Alabama Contractors License Practice Exam
(2025) comprehensive questions and verified
detailed solutions ( MULTIPLE CHOICES) |100%
CORRECT!!
Say thanks
Save
Terms in this set (204)
Is responsible for Project Manager
preparing budgets,
working capital, and
calculating cash flow
management. The
manager is also
responsible for
coordinating the
schedule with the
budget, hiring and
overseeing
subcontractors, creating
the execution strategy,
confirming change
orders, and contacting
owners and designers.
The manager also
develops the estimate
with the Superintendant.
https://quizlet.com/1023691069/alabama-contractors-license-practice-exam-2025-comprehensive-questions-and-verified-detailed-solutions-multi… 1/54
,3/27/25, 12:39 PM Alabama Contractors License Practice Exam (2025) comprehensive questions and verified detailed solutions ( MULTIPLE CH…
What is not considered Fences less than 6 feet
work exempt from a
permit?
A. Swings and
Playground Equipment
B. Sidewalks
C. Fences less than 6 feet
D. Interior Painting
is the individual who Officer in Charge
signs contracts and take
charge in a crisis.
What is the R-value 19
insulation requirement for
a residential floor climate
zone 3?
A. 13
B. 19
C. 30
D. 38
What is the minimum 2,500
compressive strength in
psi for a concrete
basement slab with
negligible weathering
potential?
A. 1,500
B. 2,000
C. 2,500
D. 4,000
https://quizlet.com/1023691069/alabama-contractors-license-practice-exam-2025-comprehensive-questions-and-verified-detailed-solutions-multi… 2/54
,3/27/25, 12:39 PM Alabama Contractors License Practice Exam (2025) comprehensive questions and verified detailed solutions ( MULTIPLE CH…
An accessory structure is 3,000
a structure not greater
than ____ square feet.
A. 1,000
B. 2,000
C. 3,000
D. 4,000
For "Mean of Egress ", 32
what is the minimum
width of each door
opening in inches?
A. 24
B. 28
C. 32
D. 36
A permit becomes invalid 180 days
if the work authorized by
the permit does not
begin in___days.
A. 90
B. 120
C. 180
D. 365
The building permit shall TRUE
be kept on site until the
work is complete.
A. TRUE
B. FALSE
https://quizlet.com/1023691069/alabama-contractors-license-practice-exam-2025-comprehensive-questions-and-verified-detailed-solutions-multi… 3/54
, 3/27/25, 12:39 PM Alabama Contractors License Practice Exam (2025) comprehensive questions and verified detailed solutions ( MULTIPLE CH…
Who is authorized to Building Official
establish a refund policy
or permit fees?
A. Building Official
B. Owner
C. Accountant
D. Designer
Exterior wood framing 3
walls shall be a minimum
of____grade wood.
A. Utility
B. 2
C. 3
D. 4
When shall a final After permitted work is complete
inspection be
conducted?
A. After the permit is
issued
B. After permitted work is
complete
C. After the occupants
move in
D. Upon beginning the
permitted work
You are allowed to FALSE
continue work safely after
a stop work order has
been issued.
A. TRUE
B. FALSE