Certified Construction Manager Study Set
ACTUAL EXAM 2025 TEST COMPREHENSIVE
QUESTIONS AND VERIFIED ANSWERS
(DETAILED & ELABORATED) 100% SOLVED
2025!!
Save
Terms in this set (65)
The practice of professional management applied
Construction to the planing, design, and construction of projects,
Management from inception to completion, for the purpose of
controlling time, cost, and quality
To control: time, cost, quality, information flow and
Construction Contract
to satisfy the Owner's goals and objectives for the
Administration Objectives
project
Widely applicable, understandable, owner retains
Design Bid Build
control, owner "knows" the cost prior to the start of
Advantages
Construction
Relatively slow, owner is liable for the design,
Design Bid Build
constructability issues, adversarial relationships
Disadvantages
fostered
Increased Owner control, work easily fast-tracked,
Multiple Prime
save general contractor markups, some states
Advantages
require it
https://quizlet.com/1042205455/certified-construction-manager-study-set-actual-exam-2025-test-comprehensive-questions-and-verified-answers… 1/12
, 5/10/25, 1:38 PM Certified Construction Manager Study Set ACTUAL EXAM 2025 TEST COMPREHENSIVE QUESTIONS AND VERIFIED ANS…
Owner has risk of controlling time and coordination,
Multiple Prime multiple accountability for performance, unknown
Disadvantages "final" cost at construction start, same owner risks as
traditional approach
Well-suited for fast-tracking, contractor (and
CM at Risk Advantags subcontractor) input on design alternatives, better
cost info, permits "picking" of the builder
Change of CM's accountability after, GMP
(guaranteed maximum price) is signed, tempted to
CM at Risk Disadvantages
sign GMP "too soon", variations in procurement
methods
Accountability for project delivery, reduced
disputes, can cut time and cost, builder can have
Design-Build Advantages
input to design/constructabibility, budget
established early on
Early definition of the program required, owner's
Design-Build
loss of control during design, potential for quality to
Disadvantages
be compromised
delivery methods are the forms of organizing the
What is True concerning
construction project, all delivery methods have
delivery methods?
dissimilar risks
What delivery method Design-Build
can reduce and cut time
the most when compared
to other methods?
What delivery method CM at Risk and Design-Build
allows the contractor(s)
to provide input on
design alternatives?
With this delivery Multiple Prime
method, the owner holds
contracts with the
designer and several
contractors. The CM
assists in scheduling the
contractors.