ASTM D75 QUESTIONS AND ANSWERS
D75
When sampling from the conveyor belt, obtain at least _____ approximately equal
increments selected at random. - Answers :Three (Section 5.3.2)

D75
True or False? When sampling from the conveyor belt, stop the conveyor belt while the
sample increments are being obtained. - Answers :True (Section 5.3.2)

D75
For combined coarse and fine aggregates, the minimum weight shall be coarse
aggregate minimum mass plus _____. - Answers :10 kg. (Table 1, page 6, Note B)

D75
True or False? When site-specific techniques or procedures are developed for sampling
stockpile, those procedures shall not supersede the procedures given in ASTM D75. -
Answers :False (Section 5.3.3)

D75
True or False? Always sample coarse aggregate or mixed coarse and fine aggregate
from stockpiles whenever possible, particularly when the sampling is done for the
purpose of determining aggregate properties that may be dependent upon the grading
of the sample. - Answers :False; avoid sampling (Section 5.3.3)

D75
When sampling from a flowing aggregate stream (bins or belt discharge), obtain at least
______ approximately equal increments, selected at random from the unit being
samples, and combine to form a field sample. - Answers :3 (Section 5.3.1)

Nominal maximum aggregate size (Superpave) - Answers :one size larger than the first
sieve that retains more than 10% aggregate

Maximum aggregate size (Superpave) - Answers :one size larger than the nominal
maximum aggregate size

D75
Samples for preliminary investigation tests are obtained by what party? - Answers :the
party responsible for development of the potential source

D75
Samples of materials for control of the production at the source or control of the work at
the site of use are obtained by whom? - Answers :the manufacturer, contractor, or other
parties responsible for accomplishing the work

D75

, Samples for tests to be used in acceptance or rejection decisions by the purchaser are
obtained by? - Answers :the purchaser or his authorized representative

D75
The _____ shall provide suitable equipment needed for proper inspection and sampling.
- Answers :Seller

D75
This practice covers sampling of coarse and fine aggregate for what purposes? -
Answers :preliminary investigation of the potential source of supply; control of the
product at the source of supply; control of the operation at the site of use; acceptance or
rejection of the materials

D75
What is the smallest sieve opening through which the entire amount of aggregate is
required to pass called? - Answers :Maximum size (of aggregate)

D75
What is the smallest sieve opening through which the entire amount of the aggregate is
permitted to pass called? - Answers :Nominal maximum size (of aggregate)

D75
What is the preferred method of sampling? - Answers :Sampling from stockpiles with
Power equipment. (Section 5.3.3.1)

D75
When obtaining a sample from a stockpile, a loader shall enter the stockpile with the
bucket approximately ____ above ground level. - Answers :150 mm [6 in.] (Section
5.3.3.1 (1) )

D75
What must the loader never do when gathering a sample from a stockplie? - Answers
:Never allowing the front tires to ramp up on the pile. (Section 5.3.3.1 (1) )

D75
What must be done after re-blending and creating a small sampling pile at the base of
the stockpile. - Answers :Without the tires entering the pile, lower the bucket to about
half the height of the pile and backup, making a flat surface for sampling. (Section
5.3.3.1 (4) )

D75
Samples for tests to be used in acceptance or rejection decisions by the purchaser are
obtained by the _____ or his _____ ______. - Answers :purchaser; authorized
representative (Section 4.2)

D75

Geschreven voor

Instelling
ASTM D75
Vak
ASTM D75

Documentinformatie

Geüpload op
5 mei 2025
Aantal pagina's
5
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
GEEKA YALA UNIVERSITY
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2046
Lid sinds
4 jaar
Aantal volgers
1446
Documenten
50918
Laatst verkocht
1 dag geleden

3.8

352 beoordelingen

5
177
4
61
3
45
2
16
1
53

Populaire documenten

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen