COMNAVAIRFORINST 4790.2C (CH. 9)
QUESTIONS AND ANSWERS WITH
VERIFIED SOLUTIONS 100% CORRECT
NEWLY UPDATED 2025
Chapter 9 - ANSWER✔✔9.1 Organizational Level (O-Level) and Intermediate
Level (I-Level) Material Management..................1
9.1.1 Navy Supply
System.........................................................................................................................
..1
9.1.2 Policies and Concepts
.........................................................................................................................1
9.1.3 Supply and Maintenance Responsibilities
..........................................................................................5
9.1.4 Supply Department
Organization........................................................................................................8
9.1.5 Supply Department
Communications.................................................................................................8
9.1.6 Material Reporting
..............................................................................................................................9
9.1.7 Allowance Determination and
Outfitting..........................................................................................11
9.1.8 SERVMARTs and MINIMARTs
.....................................................................................................14
9.1.9 Integrated Material
Management......................................................................................................14
9.1.10 Indirect
Material........................................................................................................................
......15
9.1.11 Supply Reference Publications
.......................................................................................................15
9.1.12
Training.......................................................................................................................
....................19
9.1.13 A
- ANSWER✔✔9.1 Organizational Level (O-Level) and Intermediate Level (I-
Level) Material Management..................1
,9.1.1 Navy Supply
System.........................................................................................................................
..1
9.1.2 Policies and Concepts
.........................................................................................................................1
9.1.3 Supply and Maintenance Responsibilities
..........................................................................................5
9.1.4 Supply Department
Organization........................................................................................................8
9.1.5 Supply Department
Communications.................................................................................................8
9.1.6 Material Reporting
..............................................................................................................................9
9.1.7 Allowance Determination and
Outfitting..........................................................................................11
9.1.8 SERVMARTs and MINIMARTs
.....................................................................................................14
9.1.9 Integrated Material
Management......................................................................................................14
9.1.10 Indirect
Material........................................................................................................................
......15
9.1.11 Supply Reference Publications
.......................................................................................................15
9.1.12
Training.......................................................................................................................
....................19
9.1.13 A
- ANSWER✔✔9.1.19 Supply Response Section (SRS)
.....................................................................................................24
9.1.20 Requisition Control Unit
(RCU).....................................................................................................24
9.1.21 Program Management Unit
(PMU).................................................................................................27
9.1.22 Technical Research Unit
(TRU)......................................................................................................29
9.1.23 Material Delivery Unit
(MDU).......................................................................................................29
,9.1.24 Pre-expended Bin (PEB)
Unit.........................................................................................................30
9.1.25 Component Control Section
(CCS).................................................................................................31
9.1.26 Document Control Unit
(DCU).......................................................................................................32
9.1.27 Local Repair Cycle Asset Storage Unit
(LRCA)............................................................................33
9.1.28 Awaiting Parts Unit
(AWP)............................................................................................................35
9.1.29 Supply Screening Unit (SSU)
.........................................................................................................39
9.1.30 Special
Procedures...................................................................................................................
.......41
9.2 D-Level Material
Management................................................................................................................
.43
9.2.1 General....
- ANSWER✔✔9.2.6 Procurement Process and Acquisition Lead Time
............................................................................54
9.2.7 Life of Rework
Contracts..................................................................................................................54
9.2.8 Constructive
Change.........................................................................................................................
54
9.2.9 Supply Discrepancy Report
..............................................................................................................55
9.2.10 Shelf Life
Management................................................................................................................
...55
9.2.11 Hazardous Waste
Management.......................................................................................................55
9.2.12 BOSS III
Program.......................................................................................................................
....55
9.2.13 Price Challenge Hotline
..................................................................................................................57
, Figure 9-1: Supply Department Organization Ashore
............................................................................59
Figure 9-2: CV or CVN Supply Department Organization Afloat
.........................................................60
Figure 9-3: ASD
Organization................................................................................................................
61
Figure 9-4: LRCA Table
.........................................................................................................................62
Figure 9-5: LRCA Table
(continued)......................................................................................................63
Figure 9-6: Commer
- ANSWER✔✔CHAPTER 9
Material Management
9.1 Organizational Level (O-Level) and Intermediate Level (I-Level) Material
Management
9.1.1 Navy Supply System
9.1.1.1 The major responsibility of the Navy Supply System is to provide material
in support of the operation
and maintenance of aeronautical equipment. Every effort will be made to have
material located when and
where it is needed. The intent is to make the relationship between the supplier and
the user as simple as
possible within the boundaries of logistic directives published by higher authority.
Navy stock is generally
replenished on a system basis as a direct result of recorded usage and demand data,
or on a program basis,
from precalculated usage.
9.1.1.2 All elements of the Navy and Marine Corps, regardless of size and location,
have an assigned activity
to which they can submit requests for material. In the case of maintenance
activities, this request starts at
O-level, I-level, and D-level maintenance and flows to a designated point in the
Supply System.
9.1.1.3 The Uniform Material Movement and Issue Priority System (UMMIPS)
assigns a Force Activity
Designator (FAD) to all activities in the Navy establishment for determining
priorities for material support.
QUESTIONS AND ANSWERS WITH
VERIFIED SOLUTIONS 100% CORRECT
NEWLY UPDATED 2025
Chapter 9 - ANSWER✔✔9.1 Organizational Level (O-Level) and Intermediate
Level (I-Level) Material Management..................1
9.1.1 Navy Supply
System.........................................................................................................................
..1
9.1.2 Policies and Concepts
.........................................................................................................................1
9.1.3 Supply and Maintenance Responsibilities
..........................................................................................5
9.1.4 Supply Department
Organization........................................................................................................8
9.1.5 Supply Department
Communications.................................................................................................8
9.1.6 Material Reporting
..............................................................................................................................9
9.1.7 Allowance Determination and
Outfitting..........................................................................................11
9.1.8 SERVMARTs and MINIMARTs
.....................................................................................................14
9.1.9 Integrated Material
Management......................................................................................................14
9.1.10 Indirect
Material........................................................................................................................
......15
9.1.11 Supply Reference Publications
.......................................................................................................15
9.1.12
Training.......................................................................................................................
....................19
9.1.13 A
- ANSWER✔✔9.1 Organizational Level (O-Level) and Intermediate Level (I-
Level) Material Management..................1
,9.1.1 Navy Supply
System.........................................................................................................................
..1
9.1.2 Policies and Concepts
.........................................................................................................................1
9.1.3 Supply and Maintenance Responsibilities
..........................................................................................5
9.1.4 Supply Department
Organization........................................................................................................8
9.1.5 Supply Department
Communications.................................................................................................8
9.1.6 Material Reporting
..............................................................................................................................9
9.1.7 Allowance Determination and
Outfitting..........................................................................................11
9.1.8 SERVMARTs and MINIMARTs
.....................................................................................................14
9.1.9 Integrated Material
Management......................................................................................................14
9.1.10 Indirect
Material........................................................................................................................
......15
9.1.11 Supply Reference Publications
.......................................................................................................15
9.1.12
Training.......................................................................................................................
....................19
9.1.13 A
- ANSWER✔✔9.1.19 Supply Response Section (SRS)
.....................................................................................................24
9.1.20 Requisition Control Unit
(RCU).....................................................................................................24
9.1.21 Program Management Unit
(PMU).................................................................................................27
9.1.22 Technical Research Unit
(TRU)......................................................................................................29
9.1.23 Material Delivery Unit
(MDU).......................................................................................................29
,9.1.24 Pre-expended Bin (PEB)
Unit.........................................................................................................30
9.1.25 Component Control Section
(CCS).................................................................................................31
9.1.26 Document Control Unit
(DCU).......................................................................................................32
9.1.27 Local Repair Cycle Asset Storage Unit
(LRCA)............................................................................33
9.1.28 Awaiting Parts Unit
(AWP)............................................................................................................35
9.1.29 Supply Screening Unit (SSU)
.........................................................................................................39
9.1.30 Special
Procedures...................................................................................................................
.......41
9.2 D-Level Material
Management................................................................................................................
.43
9.2.1 General....
- ANSWER✔✔9.2.6 Procurement Process and Acquisition Lead Time
............................................................................54
9.2.7 Life of Rework
Contracts..................................................................................................................54
9.2.8 Constructive
Change.........................................................................................................................
54
9.2.9 Supply Discrepancy Report
..............................................................................................................55
9.2.10 Shelf Life
Management................................................................................................................
...55
9.2.11 Hazardous Waste
Management.......................................................................................................55
9.2.12 BOSS III
Program.......................................................................................................................
....55
9.2.13 Price Challenge Hotline
..................................................................................................................57
, Figure 9-1: Supply Department Organization Ashore
............................................................................59
Figure 9-2: CV or CVN Supply Department Organization Afloat
.........................................................60
Figure 9-3: ASD
Organization................................................................................................................
61
Figure 9-4: LRCA Table
.........................................................................................................................62
Figure 9-5: LRCA Table
(continued)......................................................................................................63
Figure 9-6: Commer
- ANSWER✔✔CHAPTER 9
Material Management
9.1 Organizational Level (O-Level) and Intermediate Level (I-Level) Material
Management
9.1.1 Navy Supply System
9.1.1.1 The major responsibility of the Navy Supply System is to provide material
in support of the operation
and maintenance of aeronautical equipment. Every effort will be made to have
material located when and
where it is needed. The intent is to make the relationship between the supplier and
the user as simple as
possible within the boundaries of logistic directives published by higher authority.
Navy stock is generally
replenished on a system basis as a direct result of recorded usage and demand data,
or on a program basis,
from precalculated usage.
9.1.1.2 All elements of the Navy and Marine Corps, regardless of size and location,
have an assigned activity
to which they can submit requests for material. In the case of maintenance
activities, this request starts at
O-level, I-level, and D-level maintenance and flows to a designated point in the
Supply System.
9.1.1.3 The Uniform Material Movement and Issue Priority System (UMMIPS)
assigns a Force Activity
Designator (FAD) to all activities in the Navy establishment for determining
priorities for material support.