Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

Massachusetts 2A Hoisting License A Latest Update (206 Terms in this set)

Document preview thumbnail
Preview 2 out of 9 pages

Massachusetts 2A Hoisting License A Latest Update (206 Terms in this set)

Content preview

1



Massachusetts 2A Hoisting License A Latest Update
(206 Terms in this set)
A 2A license allows the license holder to excavators, backhoes and loaders, front-end loaders, compact hoisting machinery
operate what? excluding classes 1, 3 & 4.

Fine for operating without a license $500-$3000 and or 3 months in jail

What law governs hoisting equipment? M.G.L. c. 146 section 53

What regulations govern hoisting 520 CMR 6
equipment?

What organization enforces 520 CMR 6 Division of Professional Licensure, Office of Public Safety and Inspections.

What regulations govern trenching? 520 CMR 14 - Jackie's Law

OSHA regulations OSHA 1910 & 1926

ANSI American National Standards Institute

ASME American Society of Mechanical Engineers

Compact hoisting machinery hoisting machinery under 10,000 lbs

DOT Department of Transportation

Emergency Procedure Actions required to be taken when imminent danger may occur

Property damage Damage to property exceeding $5000

Minimum age to obtain a 2A license 18

SAE Society of Automotive Engineers

Hand signal rules for excavators SAE J1307 - 2002

Equipment that requires a license to 10' vertical lift, 1/4 yd bucket capacity, 500 lb lift capacity
operate

Continuing education credit hours are 4 hrs
required for a 2A license

By request for 1 year for failure to obtain required credit hours. Cannot operate
Inactive status
under license.

Maintenance, repair, and refueling can be When machine is inoperable and secure
performed only when
OSHA required daily logs must include all parts subject to wear
inspection of

Inspection records must be kept with the hoisting machinery at all times

Prior to starting the machinery the make a complete walk-around (circle check), making sure the equipment is free of
operator must people and safe to operate.

With regards to distractions, the operator engage in any practice that will divert their attention.
shall not

With regards to operating machinery with erection of barricades or warning lines to prevent entry into the swinging
a rotating superstructure superstructure's radius.

With regards to signaling operators are shall only respond to signal persons unless there is an emergency


1

, 2
Securing unattended machinery is the the operator prior to leaving the equipment
responsibility of

Is walking under an loaded bucket No way
permitted

Minimum clearance from power lines 10 ft

Dig safe and utilities not covered by them any excavation
must be contacted prior to

With regard to Dig Safe permitting operators must have a permit number, start date and time.

With regards to operator exposure to the a suitable cab must be provided
elements and hazards

a licensee, temporary permit holder, or apprentice licensee under the direct
Excavating machines shall be operated by
supervision of a duly licensed operator

The only individuals allowed to stand Pitman and/or excavating crew
within the working radius of an excavator
while operating

Machinery is allowed to Straddle a trench not at all

Time that an operator must report an 1 hr after the incident or when it was discovered
incident to the Department of
Professional Licensure

After reporting an incident, the machinery not be moved or dismantled unless required to protect life, property, removal of
shall injured persons, bodies, or to permit the flow of emergency vehicles

Written incident reports shall be within 48 hours
submitted to the Department of
Professional Licensure

A license suspension may be appealed one week
within

with either forearm vertical, forefinger pointing
up, move hand in a small horizontal circle
Hand signal to raise load vertically



with either arm extended downward, forefinger
pointing down, move hand in small horizontal
Hand signal to lower load vertically
circles



with either arm extended, hand raised and open
toward direction of movement, move hand in
Hand signal to move load in horizontally
direction of required movement



with either arm extended, hand raised and open
Hand signal to move load out toward direction of movement, move hand in
horizontally direction of required movement



with both hands clenched point thumbs outward

Hand signal to move arm outward




2

Document information

Uploaded on
April 12, 2025
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Boffin
3.8
(457)
Sold
1854
Followers
1470
Items
7198
Last sold
1 week ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions