CWEA E/I 2 EXAM/ACTUAL
QUESTIONS WITH CORRECT
ANSWERS/NEWEST UPDATE
2025/GRADE A+ ASSURED
Save
Get a taste for our practice questions
Learn
Studied 7 terms
Nice work, you're crushing it
Continue studying in Learn
Terms in this set (141)
,Receiving job b. job preparation
instruction and
planning
equipment use
are part of:
a. craft data.
b. job
preparation.
c. work factors.
d. leveled time.
Anticipating other c sharply reduces the number
tasks or of emergencies
problems:
a. usually creates
additional
problems.
b. wastes time.
c. sharply
reduces the
number
of emergencies.
d. often is not
worth the effort.
,Making job b improves productivity
planning a group
effort:
a. wastes time.
b. improves
productivity.
c. causes
confusion.
d. All the above
Rubber safety a Every 12 months
gloves should be
tested how
often?
a Every 12 months
b. Every 9 months
c. Every 6 months
d. Every 4 months
, Rubber safety b Every 9 months
blankets should
be tested how
often?
a. Every 6 months
b. Every 9 months
c. Every 12
months
d. Every 18
months
What is the b 5 MA
interrupting
current of a GFIC
receptacle?
a. 20 VAL
b. 5 MA
c. 10 UDL
d. 20 MA
QUESTIONS WITH CORRECT
ANSWERS/NEWEST UPDATE
2025/GRADE A+ ASSURED
Save
Get a taste for our practice questions
Learn
Studied 7 terms
Nice work, you're crushing it
Continue studying in Learn
Terms in this set (141)
,Receiving job b. job preparation
instruction and
planning
equipment use
are part of:
a. craft data.
b. job
preparation.
c. work factors.
d. leveled time.
Anticipating other c sharply reduces the number
tasks or of emergencies
problems:
a. usually creates
additional
problems.
b. wastes time.
c. sharply
reduces the
number
of emergencies.
d. often is not
worth the effort.
,Making job b improves productivity
planning a group
effort:
a. wastes time.
b. improves
productivity.
c. causes
confusion.
d. All the above
Rubber safety a Every 12 months
gloves should be
tested how
often?
a Every 12 months
b. Every 9 months
c. Every 6 months
d. Every 4 months
, Rubber safety b Every 9 months
blankets should
be tested how
often?
a. Every 6 months
b. Every 9 months
c. Every 12
months
d. Every 18
months
What is the b 5 MA
interrupting
current of a GFIC
receptacle?
a. 20 VAL
b. 5 MA
c. 10 UDL
d. 20 MA