According to the owner or owners agent. 2009 IBC
IBC, the "blank" Section 1704.1
is to hire the
special
inspector.
,According to the code official. 2009 IBC, Section
IBC, the "blank" 1704.1
is the
responsible for
the approval of a
person's
qualifications to
act as a special
inspector.
According to the final report. 2009 IBC,
IBC, discrepancy Section1704.1.2
corrections are
made known to
the building
official by:
When is the If it is not corrected by the
code official to contractor. 2009 IBC, Section
be made aware 1704.1.2
of a discrepancy
found during a
special
inspection?
,According to the In a written report - Section II B 4 -
Model Program Model Programs
for Special
Inspection, the
special inspector
is to document
work that is
nonconforming:
According to the After each inspection visit - Section
Model Program II B 5 - Model Programs
for Special
Inspection, the
special inspector
is to prepare
written report of
inspection:
, According to the Description of discussions with the
Model Program contractor - Section B 5 - Model
for Special Programs
Inspection,
which of the
following items
does not need
to be included in
each inspection
report?
According to the 1/16 inch - Specification for
Specification for Structural Joints Table 3.1
Structural Joints
using high
strength bolts,
the nominal
diameter of
standard bolt
holes shall be
how much larger
than the nominal
bolt diameter?
QUESTIONS AND CORRECT
ANSWERS | GRADED A+ | VERIFIED
ANSWERS | LATEST VERSION (JUST
RELEASED)
Save
Terms in this set (146)
According to the owner or owners agent. 2009 IBC
IBC, the "blank" Section 1704.1
is to hire the
special
inspector.
,According to the code official. 2009 IBC, Section
IBC, the "blank" 1704.1
is the
responsible for
the approval of a
person's
qualifications to
act as a special
inspector.
According to the final report. 2009 IBC,
IBC, discrepancy Section1704.1.2
corrections are
made known to
the building
official by:
When is the If it is not corrected by the
code official to contractor. 2009 IBC, Section
be made aware 1704.1.2
of a discrepancy
found during a
special
inspection?
,According to the In a written report - Section II B 4 -
Model Program Model Programs
for Special
Inspection, the
special inspector
is to document
work that is
nonconforming:
According to the After each inspection visit - Section
Model Program II B 5 - Model Programs
for Special
Inspection, the
special inspector
is to prepare
written report of
inspection:
, According to the Description of discussions with the
Model Program contractor - Section B 5 - Model
for Special Programs
Inspection,
which of the
following items
does not need
to be included in
each inspection
report?
According to the 1/16 inch - Specification for
Specification for Structural Joints Table 3.1
Structural Joints
using high
strength bolts,
the nominal
diameter of
standard bolt
holes shall be
how much larger
than the nominal
bolt diameter?