring, and testing
of boilers and their appurtenances by a properly licensed engineer or an apprentice
under the direct supervision of the properly licensed engineer.

Psig - ANSWERpounds per square inch gauge

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
papersbyjol West Virginia
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
421
Lid sinds
3 jaar
Aantal volgers
253
Documenten
14048
Laatst verkocht
1 maand geleden

3.8

72 beoordelingen

5
27
4
18
3
17
2
2
1
8

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen