With complete solution 100% PASS
Project Manager - Correct Answers Is responsible for preparing budgets, working capital, and
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
calculating cash flow management. The manager is also responsible for coordinating the
II! II! II! II! II! II! II! II! II! II! II! II!
schedule with the budget, hiring and overseeing subcontractors, creating the execution strategy,
II! II! II! II! II! II! II! II! II! II! II! II!
confirming change orders, and contacting owners and designers. The manager also develops the
II! II! II! II! II! II! II! II! II! II! II! II! II!
estimate with the Superintendant.
II! II! II! II!
II! Fences less than 6 feet - Correct Answers What is not considered work exempt from a permit?
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
A. Swings and Playground Equipment
II! II! II! II!
B. Sidewalks
II!
C. Fences less than 6 feet
II! II! II! II! II!
D. Interior Painting
II! II!
II! Officer in Charge - Correct Answers is the individual who signs contracts and take charge in a
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! crisis.
II! 19 - Correct Answers What is the R-value insulation requirement for a residential floor climate
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! zone 3? II!
A. 13 II!
B. 19 II!
C. 30 II!
D. 38 II!
,II! 2,500 - Correct Answers What is the minimum compressive strength in psi for a concrete
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! basement slab with negligible weathering potential? II! II! II! II! II!
A. 1,500II!
B. 2,000
II!
C. 2,500
II!
D. 4,000II!
II! 3,000 - Correct Answers An accessory structure is a structure not greater than ____ square feet.
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
A. 1,000II!
B. 2,000
II!
C. 3,000
II!
D. 4,000II!
II! 32 - Correct Answers For "Mean of Egress ", what is the minimum width of each door opening in
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! inches?
A. 24 II!
B. 28 II!
C. 32 II!
D. 36 II!
II! 180 days - Correct Answers A permit becomes invalid if the work authorized by the permit does
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! not begin in___days.
II! II!
A. 90 II! II!
,B. 120 II!
C. 180 II!
D. 365 II!
II! TRUE - Correct Answers The building permit shall be kept on site until the work is complete.
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
A. TRUE II! II!
B. FALSE II!
II! Building Official - Correct Answers Who is authorized to establish a refund policy or permit
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! fees?
A. Building Official
II! II!
B. Owner II!
C. Accountant
II!
D. Designer II!
II! 3 - Correct Answers Exterior wood framing walls shall be a minimum of____grade wood.
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
A. Utility II! II!
B. 2 II!
C. 3 II!
D. 4 II!
II! After permitted work is complete - Correct Answers When shall a final inspection be
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! conducted?
, A. After the permit is issued
II! II! II! II! II! II!
B. After permitted work is complete
II! II! II! II! II!
C. After the occupants move in
II! II! II! II! II! II!
D. Upon beginning the permitted work
II! II! II! II! II!
II! FALSE - Correct Answers You are allowed to continue work safely after a stop work order has
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! been issued. II!
A. TRUE II! II!
B. FALSE
II!
II! 50 - Correct Answers Live loads or floors and roofs must be posted by the owner when they
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! exceed____PSF.
A. 25 II!
B. 30 II!
C. 50 II!
D. 100 II!
II! Traffic Control Plan - Correct Answers Not required on a site plan.
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
A. Location of the new construction
II! II! II! II! II!
B. Distance from lot lines
II! II! II! II! II!
C. Traffic control Plan
II! II! II!
D. Location of existing structures
II! II! II! II!