Questions and Answers 100% Pass
If a building includes a multiple-zone recirculating system and the project team wants
to increase ventilation for IEQ Credit Enhanced IAQ Strategies, which action will likely
need to occur? - ✔✔Increasing the required outdoor air intake for the system by more
than 30%
Flow rate calculation - ✔✔(gallons per cycle x 60 seconds) / cycle duration (seconds) =
flow rate
In a goal-setting workshop, which info should be documented for IP Credit Integrative
Process? - ✔✔OPR and BOD
-For this credit the analysis done is used to inform the OPR and BOD. The OPR is used
to create the BOD
A retail project is determining the best quality lighting to help showcase products for
sale. What will be required of the project to achieve Lighting Quality for EQ Credit
Interior Lighting? - ✔✔Provide controls in sales areas that can reduce ambient lighting
to a midlevel.
Two things are additionally required for retail projects:
-For at least 90% of the individual occupant spaces in office and administrative areas,
provide individual lighting controls.
COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 1
, -In sales areas, provide controls that can reduce the ambient light levels to a midlevel
(30% to 70% of the max illumination level not including daylight contributions)
How can a project team avoid errors and expenses in LEED documentation prior to
submitting the project for review? - ✔✔Proofreading, checking numerical values (FTE,
site area, etc.) are consistent across credits, and checking the application for
completeness all cuts down on errors and additional expenses
What design decisions will help a project earn points under the prescriptive path of EA
Credit Optimize Energy Performance? - ✔✔-Install occupancy sensors for at least 75%
of the connected lighting load (1 pt for Interior Lighting Controls)
-Comply with the recommendations in the appropriate ASHRAE 50% Advanced
Energy Design Guide for all vertical fenestration (2 pts for Building Envelope, Glazing)
When designing for flexibility, project teams should focus on the portions of the project
typically subject to change, which include all of the following... - ✔✔The credit focuses
on the space plan, services, and movable items
Which simulations must be performed if a project team wants to achieve the most
points for EQ Credit Daylight? - ✔✔Two simulations are performed for Option 1 that
can earn up to 3 points for the credit: sDA and ASE
A product will count toward the achievement of MR Credit BD&O-Sourcing of Raw
Material in all EXCEPT: - ✔✔The report is published no less than 12 months prior to the
substantial completion of the project
Does count:
-The report covers a period that ends within one year of the project's registration date
-The report is published within 1 year of the project's LEED registration date
-The report is current for the product at the time of installation