100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ICSI RTPM (Study for Telecommunication Project Manager) FINAL EXAM PREP 2025/2026 ACCURATE QUESTIONS WITH CORRECT DETAILED ANSWERS || 100% GUARANTEED PASS <LATEST VERSION>

Rating
-
Sold
-
Pages
38
Grade
A+
Uploaded on
02-04-2025
Written in
2024/2025

ICSI RTPM (Study for Telecommunication Project Manager) FINAL EXAM PREP 2025/2026 ACCURATE QUESTIONS WITH CORRECT DETAILED ANSWERS || 100% GUARANTEED PASS &lt;LATEST VERSION&gt; 1. Design Phases - ANSWER Schematic Design Design Development Construction Document 2. Schematic Design - ANSWER Prepared for the owner, includes sketches, graphics, logical diagrams, general design criteria and cost estimates 3. Design Development - ANSWER After schematic designs approved by owner, design team begins design development Includes outline, specs, drawing and cost estimates 4. Formal reviews begin at what percentage of design development - ANSWER 50 and 80 5. Construction Documents - ANSWER After owner approves DD, design team prepares ___________ __________, which are used to obtain pricing of required work 6. Owner Bidding Role - ANSWER Supplies bidding and contracting requirements, sends invites to prospective bidders 7. Design Team Bidding Role - ANSWER Produce any Addenda based on the QBD 8. Construction Manager Bidding Role - ANSWER May lead or participate in bid process 9. General Contractor Bidding Roles - ANSWER Prepare and submit their bids to the owner 10. Contractor, Subcontractor Bidding Roles - ANSWER Prepare and submit their bids to the General Contractor 11. Types of Bid Structures - ANSWER RFP RFQ DBB DB CMAR IPD 12. Request for Quotation (RFQ) - ANSWER A type of procurement document used to request price quotations from prospective sellers of common or standard products or services. Sometimes used in place of request for proposal and, in some application areas, it may have a narrower or more specific meaning. 13. Design-Bid-Build (DBB) - ANSWER Owner contracts with separate design and construction team for a project. 1). Design - Design team works directly for Owner 2). Bid - Owner solicits docs for bid by contractor, review and award contract 3). Build - Construction Design team oversees construction 14. Design-Build (DB) - ANSWER Delivery method whereby the owner contacts with a single entitiy Construction and Design phases are overlapping 15. Who does the design professional work for in Design Build - ANSWER General Contractor 16. Who is included in the Design Build Team? - ANSWER General Contractor Subcontractor Design Professional 17. Consruction Manager at Risk (CMAR) - ANSWER Delivery method where CM contracts to deliver project within a Guaranteed Maximum Price (GMP) 18. Integrated Project Delivery (IPD) - ANSWER Delivery method that organizes project team, integrates all aspects of a design and construction team to a single team effort 19. Which individuals make up the IPD? - ANSWER Owner Design Professional Contractor 20. Types of Bids - ANSWER Low Negotiated 21. in the United States, bidding laws often require the mechanical, plumbing, and electrical portions of the work to be bid and contracted separately from the general construction contract - ANSWER Multiple prime bid or filed sub-bid. 22. Prime Contractor - ANSWER Contractor who is awarded the contract 23. Owners Role During Construction Phase - ANSWER Make payments to contractor 24. Owner can at any time of the project - ANSWER Stop work Complete any uncompleted work Clean the site Partially occupy the building Terminate without clause 25. Design Team's Role During Construction - ANSWER Inspect and observe contruction Design team review submittals Submit change orders, (modify any contract docs) 26. Construction Manager's Role During Construction - ANSWER Coordinates construction In charge of access, safety, storage of materials 27. General Contractor and Subcontractor's Role During Construction - ANSWER Complete Work 28. Who is Responsible for Acquiring Permits - ANSWER General Contractor and Subcontractor 29. Who is Responsible for Test Results - ANSWER General Contractor and Subcontractor 30. Who is Responsible for Submittals - ANSWER General Contractor and Subcontractor 31. Who is Responsible for Maintaning a Safe Work Environment During Construction - ANSWER General Contractor and Subcontractor 32. Who is Responsible for Completing Punch List - ANSWER General Contractor and Subcontractor 33. Types of Contracts - ANSWER Stipulated Sum Cost Plus Fee Unit Price 34. Stipulated Sum - ANSWER Contractor submits a fixed price for SoW, Mostly Low Bids, can be negotiated 35. Cost Plus Fee - ANSWER Contractor is reinbursed for the actual costs plus a fee. May be required to submit a GMP 36. Unit Price - ANSWER Used to obtain pricing when SoW has not been completed

Show more Read less
Institution
ICSI RTPM
Course
ICSI RTPM











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ICSI RTPM
Course
ICSI RTPM

Document information

Uploaded on
April 2, 2025
Number of pages
38
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ICSI RTPM (Study for Telecommunication
Project Manager) FINAL EXAM PREP
2025/2026 ACCURATE QUESTIONS WITH CORRECT
DETAILED ANSWERS || 100% GUARANTEED PASS
<LATEST VERSION>




1. Design Phases - ANSWER ✓ Schematic Design
Design Development
Construction Document

2. Schematic Design - ANSWER ✓ Prepared for the owner, includes sketches,
graphics, logical diagrams, general design criteria and cost estimates

3. Design Development - ANSWER ✓ After schematic designs approved by
owner, design team begins design development
Includes outline, specs, drawing and cost estimates

4. Formal reviews begin at what percentage of design development -
ANSWER ✓ 50 and 80

5. Construction Documents - ANSWER ✓ After owner approves DD, design
team prepares ___________ __________, which are used to obtain pricing
of required work

6. Owner Bidding Role - ANSWER ✓ Supplies bidding and contracting
requirements, sends invites to prospective bidders

7. Design Team Bidding Role - ANSWER ✓ Produce any Addenda based on
the QBD

,8. Construction Manager Bidding Role - ANSWER ✓ May lead or participate
in bid process

9. General Contractor Bidding Roles - ANSWER ✓ Prepare and submit their
bids to the owner

10.Contractor, Subcontractor Bidding Roles - ANSWER ✓ Prepare and submit
their bids to the General Contractor

11.Types of Bid Structures - ANSWER ✓ RFP
RFQ
DBB
DB
CMAR
IPD

12.Request for Quotation (RFQ) - ANSWER ✓ A type of procurement
document used to request price quotations from prospective sellers of
common or standard products or services. Sometimes used in place of
request for proposal and, in some application areas, it may have a narrower
or more specific meaning.

13.Design-Bid-Build (DBB) - ANSWER ✓ Owner contracts with separate
design and construction team for a project.
1). Design - Design team works directly for Owner
2). Bid - Owner solicits docs for bid by contractor, review and award
contract
3). Build - Construction Design team oversees construction

14.Design-Build (DB) - ANSWER ✓ Delivery method whereby the owner
contacts with a single entitiy
Construction and Design phases are overlapping

15.Who does the design professional work for in Design Build - ANSWER ✓
General Contractor

16.Who is included in the Design Build Team? - ANSWER ✓ General
Contractor

, Subcontractor
Design Professional

17.Consruction Manager at Risk (CMAR) - ANSWER ✓ Delivery method
where CM contracts to deliver project within a Guaranteed Maximum Price
(GMP)

18.Integrated Project Delivery (IPD) - ANSWER ✓ Delivery method that
organizes project team, integrates all aspects of a design and construction
team to a single team effort

19.Which individuals make up the IPD? - ANSWER ✓ Owner
Design Professional
Contractor

20.Types of Bids - ANSWER ✓ Low
Negotiated

21.in the United States, bidding laws often require the
mechanical, plumbing, and electrical portions of the work to be bid and
contracted separately
from the general construction contract - ANSWER ✓ Multiple prime bid or
filed sub-bid.

22.Prime Contractor - ANSWER ✓ Contractor who is awarded the contract

23.Owners Role During Construction Phase - ANSWER ✓ Make payments to
contractor

24.Owner can at any time of the project - ANSWER ✓ Stop work
Complete any uncompleted work
Clean the site
Partially occupy the building
Terminate without clause

25.Design Team's Role During Construction - ANSWER ✓ Inspect and observe
contruction
Design team review submittals

, Submit change orders, (modify any contract docs)

26.Construction Manager's Role During Construction - ANSWER ✓
Coordinates construction
In charge of access, safety, storage of materials

27.General Contractor and Subcontractor's Role During Construction -
ANSWER ✓ Complete Work

28.Who is Responsible for Acquiring Permits - ANSWER ✓ General
Contractor and Subcontractor

29.Who is Responsible for Test Results - ANSWER ✓ General Contractor and
Subcontractor

30.Who is Responsible for Submittals - ANSWER ✓ General Contractor and
Subcontractor

31.Who is Responsible for Maintaning a Safe Work Environment During
Construction - ANSWER ✓ General Contractor and Subcontractor

32.Who is Responsible for Completing Punch List - ANSWER ✓ General
Contractor and Subcontractor

33.Types of Contracts - ANSWER ✓ Stipulated Sum
Cost Plus Fee
Unit Price

34.Stipulated Sum - ANSWER ✓ Contractor submits a fixed price for SoW,
Mostly Low Bids, can be negotiated

35.Cost Plus Fee - ANSWER ✓ Contractor is reinbursed for the actual costs
plus a fee. May be required to submit a GMP

36.Unit Price - ANSWER ✓ Used to obtain pricing when SoW has not been
completed

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ProfBenjamin Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
416
Member since
1 year
Number of followers
14
Documents
2928
Last sold
1 day ago
EXCELLENT ACHIEVERS LIBRARY

As a professional tutor, I provide exceptional assistance with homework, quizzes, and exams across various subjects, including Psychology, Nursing, Biological Sciences, Business, Engineering, Human Resource Management, and Mathematics. I am dedicated to offering high-quality support and ensuring that all work meets scholarly standards. To enhance the effectiveness of our services, I work with a team of experienced tutors to create comprehensive and effective revision materials. Together, we are committed to helping students achieve excellent grades through our collaborative efforts and expertise.

Read more Read less
3.9

77 reviews

5
35
4
12
3
22
2
4
1
4

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions