Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 2 van de 5 pagina's
Tentamen (uitwerkingen)

BOILER SET NUMBER 2 - SPECIAL ENGINEER QUESTIONS & ANSWERS(RATED A+)

Document preview thumbnail
Voorbeeld 2 van de 5 pagina's

National Board Inspection Code (NBIC) - ANSWERMeans a three part technical document that is written and published by the national board detailing the installation, inspection, and repair of boilers and Pressure vessels. Chief Engineer Grade A - ANSWERAn Individual seeking licensure, shall be 18 years of age, and shall have 2 years experience in operation. Using an Economizer for every ___ degree increase in FW temp, there is a ___% increase in efficiency. - ANSWER10 degree 1% PSIG - ANSWERPounds Per Square Inch Gauge. Remote Monitoring - ANSWERMeans the act of viewing or overseeing the boiler or boiler plant operating parameters and conditions from a remote location. Special Engineer (B) - ANSWERWho is at least 16 years old but less than 18 years old, not more than 50 horsepower, not more than 100 horsepower, appetence. Special Engineer (A) . - ANSWERShall be at least 18 years of age, not more than 50 horsepower or to operate shift engineer in a plant of not more than 100 horse power, an apprentice. Second Class Engineer Grade C - ANSWERShall be at least 18 years of age, not more than 100 horsepower, Low- Pressure plant of not more than 500 horsepower, 1 year of actual experience. Second Class Engineer Grade B. - ANSWERShall be 18 year old, not more than 100 horsepower, or operates as sift engineer in a plant of not more than 500 horsepower, At least 1 year of experience. Second Class Engineer Grade A - ANSWERShall be 18 years of age, not more than 100 horsepower or to operate as a shift engineer in a plant of not more than 500 horsepower. At least 1 year of actual Experience. First Class Engineer Grade C - ANSWERShall be 18 years old, their appurtenances of not more than 500 horsepower, at least 3 years of actual experience. First Class Engineer Grade B - ANSWERShall be 18 years old, no more than 500 horsepower, at least 3 years of experience. First Class Engineer Grade A - ANSWERShall be 18 years old, not more than 500 hors

Voorbeeld van de inhoud

BOILER SET NUMBER 2 - SPECIAL
ENGINEER QUESTIONS &
ANSWERS(RATED A+)
National Board Inspection Code (NBIC) - ANSWERMeans a three part technical
document that is written and published by the national board detailing the
installation, inspection, and repair of boilers and Pressure vessels.

Chief Engineer Grade A - ANSWERAn Individual seeking licensure, shall be 18
years of age, and shall have 2 years experience in operation.

Using an Economizer for every ___ degree increase in FW temp, there is a ___%
increase in efficiency. - ANSWER10 degree 1%

PSIG - ANSWERPounds Per Square Inch Gauge.

Remote Monitoring - ANSWERMeans the act of viewing or overseeing the boiler or
boiler plant operating parameters and conditions from a remote location.

Special Engineer (B) - ANSWERWho is at least 16 years old but less than 18 years
old, not more than 50 horsepower, not more than 100 horsepower, appetence.

Special Engineer (A) . - ANSWERShall be at least 18 years of age, not more than 50
horsepower or to operate shift engineer in a plant of not more than 100 horse power,
an apprentice.

Second Class Engineer Grade C - ANSWERShall be at least 18 years of age, not
more than 100 horsepower, Low- Pressure plant of not more than 500 horsepower, 1
year of actual experience.

Second Class Engineer Grade B. - ANSWERShall be 18 year old, not more than 100
horsepower, or operates as sift engineer in a plant of not more than 500 horsepower,
At least 1 year of experience.

Second Class Engineer Grade A - ANSWERShall be 18 years of age, not more than
100 horsepower or to operate as a shift engineer in a plant of not more than 500
horsepower. At least 1 year of actual Experience.

First Class Engineer Grade C - ANSWERShall be 18 years old, their appurtenances
of not more than 500 horsepower, at least 3 years of actual experience.

First Class Engineer Grade B - ANSWERShall be 18 years old, no more than 500
horsepower, at least 3 years of experience.

First Class Engineer Grade A - ANSWERShall be 18 years old, not more than 500
horsepower, 2 years of experience.

, Chief Engineer Grade C - ANSWERAn individual seeking license, shall be 18 years
old, shall have 5 years of experience.

Chief Engineer Grade B. - ANSWERIndividual seeking licensure, shall be at least 18
years old of age, and at least 5 years of actual experience.


Repair - ANSWERMeans the work necessary to restore a boiler or pressure vessel
to a safe and satisfactory operation condition, as defined in National Board
inspection code,
(part 3, section 9.)

Low - Pressure Boiler - ANSWERa steam or vapor pressure of 15 psig or less, or a
water or other liquids boiler in which the pressure does not exceed 160 psig, and
temp does not exceed 250 degrees.

Inspection Due Date - ANSWERMeans the last possible date that the inspection can
be completed within the time limits in this chapter.

High- Pressure Boiler - ANSWERA boiler operating at a steam or vapor pressure I
excess of 15 PSIG, water or other liquids excessed 160 PSIG, and excessed 250
degrees.

The letter M = ____ - ANSWER1000

Soot blower are more often found on _______ boilers. - ANSWERFire Tube

A boilers MAWP is ____ - ANSWERStamped on manufactures tag, stamped on
boiler Schell.

What can affect the output of a boiler? - ANSWERInlet air temp, feed water temp,
HS scale.

Minnesota's operators license are renewed every ____? - ANSWERYear

A High Pressure Boiler can be used to in a low pressure situation: ____ -
ANSWERSometimes

The Water Column should be blown down _____ - ANSWERonce a day.

An HRT Boiler is a ___ pass Boiler. - ANSWER2

A _____ valve offers the least resistance to flow. - ANSWERGate

ASME Requires that safety valves be tested ____. - ANSWERonce a month

Manholes are provided in boilers for ____ purpose. - ANSWERRepair, Inspection,
Cleaning.

Documentinformatie

Geüpload op
26 mei 2025
Aantal pagina's
5
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
$15.49

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
papersbyjol
3.8
(79)
Verkocht
450
Volgers
254
Items
14160
Laatst verkocht
1 week geleden



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen