100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

PJM Sample Test Review Questions And Answers |Latest 2025 | Guaranteed Pass

Rating
-
Sold
-
Pages
17
Grade
A+
Uploaded on
26-03-2025
Written in
2024/2025

©FYNDLAY 2025 ALL RIGHTS RESERVED 11:49 AM A+ 1 | P a g e PJM Sample Test Review Questions And Answers |Latest 2025 | Guaranteed Pass Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - Answeroff cost out of merit. Monitoring ___________ may give insights into system constraints. - AnswerMonitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. - AnswerPJM calls on synchronized reserves If not cancelled by PJM, the minimum generation alert expires at the end of the specified ______________. - Answerlight load period When PJM declares a hot weather alert, the generation dispatcher should determine if maintenance can be deferred and notify all generating stations and key personnel. - Answer During system restoration, the two categories of reserves are dynamic and spinning. - Answer During system restoration, frequency should be maintained between 59.75 and 61.00 Hertz. - Answer PJM issues a heavy load voltage schedule. Member companies who own generation facilities should ensure voltage regulators on generating units are in service & automatic. - Answer ©FYNDLAY 2025 ALL RIGHTS RESERVED 11:49 AM A+ 2 | P a g e A unit being dispatched economically by PJM should set its megawatt output based on the unit's dispatch rate or desired megawatt level. - Answer A fossil steam unit is considered fuel limited when it is not capable of running at its maximum capacity for the next 72 hours - Answer During system restoration prior to synchronization of a unit, the dispatcher should ensure sufficient load is available to stabilize unit operation. - Answer A large unit in an external control area near PJM/PJM West trips. The PJM operator will see ace remain the same, frequency decrease. - Answer LMPs will change when marginal generator output changes - Answer The two control signals sent by the PJM E M S are regulation and dispatch rate (desired MW output). - Answer An all-call is the one-way communication system used to disseminate information to market operation centers. - Answer Real time bus prices may be monitored using data viewer. - Answer Not offering an available PJM capacity resource into the day ahead market is a violation of PJMs two settlement market rules. - Answer A unit that fails to start when scheduled, would be classified as an unplanned outage. - Answer

Show more Read less
Institution
PJM
Course
PJM










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PJM
Course
PJM

Document information

Uploaded on
March 26, 2025
Number of pages
17
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

©FYNDLAY 2025 ALL RIGHTS RESERVED 11:49 AM A+




PJM Sample Test Review Questions And
Answers |Latest 2025 | Guaranteed Pass


Real time transmission constraints or contingencies may be alleviated with generators
operating ______________ - Answer✔off cost out of merit.



Monitoring ___________ may give insights into system constraints. - Answer✔Monitoring
LMP's


PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. -
Answer✔PJM calls on synchronized reserves


If not cancelled by PJM, the minimum generation alert expires at the end of the specified
______________. - Answer✔light load period


When PJM declares a hot weather alert, the generation dispatcher should determine if
maintenance can be deferred and notify all generating stations and key personnel. - Answer✔



During system restoration, the two categories of reserves are dynamic and spinning. - Answer✔


During system restoration, frequency should be maintained between 59.75 and 61.00 Hertz. -
Answer✔


PJM issues a heavy load voltage schedule. Member companies who own generation facilities
should ensure voltage regulators on generating units are in service & automatic. - Answer✔

1|Page

, ©FYNDLAY 2025 ALL RIGHTS RESERVED 11:49 AM A+




A unit being dispatched economically by PJM should set its megawatt output based on the
unit's dispatch rate or desired megawatt level. - Answer✔


A fossil steam unit is considered fuel limited when it is not capable of running at its maximum
capacity for the next 72 hours - Answer✔


During system restoration prior to synchronization of a unit, the dispatcher should ensure
sufficient load is available to stabilize unit operation. - Answer✔


A large unit in an external control area near PJM/PJM West trips. The PJM operator will see ace
remain the same, frequency decrease. - Answer✔



LMPs will change when marginal generator output changes - Answer✔


The two control signals sent by the PJM E M S are regulation and dispatch rate (desired MW
output). - Answer✔


An all-call is the one-way communication system used to disseminate information to market
operation centers. - Answer✔



Real time bus prices may be monitored using data viewer. - Answer✔


Not offering an available PJM capacity resource into the day ahead market is a violation of PJMs
two settlement market rules. - Answer✔


A unit that fails to start when scheduled, would be classified as an unplanned outage. -
Answer✔



2|Page

, ©FYNDLAY 2025 ALL RIGHTS RESERVED 11:49 AM A+


Maximum Generation Emergency is declared by PJM when generation is required above the
highest incremental economic cost. - Answer✔


Maintenance outages are permitted when a unit can be held online until the following Monday,
and system reliability is not affected - Answer✔



If PJM ace shows over-generation, actual imports are less than scheduled. - Answer✔


PJM will request a Supplementary Status Report when a Maximum Generation Emergency Alert
is issued. - Answer✔


If a fossil steam unit has less than 32 hours of fuel at maximum capacity, it should be bid at
maximum emergency. - Answer✔


The loss of a large generation unit on the PJM system can be detected by monitoring frequency
and PJM ace. - Answer✔


A 1000 megawatt unit has tripped in the PJM control area and the PJM ace now indicates
under-generation of 1050 Megawatt. PJM should request 100% synchronized reserves be
loaded. - Answer✔


Alerts are issued in advance of a scheduled load period to allow sufficient time for the
generation dispatcher to prepare for the anticipated capacity shortages - Answer✔


The amount of synchronized reserves must be large enough to cover the loss of the largest
single energy contingency. - Answer✔


When preparing a supplementary status report (SSR), a steam unit that has 30 hours of fuel
remaining. This unit should be reported as a resource limited unit. - Answer✔



3|Page

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Fyndlay Kaplan University
View profile
Follow You need to be logged in order to follow users or courses
Sold
355
Member since
1 year
Number of followers
80
Documents
18669
Last sold
11 hours ago
Scholar\'s Sanctuary.

Explore a Vast Collection of Finely Made Learning Materials.

3.7

68 reviews

5
32
4
8
3
13
2
6
1
9

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions