ATS
5 Pillars of Readiness - ANS -Personnel
Equipment
Supply
Training
Ordnance
\5 steps of ORM - ANS -Identify hazards
Assess the risks
Make risk decisions
Implement controls
Supervise
\Abbreviated Basic Phase - ANS -
\ADMIN - ANS -Administrative assessment event that will focus on Afloat Self Assessments
\Advance Phase - ANS -Progress individual unit warfare skill set through multi-unit tactical warfare training
\AE - ANS -Advanced Exercises conducted post Basic Phase
\Assessment - ANS -Prove application of received training
\ASTAC - ANS -Anti-Submarine Tactical Air Controller
\ATG responsibilities - ANS -Executive agent for training and assessment
\ATG Training Methodology - ANS -Educate
Train
Assess
Certify
\Availability Concurrent TSRA - ANS -Conducted during CNO Availability. Assess material condition if tanks and voids,
structures and equipment required for contractor Sea Trials.
\Availability Phase? - ANS -Material foundation to support Basic Phase. Start of CNO availability.
\AVCERT - ANS -Aviation Facilities Cerification
, \AWP Development - ANS -To identify CNO availability requirements.
\Basic Phase - ANS -Train and certify a ship in all mission area's and perform as an individual unit.
\BMD - ANS -Ballistic Missile Defense
\C5RA - ANS -Combat Systems Command, Control, Computers, and Communications Readiness Assessment
\Categories of hazard severity - ANS -CAT I - May cause death, loss of asset or grave damage
CAT II - May cause severe injury
CAT III - May cause minor injury
CAT IV - Presents minimal threat
\CE - ANS -Certification events completed during Basic Phase
\CERTEX - ANS -Certification for ARG/MEU
\Certification - ANS -
\Certification Validation - ANS -Assessment event done to validate/extend current certifications when a ship cannot
conduct a full training phase due to operational schedule
\CMAV - ANS -Continuing Maintenance Availability
\CMTQ - ANS -Cruise Missile Tactical Qualification
\CNSP/CNSL responsibilities - ANS -Overall management of Naval Surface Force Training, Policy, Procedures, and
Requirements
\CO must sign these signing 90 days of assuming command. - ANS -Battle Orders, Standing Orders, Navigation Bill,
Force Protection In-Port Security Plan, Temporary Standing Orders, Deranged/ Damage Equipment Bill
\Commanding Officer responsibilities - ANS -Ensures the development of a viable shipboard training program
\COMPUTEX - ANS -Composite Training Unit Exercise
\CRAV - ANS -Command Readiness Assessment Visit
\CSOSS - ANS -Combat System Operational Sequencing System
\EOSS - ANS -Engineering Operational Sequencing System
\EWTG - ANS -Expeditionary Warfare Training Group
\FRP Milestones - ANS --Basic Phase Completion
-Deployment Certification
\FRTP is aligned with what and how long? - ANS -With Optimized Fleet Response Plan (OFRP) and notionally 36 months
\Group Tactical - ANS -To integrate into ESG/CSG and prepare for deployment
5 Pillars of Readiness - ANS -Personnel
Equipment
Supply
Training
Ordnance
\5 steps of ORM - ANS -Identify hazards
Assess the risks
Make risk decisions
Implement controls
Supervise
\Abbreviated Basic Phase - ANS -
\ADMIN - ANS -Administrative assessment event that will focus on Afloat Self Assessments
\Advance Phase - ANS -Progress individual unit warfare skill set through multi-unit tactical warfare training
\AE - ANS -Advanced Exercises conducted post Basic Phase
\Assessment - ANS -Prove application of received training
\ASTAC - ANS -Anti-Submarine Tactical Air Controller
\ATG responsibilities - ANS -Executive agent for training and assessment
\ATG Training Methodology - ANS -Educate
Train
Assess
Certify
\Availability Concurrent TSRA - ANS -Conducted during CNO Availability. Assess material condition if tanks and voids,
structures and equipment required for contractor Sea Trials.
\Availability Phase? - ANS -Material foundation to support Basic Phase. Start of CNO availability.
\AVCERT - ANS -Aviation Facilities Cerification
, \AWP Development - ANS -To identify CNO availability requirements.
\Basic Phase - ANS -Train and certify a ship in all mission area's and perform as an individual unit.
\BMD - ANS -Ballistic Missile Defense
\C5RA - ANS -Combat Systems Command, Control, Computers, and Communications Readiness Assessment
\Categories of hazard severity - ANS -CAT I - May cause death, loss of asset or grave damage
CAT II - May cause severe injury
CAT III - May cause minor injury
CAT IV - Presents minimal threat
\CE - ANS -Certification events completed during Basic Phase
\CERTEX - ANS -Certification for ARG/MEU
\Certification - ANS -
\Certification Validation - ANS -Assessment event done to validate/extend current certifications when a ship cannot
conduct a full training phase due to operational schedule
\CMAV - ANS -Continuing Maintenance Availability
\CMTQ - ANS -Cruise Missile Tactical Qualification
\CNSP/CNSL responsibilities - ANS -Overall management of Naval Surface Force Training, Policy, Procedures, and
Requirements
\CO must sign these signing 90 days of assuming command. - ANS -Battle Orders, Standing Orders, Navigation Bill,
Force Protection In-Port Security Plan, Temporary Standing Orders, Deranged/ Damage Equipment Bill
\Commanding Officer responsibilities - ANS -Ensures the development of a viable shipboard training program
\COMPUTEX - ANS -Composite Training Unit Exercise
\CRAV - ANS -Command Readiness Assessment Visit
\CSOSS - ANS -Combat System Operational Sequencing System
\EOSS - ANS -Engineering Operational Sequencing System
\EWTG - ANS -Expeditionary Warfare Training Group
\FRP Milestones - ANS --Basic Phase Completion
-Deployment Certification
\FRTP is aligned with what and how long? - ANS -With Optimized Fleet Response Plan (OFRP) and notionally 36 months
\Group Tactical - ANS -To integrate into ESG/CSG and prepare for deployment