What makes up a quality asphalt mixture? - CORRECT ANSWER - A quality asphalt
mixture is determined by the constructability, if it conforms to Specifications, and if it satisfies
functional requirements.
CQC - CORRECT ANSWER - contractor quality control
Superpave - CORRECT ANSWER - Asphalt mix design system since 1998
QCP - CORRECT ANSWER - Quality control plan
QCM - CORRECT ANSWER - Quality control Manual
QC - CORRECT ANSWER - Quality Control (Contracting Testing and Inspection)
VT - CORRECT ANSWER - Verification Testing (FDOT or CEI Verification)
CEI - CORRECT ANSWER - Construction Engineering and Inspection
RT - CORRECT ANSWER - Resolution Testing (FDOT)
IV - CORRECT ANSWER - Independent Verification Testing
IA - CORRECT ANSWER - Independent Assurance Testing
, The decision-making authority on a job needs to be given to who? - CORRECT
ANSWER - Needs to be given to the level closet to the work as specified in the
specifications. It ensure a quick handle on situations and issues.
The governing order of project documents from high (1) to low (7) starts with the highest being -
CORRECT ANSWER - Special Provisions
The governing order of project documents from high to low (2) - CORRECT ANSWER -
Technical Special Provisions
The governing order of project documents from high to low (3) - CORRECT ANSWER -
Plans
The governing order of project documents from high to low (4) - CORRECT ANSWER -
Road design, structures, and traffic operations standards
The governing order of project documents from high to low (5) - CORRECT ANSWER -
Developmental Specifications
The governing order of project documents from high to low (6) - CORRECT ANSWER -
Supplemental Specifications
The governing order of project documents from high to low (7) - CORRECT ANSWER -
Standard Specifications
What are the key components in a pre-paving conferences? - CORRECT ANSWER - Key
Personnel (Paving superintendent)
Contractor Input
Agency Input
QC Plan Review
Discuss more specific key topics or issues