100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

MNO2603 Assignment 3 Semester 1 Memo | Due 30 April 2025

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
25-04-2025
Written in
2024/2025

MNO2603 Assignment 3 Semester 1 Memo | Due 30 April 2025. All questions fully answered. The Bank of Lisbon Building Fire: Revealing Safety Flaws and Urging Improved Fire Protection The Bank of Lisbon Building Fire occurred on September 5, 2018, in Johannesburg, South Africa. Several government agencies, notably the Departments of Health, Human Settlements, and Cooperative Governance and Traditional Affairs, were based in the city centre building. The building's 23rd floor was where the fire first started, and it swiftly spread to other stories, devouring them all. To put out the fire and get the building out of the way, firefighters were called to the scene. Tragically, while tackling the fire, three firefighters passed away. The incident exposed several safety issues and weaknesses in the Bank of Lisbon building. It was discovered that the structure lacked sufficient fire detection, suppression, and alarm systems, including sprinklers, fire extinguishers, and fire alarms. Inadequate evacuation protocols, clogged stairwells, and defective emergency exits were also mentioned. The Bank of Lisbon building fire revealed violations of safety standards and sparked worries about the general level of fire safety in governmental structures. The tragedy sparked investigations into the safety norms and procedures used in several South African government owned buildings. Exactly what started the 2018 Bank of Lisbon Building Fire in Johannesburg was determined to be an electrical fault. The electrical supply room on one of the top storeys of the structure is where, according to sources, the fire first broke out. It is important to keep in mind that electrical problems can occur for a variety of reasons, such as defective wiring, overloaded circuits, damaged equipment, and inadequate maintenance. The electrical fault's presence, along with the building's defects and weaknesses in terms of safety, aided in the fire's rapid spread and ferocity. Early identification and containment of the fire were hampered by a lack of sufficient fire prevention and suppression systems, such as fire alarms, sprinklers, and fire extinguishers. Insufficient emergency exits and blocked stairwells also impeded the evacuation process, making it challenging for occupants and firefighters to escape the building safely. The Bank of Lisbon Building Fire served as a sobering reminder of the need for adequate electrical upkeep, compliance with safety laws, and the requirement for extensive fire protection systems in commercial buildings. The importance of routine inspections, prompt repairs, and adherence to electrical safety regulations was underlined to avoid such tragedies and reduce the hazards associated with fires. Following the incident, emphasis was placed on enhancing safety procedures, guaranteeing adherence to fire safety laws, and enacting stronger building codes for government buildings. The tragedy served as a reminder to the authorities that the protection of occupants and first responders in public buildings should be prioritised, and that strict fire safety standards must be implemented. Question 1 1. What was the primary cause of the Bank of Lisbon Building Fire? Question 2 2. Explain how you think this could have contributed to the rapid spread of the fire. Identify and explain any three factors that leads to the spread of fires in buildings using the information from the case study. Question 3 3. Identify at least four safety violations in the building that worsened the impact of the fire. Question 4 4. How did the lack of fire suppression and detection systems affect the response to the fire? Question 5 5. What challenges did firefighters and occupants face during evacuation? Question 6 6. How could these challenges have been prevented or addressed? Question 7 7. We often read of many instances where fires have erupted in buildings and the occupants have to be evacuated as quickly as possible in an effort to prevent injury and loss of life via means of egress. Explain the means of egress when it is necessary to move people out of a building as quickly and safely as possible. Question 8 8. Provide recommendations on fire prevention strategies that should be taken into account to prevent office fires.

Show more Read less
Institution
Course









Whoops! We can’t load your doc right now. Try again or contact support.

Connected book

Written for

Institution
Course

Document information

Uploaded on
April 25, 2025
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

, PLEASE USE THIS DOCUMENT AS A GUIDE TO ANSWER YOUR ASSIGNMENT

The Bank of Lisbon Building Fire: Revealing Safety Flaws and Urging Improved Fire Protection

The Bank of Lisbon Building Fire occurred on September 5, 2018, in Johannesburg, South Africa.
Several government agencies, notably the Departments of Health, Human Settlements, and
Cooperative Governance and Traditional Affairs, were based in the city centre building. The building's
23rd floor was where the fire first started, and it swiftly spread to other stories, devouring them all. To
put out the fire and get the building out of the way, firefighters were called to the scene. Tragically,
while tackling the fire, three firefighters passed away.

The incident exposed several safety issues and weaknesses in the Bank of Lisbon building. It
was discovered that the structure lacked sufficient fire detection, suppression, and alarm systems,
including sprinklers, fire extinguishers, and fire alarms. Inadequate evacuation protocols, clogged
stairwells, and defective emergency exits were also mentioned. The Bank of Lisbon building fire
revealed violations of safety standards and sparked worries about the general level of fire safety in
governmental structures. The tragedy sparked investigations into the safety norms and procedures used
in several South African government owned buildings.

Exactly what started the 2018 Bank of Lisbon Building Fire in Johannesburg was determined to be an
electrical fault. The electrical supply room on one of the top storeys of the structure is where,
according to sources, the fire first broke out. It is important to keep in mind that electrical problems
can occur for a variety of reasons, such as defective wiring, overloaded circuits, damaged equipment,
and inadequate maintenance.

The electrical fault's presence, along with the building's defects and weaknesses in terms of safety,
aided in the fire's rapid spread and ferocity. Early identification and containment of the fire were
hampered by a lack of sufficient fire prevention and suppression systems, such as fire alarms,
sprinklers, and fire extinguishers. Insufficient emergency exits and blocked stairwells also impeded the
evacuation process, making it challenging for occupants and firefighters to escape the building safely.

The Bank of Lisbon Building Fire served as a sobering reminder of the need for adequate electrical
upkeep, compliance with safety laws, and the requirement for extensive fire protection systems in
commercial buildings. The importance of routine inspections, prompt repairs, and adherence to
electrical safety regulations was underlined to avoid such tragedies and reduce the hazards associated
with fires.

Following the incident, emphasis was placed on enhancing safety procedures, guaranteeing adherence
to fire safety laws, and enacting stronger building codes for government buildings. The tragedy served
as a reminder to the authorities that the protection of occupants and first responders in public buildings
should be prioritised, and that strict fire safety standards must be implemented.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Aimark94 University of South Africa (Unisa)
Follow You need to be logged in order to follow users or courses
Sold
6575
Member since
6 year
Number of followers
3168
Documents
1326
Last sold
3 weeks ago
Simple & Affordable Study Materials

Study Packs & Assignments

4.2

520 reviews

5
277
4
124
3
74
2
14
1
31

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions